Hill End Gold Mine Progress
Released
Released
Announcement PDF
HILL END GOLD MINE PROGRESS
ASX Code: VTX
Advanced Hill End Gold Project (NSW)
34km strike length high grade gold system –
to be developed on a large scale - 1.6m ozs
historically mined.
Advanced Hargraves Gold Project (NSW)
moving to a PFS.
Combined existing 2012 JORC 484K oz @
3.28 g/t. Significant exploration upside
Highly prospective Pride of Elvire Gold Project
(WA) & Taylors Rock Nickel Gold Project
(WA).
Hill End is home to the largest gold reef
nugget ever found – world record.
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
ASX ANNOUCEMENT 11TH MAY 2023
HIGHLIGHTS:
•
Hill End gravity gold processing plant refurbishment near
completion.
•
Permitted Mining licence and DA in place for Plant, Stockpiles and
Reward underground.
•
Permitted tailings dam has capacity to allow immediate
commencement of operations.
•
Near plant stockpiles ready for processing next month.
•
Key skilled local personnel appointed.
•
Process Plant Stockpile averages 1.26g/t Au across 24 samples
with a max gold value of 5.50g/t Au.
•
Tails Dam Road Stockpile averages 2.10g/t Au across 15 samples
with a max gold value of 12.20g/t Au.
•
Reward underground conceptual mine plan developed.
Mine is well placed for a simple start up:
•
•
•
•
•
Processing plant located adjacent to stockpiles and the
underground mine access point (adit).
Adit extends into the resource, so little development
required.
Second egress in place with ladder way and motorised Alimak
conveyance.
Underground fleet and utility services in place.
Hill End Gold Production strategy formalized.
1. Stockpiles
2. Reward Underground + Drilling to increase inventory
3. Red Hill Open Pit
•
Vertex Minerals Limited (ASX:VTX)
Directors with considerable gold mine start-up track records.
Vertex Minerals Limited (ASX: VTX) (“Vertex” or the “Company”) is pleased to advise that
refurbishment of the Hill End Processing Plant is near completion and the Company expects to start
commissioning activities next month.
The restart of processing activities is underpinned by the encouraging results from sampling and trial
mining of surface stockpiles, which has shown an average stockpile grade of 1.26g/t Au and a ~95% gold
recovery. Once commissioning activities have been completed the Company plans to recover gold from
the stockpiles adjacent to the processing plant and re-process historic tailings materials and battery
sands.
While these activities occur, a comprehensive plan to restart underground mining operations and
expand the capacity of the processing plant will be completed. The Company aims to progressively
transition from processing stockpiled materials to processing underground ores. Further details of this
strategy will be provided on completion of an underground scoping study.
Cautionary Statement
It must be noted that only the surface of the stockpile was sampled (24 samples) and that the sample
grades may not be representative of the entire stockpile, which is up to 25m thick. However, sampled
grades are considered consistent with reported tailing grades from historical operations at Hill End.
Executive Chairman Roger Jackson commented:
“It is a great result for Vertex to refurbish the Hill End Gravity Gold plant with a minimal capital spend.
The Company has mapped out a strategy to commence operations at a time when the aussie gold price
is at record levels. We are aiming to mine and process the surface stockpiles before re-commencing
mining at the Reward underground mine.
“Critical development infrastructure for Reward underground mine is already in place. This includes the
640 Adit which connects the processing plant to the mineral resource, and the second means of egress
via the reward shaft.
“As part of underground development works, we are planning to undertake drilling from underground
chambers to target the high grade extensional plunges below the Hawkins Hill historic mines, which
reportedly produced 435kozs of gold at 309 g/t.
Vertex Minerals Limited (ASX:VTX)
Figure 1 – Location of Processing Plant and Reward Mineral Resource. Long section looking west.
Vertex Minerals Limited (ASX:VTX)
Page 3 of 19
Figure 2 - Hill End Gravity Gold Plant
Vertex Minerals Limited (ASX:VTX)
Figure 3 - Gold Pour in the gold room at Hill End during the trial
mining by Hill End Gold Ltd
Page 4 of 19
Figure 4 - Reward shaft and internal personnel conveyance and ladderway
Figure 5 - Hill End (Vertex ) Underground Truck
Vertex Minerals Limited (ASX:VTX)
Figure 6 - Hill End (Vertex) Underground Loader
Page 5 of 19
Figure 7 - Underground access connects the resource 400m horizontally to the north with the processing plant
This announcement has been approved by the Board of Vertex Minerals Limited.
