ASX ANNOUNCEMENT 16TH
JANUARY 2026
ASX:VTX
ORE PRODUCTION UPDATE,
REWARD GOLD MINE
Operational Milestones
✓ From the first 12 days of production in January 2026, 70 oz of gold was shipped
on 13th January 2026.
✓ The high grade 640-Mica Vein-1618N (see Figure 3) had some contribution to the
production with low grade development material from Decline 3 (see Figure 2,
under Lift 1) contributing to the remainder.
✓ Panels 2 and 3 will be fired from the 640-Mica Vein-1618N (see Figure 3) with:
o Panel 2, 48 tonnes at resource grade 37.00g/t and mined tonnes of 233
and grade of 7.61g/t; and
o Panel 3, 34 tonnes at resource grade 27.74g/t and mined tonnes of 156
and grade of 6.14g/t
✓ Decline 3 has 10m of rehabilitation ‘rehab’ to get to the first flatback* panel to
be mined (two 200mm + reefs with grades up to 100+ g/t are located within the
area to be rehabilitated, see Figure 1). Some 6,400 tonnes are set to be mined in
the flatback panels.
✓ The plant will be supplemented with higher grade feed from the 640-Mica Vein-
1618N long hole stope and the 640-Mica Vein-1300N or “Humpty Dumpty” air leg
stope (see Figures 4 & 4a).
✓ The high grade 640-Mica Vein-1618N stope was first fired on 19th December
2025, with 80 tonnes fired of a total of 277 tonnes @16.60g/t. Tele remotes are
currently being set up for that location, with the remaining two firings to occur as
soon as the remaining ore from the first firing is bogged.
✓ Final sales revenue for December 2025 was $325,456.
*Flatback stoping (or Cut & Fill stoping) forms one method, where both reefs
which are up to 3.5m apart are bulk mined and the lower diluted grade material
is presented to the TOMRA ore sorter for upgrading.
2
Vertex Minerals Limited (ASX: VTX) (“Company”) is pleased to announce that its gold
production continues to rise, underpinned by increased underground stoping ore
and higher grades.
The emphasis remains on increasing the stoping rate to a steady state, which is
expected to deliver further increases in grade for the gold gravity mill as the
underground mining rate pares the plant’s throughput.
The development work taken to get to mining has taken longer than first planned.
The reasons for the delays are due to the ground conditions in the declines and
around our stopes. The ground, that had been underwater for some 14 years, and
when dewatered was found to be in poor condition and unsafe to work in. This has
meant the mining team had to bolt and mesh the declines and, in spots, grout cables
into the rock. This work is ongoing, but we are still able to mine some stopes and
derive some grade from development material.
The Company expects to see the benefits from the establishment of multiple mining
areas and development levels for underground mining production going forward.
The Company had TOMRA technicians out to ‘tweak the sorter’ to work in line with
the underground ore feed. The plant has also undergone further ‘tweaks’ to increase
production in line with the increased underground stope material and higher
grades. The Company has also increased security systems and communications
equipment to be in line with the increasing gold production.
3
Figure 1 Plan view of the decline 3 flatback stopes showing the two main veins Mica 1 and Mica 2
Figure 2 Long section through the Decline 3 flatbacks
4
Figure 3 Long section through 640 Mica Vein 1618N showing Panels 1, 2 and 3
Figures 4 & 4a “Humpty Dumpty” stope
5
This announcement has been approved by the Board.
Further Information:
Roger Jackson, Executive Chairman Tully Richards, Technical Director
roger@vertexminerals.com.au tully@vertexminerals.com.au
Follow Vertex Minerals on LinkedIn
Vertex Minerals Limited
ASX Code: VTX
ABN: 68 650 116 153
6
Vertex Flagship Project
✓ Commenced gold processing in new Gekko gravity gold plant
✓ 100% owned mining operation
✓ No hedge
✓ High grade gold resource and reserve 225 ozs at 16.7g/t + more
✓ Inherited AU$25 million of underground development at Reward
✓ 1.8m Au ozs historic mining
✓ Reward sits just under the historic Hawkins Hill mine - 435kozs at 309 g/t Au
✓ Production has commenced on stockpiles.