Further Information:
Roger Jackson
Executive Chairman
roger@vertexminerals.com.au
Vertex Minerals Limited (ASX:VTX)
Tully Richards
Technical Director
tully@vertexminerals.com.au
Page 6 of 19
About Vertex Minerals Limited
Vertex Minerals Limited (ASX: VTX) is an Australian based gold exploration company developing its advanced Hargraves and
Hill End gold projects located in the highly prospective Eastern Lachlan Fold Belt of Central West NSW. Other Company assets
include the Pride of Elvire gold project and Taylors Rock gold/nickel/lithium project both located in the Eastern Goldfields of
WA. The focus of Vertex Minerals is to advance the commercial production of gold from its NSW projects embracing an
ethical and environmentally sustainable approach:
•
•
•
•
•
Gravity Separation: The deportment of gold at the Hill End Project allows high recovery to a concentrate
produced using gravity separation techniques.
Direct Smelting: The use of direct smelting of a gold concentrate that eliminates the need to use cyanide as a
solvent.
Contrast in Density: These separation techniques take advantage of the contrast in density of gold (ρ=19.3) relative
to quartz (ρ=2.65).
Renewable Energy Potential: The unique landscape and infrastructure makes Hill End ideal for the establishment
of renewable sources of power. The Crudine Ridge Windfarm is only 30km from the project site and Vertex plans
to examine a pumped hydro-electricity scheme as an integral part of any proposed development. The topography
and existing mine workings including shafts and adits make the establishment of a pumped hydro scheme
achievable at modest expense.
Benign Tailings: The tailings will essentially be quartz with little to no sulphide minerals.
Hargraves Gold Project (NSW)
• Hargraves Gold project is located approximately 2 5 km south of the town of Mudgee.
• The goldfield is 4 x 10 km with numerous mineralised structures with little modern exploration.
• An updated mineral resource in accordance with JORC 2012 Code was completed by SRK Consulting (Australasia)
Pty Ltd (SRK) – total of 2.3Mt at 2.38g/t Au for 177koz Au.
Hill End Gold Project (NSW)
• Consists of 10 mining leases and three Exploration Licences located in the core of the Hill End Trough on the eastern
Lachlan Fold Belt.
• 14km of continuous gold lode with gold recovery rate to gravity at +90%.
• Work undertaken in 2015 by Hill End Gold Limited (HEG) culminated in a JORC 2012 resource estimate of 80,000 oz
Au @ 1.7 g/t to 150m depth.
Vertex Minerals Limited (ASX:VTX)
Page 7 of 19
Hill End Project Mineral Resource Estimate
Classification
Tonnes
Grade
(kt)
Au (g/t)
Reward Gold Mine
Indicated
55
12.4
Inferred
782
8.1
Sub Total
837
8.5
Hargraves Project
Indicated
1,109
2.7
Inferred
1,210
2.1
Sub Total
2,319
2.4
Red Hill Project
Indicated
413
1.4
Inferred
1,063
1.8
Sub Total
1,476
1.7
Project Total
Indicated
1,577
2.7
Inferred
3,055
3.5
Grand Total
4,632
3.3
Deposit
Contained
Au (koz)
22
205
227
97
80
178
19
61
80
138
347
485
Pride of Elvire Gold Project (WA)
• Tenements surround the Mt. Elvire homestead approximately 210km north of Southern Cross in Western Australia
• The project has seen historical drilling with encouraging gold results achieved.
Taylors Rock Project (WA)
• Located 80km WSW of Norseman in the Southern Goldfields region of Western Australia.
• The project has both Gold and Nickel potential, interesting historical intercepts have recorded encouraging
mineralisation.
Competent Persons Statement
The information in this report that relates to Exploration Results and Exploration Targets is based on information compiled
by Mr. Roger Jackson, a Director and Shareholder of the Company, who is a 25+ year Fellow of the Australasian Institute of
Mining and Metallurgy (FAusIMM), Fellow of the Australian Institute of Geoscientists (FAIG) and a Member of Australian
Institute of Company Directors. Mr. Jackson has sufficient experience which is relevant to the style of mineralisation and
type of deposits under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined
in the 2012 Edition of the “Australasian Code for Reporting of Exploration results, Mineral Resources and Ore Reserves”. Mr.
Jackson consents to the inclusion of the data contained in relevant resource reports used for this announcement as well as
the matters, form and context in which the relevant data appears.
Vertex Minerals Limited (ASX:VTX)
Page 8 of 19
Forward Looking Statements and Important Notice
This report contains forecasts, projections and forward-looking information. Although the Company believes that its
expectations, estimates and forecast outcomes are based on reasonable assumptions it can give no assurance that these will
be achieved. Expectations and estimates and projections and information provided by the Company are not a guarantee of
future performance and involve unknown risks and uncertainties, many of which are out of Vertex Minerals’ control.
Actual results and developments will almost certainly differ materially from those expressed or implied. Vertex Minerals has
not audited or investigated the accuracy or completeness of the information, statements and opinions contained in this
announcement. To the maximum extent permitted by applicable laws, Vertex Minerals makes no representation and can
give no assurance, guarantee or warranty, express or implied, as to, and takes no responsibility and assumes no liability for
the authenticity, validity, accuracy, suitability or completeness of, or any errors in or omission from, any information,
statement or opinion contained in this report and without prejudice, to the generality of the foregoing, the achievement or
accuracy of any forecasts, projections or other forward looking information contained or referred to in this report.
Investors should make and rely upon their own enquiries before deciding to acquire or deal in the Company’s securities.
Vertex Minerals Ltd ABN 68 650 116 153
Unit 38, 460 Stirling Highway
Peppermint Grove
WA 6011
PO Box 8770
Orange
NSW 2800
Phone +61 (0) 8 6383 7828
Email: info@vertexminerals.com.au
APPENDIX A
Table 1 Trench samples, weights and Au grades.
Location
Process Plant SP
Process Plant SP
Process Plant SP
Process Plant SP
Process Plant SP
Process Plant SP
Process Plant SP
Process Plant SP
Process Plant SP
Process Plant SP
Process Plant SP
Process Plant SP
Trench
Trench A
Trench A
Trench A
Trench A
Trench B
Trench B
Trench B
Trench B
Trench C
Trench C
Trench C
Trench C
Interval (m)
0-1
1-2
2-3
3-4
0-1
1-2
2-3
3-4
0-1
1-2
2-3
3-4
Vertex Minerals Limited (ASX:VTX)
Weight (kg)
5.34
5.16
5.32
6.02
5.58
5.28
5.32
5.48
4.72
4.94
5.54
5.82
Au-AA26 (ppm)