✓ Underground development underway
✓ Up to 95% recovery by gravity processes only
✓ Big gold system – 25km + strike
Mineral Resource Estimate (MRE) for the Reward gold deposit at Hill End now stands at 419,000t
at 16.72g/t Au for 225,200oz Au1
:
Classification Cut-off Tonnes Au (g/t) Ounces
Indicated 4 141,000 15.54 70,500
Inferred 4 278,000 17.28 154,700
Total 4 419,000 16.72 225,200
Global Mineral Resource estimate for the Hill End & Hargraves Gold Project
Hill End Project Mineral Resource Estimate
Deposit Classification Tonnes Grade Contained
(kt) Au (g/t) Au (koz)
Reward Gold Mine
Indicated 141 15.5 71
Inferred 278 17.3 155
Sub Total 419 16.7 225
Hargraves Project
Indicated 1,109 2.7 97
Inferred 1,210 2.1 80
Sub Total 2,319 2.4 178
Red Hill Project
Indicated 413 1.4 19
Inferred 1,063 1.8 61
Sub Total 1,476 1.7 80
Project Total
Indicated 1,663 8.9 187
Inferred 2,551 8.6 296
Grand Total 4,214 8.7 482
1
(VTX:ASX Announcement 21 June 2023).
7
COMPETENT PERSON’S STATEMENT
The information in this report that relates to Exploration Results and Exploration Targets is based
on information compiled by Mr. Roger Jackson, a Director and Shareholder of the Company, who
is a 25+ year Fellow of the Australasian Institute of Mining and Metallurgy (FAusIMM), Fellow of
the Australian Institute of Geoscientists (FAIG) and a Member of Australian Institute of Company
Directors. Mr Jackson is the Executive Chairman and a full-time employee of Vertex Minerals
Limited (“Company”), and a shareholder of the Company. Mr. Jackson has sufficient experience
which is relevant to the style of mineralisation and type of deposits under consideration and to
the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition
of the “Australasian Code for Reporting of Exploration results, Mineral Resources and Ore
Reserves”. Mr. Jackson consents to the inclusion of the data contained inrelevantresourcereports
used for this announcement as well as the matters, form and context in which the relevant data
appear.
FORWARD LOOKING STATEMENTS AND IMPORTANT NOTICE
This report contains forecasts, projections and forward-looking information. Although the
Company believes that its expectations, estimates and forecast outcomes are based on reasonable
assumptions it can give no assurance that these will be achieved. Expectations and estimates and
projections and information provided by the Company are not a guarantee of future performance
and involve unknown risks and uncertainties, many of which are out of Vertex Minerals’ control.
Actual results and developments will almost certainly differ materially from those expressed or
implied. Vertex Minerals has not audited or investigated the accuracy or completeness of the
information, statements and opinions contained in this announcement. To the maximum extent
permitted by applicable laws, Vertex Minerals makes no representation and can give no assurance,
guarantee or warranty, express or implied, as to, and takes no responsibility and assumes no
liability for the authenticity, validity, accuracy, suitability or completeness of, or any errors in or
omission from, any information, statement or opinion contained in this report and without
prejudice, to the generality of the foregoing, the achievement or accuracy of any forecasts,
projections or other forward looking information contained or referred to in this report. Investors
should make and rely upon their own enquiries before deciding to acquire or deal in the
Company’s securities.
JORC COMPLIANCE STATEMENTS
Where statements in this announcement refer to exploration results which previously been
reported, the Company confirms that it is not aware of any new information or data that materially
affects the information included in the original announcements, and in the case of estimates of
Mineral Resources, that all material assumptions and technical parameters underpinning the
estimates in the relevant market announcements continue to apply and have not materially
changed. The Company confirms that the form and context in which the Competent Persons’
findings are presented have not materially modified from the original market announcements.
Share your feedback
Discover