5.50
0.30
0.10
0.90
1.69
0.70
3.30
1.90
0.30
1.53
1.90
0.20
1.30
0.80
1.04
W. Ave Int.
4m @ 1.69g/t gold
4m @ 1.53g/t gold
4m @ 1.04g/t gold
Page 9 of 19
Location
Process Plant SP
Process Plant SP
Process Plant SP
Process Plant SP
Process Plant SP
Process Plant SP
Process Plant SP
Process Plant SP
Trench
Trench D
Trench D
Trench D
Trench D
Trench E
Trench E
Trench E
Trench E
Interval (m)
0-1
1-2
2-3
3-4
0-1
1-2
2-3
3-4
Weight (kg)
5.46
5.26
5.36
6.04
4.82
5.06
5.16
4.92
Process Plant SP
Process Plant SP
Process Plant SP
Process Plant SP
Trench F
Trench F
Trench F
Trench F
0-1
1-2
2-3
3-4
5.52
5.18
5.18
5.10
Process Plant SP
Process Plant SP
Process Plant SP
Process Plant SP
Trench G
Trench G
Trench G
Trench G
0-1
1-2
2-3
3-4
5.18
4.86
5.40
5.38
Process Plant SP
Process Plant SP
Process Plant SP
Process Plant SP
Trench H
Trench H
Trench H
Trench H
0-1
1-2
2-3
3-4
4.98
4.96
4.84
5.00
Process Plant SP
Process Plant SP
Process Plant SP
Process Plant SP
Trench I
Trench I
Trench I
Trench I
0-1
1-2
2-3
3-4
5.32
5.22
5.56
4.86
TAILS DAM RD
TAILS DAM RD
TAILS DAM RD
TAILS DAM RD
Trench J
Trench J
Trench J
Trench J
0-1
1-2
2-3
3-4
5.36
5.56
5.34
5.02
TAILS DAM RD
TAILS DAM RD
TAILS DAM RD
Trench K
Trench K
Trench K
0-1
1-2
2-3
4.58
5.08
4.76
TAILS DAM RD
TAILS DAM RD
TAILS DAM RD
TAILS DAM RD
Trench L
Trench L
Trench L
Trench L
0-1
1-2
2-3
3-4
5.10
5.22
5.08
5.80
TAILS DAM RD
Trench M
0-1
5.30
Vertex Minerals Limited (ASX:VTX)
Au-AA26 (ppm)
3.10
3.40
0.10
0.70
1.79
0.30
0.00
0.00
0.01
0.07
0.00
0.00
0.00
0.10
0.02
0.10
2.30
0.90
0.00
0.80
0.10
0.00
0.00
0.20
0.08
1.50
0.00
0.10
0.90
0.62
0.00
1.00
0.00
0.00
0.26
1.50
7.50
2.70
4.01
0.00
0.02
0.01
0.00
0.01
0.01
W. Ave Int.
4m @ 1.79g/t gold
4m @ 0.07g/t gold
4m @ 0.02g/t gold
4m @ 0.80g/t gold
4m @ 0.08g/t gold
4m @ 0.62g/t gold
4m @ 0.26g/t gold
3m @ 4.01g/t gold
4m @ 0.01g/t gold
Page 10 of 19
Location
TAILS DAM RD
TAILS DAM RD
TAILS DAM RD
Trench
Interval (m)
Trench M
1-2
Trench M
2-3
Trench M
3-4
TAILS DAM RD
TAILS DAM RD
TAILS DAM RD
TAILS DAM RD
Trench N
Trench N
Trench N
Trench N
TAILS DAM RD
TAILS DAM RD
TAILS DAM RD
TAILS DAM RD
TAILS DAM RD
TAILS DAM RD
TAILS DAM RD
TAILS DAM RD
Consolidated Pad
Consolidated Pad
Consolidated Pad
Consolidated Pad
Trench O
Trench O
Trench O
Trench P
Trench P
Trench P
Trench P
Trench Q
Trench A
Trench A
Trench A
Trench A
0-1
1-2
2-3
3-4
0-1
1-2
2-3
0-1
1-2
2-3
3-4
0-1
0-1
1-2
2-3
3-4
Weight (kg)
5.94
5.46
6.26
5.04
5.00
5.00
5.06
5.50
6.44
5.48
4.94
5.26
4.96
5.22
5.00
4.90
5.02
4.94
4.96
Consolidated Pad
Consolidated Pad
Consolidated Pad
Consolidated Pad
Trench B
Trench B
Trench B
Trench B
0-1
1-2
2-3
3-4
4.82
5.46
5.04
4.88
Consolidated Pad
Consolidated Pad
Consolidated Pad
Consolidated Pad
Trench C
Trench C
Trench C
Trench C
0-1
1-2
2-3
3-4
5.08
5.20
5.00
4.96
Consolidated Pad
Consolidated Pad
Consolidated Pad
Consolidated Pad
Consolidated Pad
Consolidated Pad
Consolidated Pad
Consolidated Pad
Trench D
Trench D
Trench D
Trench D
Trench E
Trench E
Trench E
Trench E
0-1
1-2
2-3
3-4
0-1
1-2
2-3
3-4
Vertex Minerals Limited (ASX:VTX)
5.12
5.04
4.94
5.16
5.36
4.80
4.98
4.92
Au-AA26 (ppm)
0.00
0.01
0.02
0.01
0.01
0.03
1.72
0.93
0.67
0.01
0.02
12.20
3.85
0.06
0.07
0.10
3.35
0.91
1.29
1.29
0.00
0.00
0.04
0.02
0.01
0.03
0.02
0.05
6.74
1.65
0.01
0.83
0.17
0.54
0.39
0.68
0.46
0.06
0.17
0.34
0.06
1.38
0.15
0.18
0.43
W. Ave Int.
4m @ 0.01g/t gold
4m @ 0.67g/t gold
3m @ 3.85g/t gold
4m @ 0.91g/t gold
Grab sample
4m @ 0.01g/t gold
4m @ 1.65g/t gold
4m @ 0.39g/t gold
4m @ 0.34g/t gold
4m @ 0.43g/t gold
Page 11 of 19
Location
Consolidated Pad
Consolidated Pad
Consolidated Pad
Consolidated Pad
Trench
Trench F
Trench F
Trench F
Trench F
Interval (m)
0-1
1-2
2-3
3-4
Weight (kg)
4.86
4.82
4.88
4.94
Consolidated Pad
Consolidated Pad
Consolidated Pad
Consolidated Pad
Trench G
Trench G
Trench G
Trench G
0-1
1-2
2-3
3-4
5.26
5.00
4.94
4.90
Au-AA26 (ppm) W. Ave Int.
0.12
5.42
0.10
0.63
1.55 4m @ 1.55g/t gold
0.03
0.29
0.01
0.00
0.08 4m @ 0.08g/t gold
The raw data re the above is summarised below;
•
9 trenches, for 36 samples, were dug across the Process Plant Stockpile averaging 0.86g/t Au incl. a high
of 5.50g/t Au
•
7 trenches & 1 grab, for 27 samples, were dug across the Tails Dam Road Stockpile averaging 1.21g/t Au
incl. a high of 12.20g/t Au
•
A further 7 trenches, for 28 samples, were dug across the Consolidated Pad averaging 0.65g/t Au incl. a
high of 6.74g/t Au
Vertex Minerals Limited (ASX:VTX)
Page 12 of 19
Figure 8 – showing trench locations A-I for PPS & J-Q for TDRS (samples M1-M5 & previously reported, are
also shown).
Vertex Minerals Limited (ASX:VTX)
Page 13 of 19
Figure 2 illustrates trench locations at the Consolidated Pad/laydown area. Less is known about the
construction of the Consolidated Pad. Vertex will look to process parcels of said pad through its gravity
circuit to determine if reclaiming this pad will be worthwhile.
Vertex Minerals Limited (ASX:VTX)
Page 14 of 19
Appendix 1 – Hill End Stockpile– JORC Code 2012 Table 1 Criteria
The table below summarises the assessment and reporting criteria used for the Hill End Gold Gravity Stockpile and
reflects the guidelines in Table 1 of The Australasian Code for the Reporting of Exploration Results, Mineral Resources
and Ore Reserves (the JORC Code, 2012).
Section 1 Sampling Techniques and Data
Criteria
Sampling techniques
JORC Code explanation
Commentary
Nature and quality of sampling (eg cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments, etc).
These examples should not be taken as limiting
the broad meaning of sampling.
Rock chip samples were taken from 5 areas on the stockpile. Each
set of samples was taken from random areas within an area of
circa 3m by 3m. Each sample filled a 20l bucket.
Trenches were taken with an Excavator Bucket. 750mm wide.
Trenches were circa 3m long and up to 3m deep.
Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or systems
used.
No standards or duplicates were used for rock chip
sampling.
Aspects of the determination of mineralisation
that are Material to the Public Report.
Drilling
techniques
Drill sample
recovery
Logging
In cases where ‘industry standard’ work has been
done this would be relatively simple (eg ‘reverse
circulation drilling was used to obtain 1 m samples
from which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases more
explanation may be required, such as where there
is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation
types (eg
submarine nodules) may warrant disclosure of
detailed information.
Drill type (eg core, reverse circulation, open- hole
hammer, rotary air blast, auger, Bangka, sonic, etc)
and details (eg core diameter, triple or standard
tube, depth of diamond tails, face- sampling bit or
other type, whether core is oriented and if so, by
what method, etc).
The samples were bulked up to about 25kg each to account for
the nugget affect.
Trench samples were taken with the bucket across the base of the
trench and composited.
No drilling is being reported.
Method of recording and assessing core and chip
sample recoveries and results assessed.
No drilling is being reported.
Measures taken to maximise sample recovery and
ensure representative nature of the samples.
No drilling is being reported.
Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
No drilling is being reported.
Whether core and chip samples have been
geologically and geotechnically logged to a level
of detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical
studies.
Samples are surface rock chip and geological interpretation is
based on field observation
Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc)
photography.
The total length and percentage of the relevant
intersections logged.
Sub-sampling
techniques and
If core, whether cut or sawn and whether quarter,
half or all core taken.
Vertex Minerals Limited (ASX:VTX)
No sub-sampling has been undertaken.
Page 15 of 19
Criteria
sample preparation
JORC Code explanation
Commentary
If non-core, whether riffled, tube sampled, rotary
split, etc and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Quality control procedures adopted for all subsampling stages to maximise representivity of
samples.
Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain
size of the material being sampled.
Quality of assay data
and laboratory tests
The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
Each sample was submitted to the laboratory, and sorted into the
size fractions shown below in the table. Each sized fraction was
weighed, dried, and then pulverised. The samples were weighed
and wet screened. Sized and pulverised fractions were received at
OR lab and assayed via Au-AA26 – Fire-assay fusion with AAS finish.
A nominal 50g sample was weighed for each size fraction, fused with
a mixture of lead oxide, sodium carbonate, borax, silica and other
reagents as required, inquarted with 6 mg of gold-free silver and
then cupelled to yield a precious metal bead.
The bead was digested in 0.5 mL dilute nitric acid in the microwave
oven. 0.5 mL concentrated hydrochloric acid was then added and
the bead further digested in the microwave at a lower power
setting. The digested solution was cooled, diluted to a total volume
of 10 mL with de-mineralized water, and analyzed by atomic
absorption spectroscopy against matrix-matched standards.
Samples were assayed with a blank, two internal CRMs and a
duplicate in the same fusion run. Each sample was assayed in single
with M5>45<106mm selected randomly for a run duplicate.
ppm
Upper
Lower
Limit
Au
Limit
Sample
Units
Gold
Weight (g)
Symbol
AuAA26
Element
Method Code
The result reported is the grade of the analysed fraction and is not
weight corrected for the sizing weight
50
0.01
100
The +75 micron fraction was dried in aluminium trays, weighed
and fire assayed to extinction. The -75 micron fraction was
collected using flocculant, the liquor then decanted and the fines
sample dried in an oven. This was homogenised in the LM2,
weighed and fire assayed in duplicate using a 50 g charge. The
assays for the -75 micron fraction were averaged and a weighted
average is calculated with the +75 micron fraction.
Vertex Minerals Limited (ASX:VTX)
Page 16 of 19
Verification
of
sampling
and
assaying
Location of data points
Data spacing and
distribution
For geophysical tools, spectrometers, handheld
XRF instruments, etc, the parameters used in
determining the analysis including instrument
make and model, reading times, calibrations
factors applied and their derivation, etc.
Not used for reporting
Nature of quality control procedures adopted (eg
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy
(ie lack of bias) and precision have been
established
Not applicable
The verification of significant intersections by
either independent or alternative company
personnel.
Rock chip sampling reported with no independent
verification
The use of twinned holes.
Rock chip sampling only with no drill repeats
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Field reconnaissance data is manually collected in field
including photograph and location.
Discuss any adjustment to assay data.
None required
Accuracy and quality of surveys used to locate drill
holes (collar and down-hole surveys), trenches,
mine workings and other locations used in Mineral
Resource estimation.
All samples collected are located using a hand held GPS.
Specification of the grid system used
The grid system used is GDA94 Zone 50
Quality and adequacy of topographic control.
Nominal RLs based on regional topographic datasets are used
initially; however, these will be updated if DGPS coordinates are
collected.
Data spacing for reporting of Exploration Results.
Rock chip samples were randomly collected and were
appropriate given the objectives of the program.
Trench samples were randomly collected and collated.
MRE not being prepared.
Whether the data spacing and distribution is
sufficient to establish the degree of geological and
grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s)
and classifications applied.
Orientation of data
in relation to
geological
structure
Data is recorded in geological database
Whether sample compositing has been applied.
None undertaken.
Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the
deposit type.
Rock chip sampling was undertaken at the surface only. This does
not represent the full stockpile volume.
If the relationship between the drilling orientation
and the orientation of key mineralised structures is
considered to have introduced a sampling bias, this
should be assessed and reported if material.
Vertex Minerals Limited (ASX:VTX)
Page 17 of 19
Sample security
The measures taken to ensure sample security.
Senior company personnel supervise all sampling and
transport to assay laboratory in Perth.
Audits or
reviews
The results of any audits or reviews of sampling
techniques and data.
No Audits or reviews were undertaken
Section 2 Reporting of Exploration Results
Criteria
JORC Code explanation
Mineral tenement
and land tenure status
•
Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint
ventures, partnerships, overriding royalties,
native title interests, historical sites,
wilderness or national park and
environmental settings.
Commentary
•
The project is located within granted
Exploration Licence EL5868 Mining leases
ML1541, ML1116, ML315, ML316, ML317,
ML49, ML50, ML913, ML914, ML915 and
GL5846 with the earliest expiry date of 19
January 2033. The leases are held by Vertex
Minerals Pty Ltd.
•
The site is covered by EPL 12008, scheduled activity is
mining for minerals.
As more fully disclosed in the Company’s 2022 IPO
Prospectus (see sections 5.1 and 7.2 of the Prospectus, and
pages 83 and 84 of the Independent Geologist Report that is
annexed to the Prospectus) First Tiffany Resources
Corporation (FTRC) has a right to obtain a 15% contributing
interest, which will only be triggered by the Company
providing an 'economic feasibility study'. Failure to contribute
will result in forfeiture of this right. The result is that the
Company has a 100% beneficial interest in all its tenements at
Hill End, subject to reduction to 85% in respect of certain
tenements, if FTRC contributes at the 15% level.
All tenements are in good standing.
Exploration done by
other parties
The security of the tenure held at the time of reporting
along with any known impediments to obtaining a licence
to operate in the area.
Acknowledgment and appraisal of exploration by other
parties.
Geology
Deposit type, geological setting and style of mineralisation.
•
Drillhole Information
A summary of all information material to the
understanding of the exploration results including a
tabulation of the following information for all Material
drillholes:
• easting and northing of the drillhole collar
No drilling undertaken
Vertex Minerals Limited (ASX:VTX)
In relation to this stockpile no previous exploration or
sampling has been undertaken.
Mineralisation at the Reward deposit from which
the stockpile is derived, occurs within a series of
bedding parallel quartz veins occurring along the
limbs of the Hill End Anticline which is located in the
mid-Silurian to mid-Devonian Hill End Trough
containing sedimentary and volcanic rocks. The
deposit is best described as a brittle, thrustdominated, competency-controlled orogenic gold
low sulphide system developed post ductile
deformation.
Page 18 of 19
Criteria
JORC Code explanation
Commentary
•
Data aggregation
methods
Relationship between
mineralisation
widths and intercept
lengths
Diagrams
Balanced
reporting
Other substantive
exploration data
elevation or RL (elevation above sea level in
metres) of the drillhole collar
• dip and azimuth of the hole
• down hole length and interception depth
• hole length.
In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade
truncations (e.g. cutting of high grades) and cut-off
grades are usually Material and should be
stated.
If the geometry of the mineralisation with respect to the
drillhole angle is known, its nature should be reported.
If it is not known and only the down hole lengths are
reported, there should be a clear statement to this effect
(e.g. ‘down hole length, true width not
known’).
Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for any
significant discovery being reported These should include,
but not be limited to a plan view of drill hole
collar locations and appropriate sectional views.
Where comprehensive reporting of all Exploration
Results is not practicable, representative reporting of
both low and high grades and/or widths should be
practiced to avoid misleading reporting of
Exploration Results.
Other exploration data, if meaningful and material,
should be reported including (but not limited to):
geological observations; geophysical survey results;
geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock
characteristics; potential deleterious or
contaminating substances.
None completed.
No drilling completed by Lachlan Star
Appropriate
figures
announcement
The nature and scale of planned further work (e.g. t