Presentation to Gold Coast Gold Conference
Released
Released
Announcement PDF
Noosa Mining November 2024 Mining Conference
VERTEX MINERALS LIMITED
REWARD GOLD MINE
The High-grade gold producer
and developer
Roger Jackson
Executive Chairman
GOLD COAST GOLD CONFERENCE APRIL 15th, 2025, | ASX: VTX
1
Disclaimer
The information contained in this presentation has been provided by Vertex Minerals Ltd (Company) and other sources identified herein. The information contained in
this presentation is for informational purposes only and is not a recommendation as to whether to invest in the Company’s shares. The information contained in this
presentation is not investment or financial product advice and is not intended to be used as the basis for making an investment decision. The presentation has been
prepared without taking into account the investment objectives, financial situation or particular needs of any particular person. Unless otherwise specified, data and
tables set out in this presentation are based on the Company’s management estimates. No representation or warranty, express or implied, is made as to the fairness,
accuracy, completeness or correctness of the information, opinions and conclusions contained in this presentation. To the maximum extent permitted by law, none of
the Company or, its directors, or any of their employees or agents, nor any other person accepts any liability, including, without limitation, any liability arising out of
fault of negligence, for any loss arising from the use of the information contained in this presentation. In particular, no representation or warranty, express or implied is
given as to the accuracy, completeness or correctness, likelihood of achievement or reasonableness or any forecasts, projections, prospects or returns contained in this
presentation nor is any obligation assumed to update such information. Such forecasts, prospects or returns are by their nature subject to significant uncertainties and
contingencies. Past performance is no guarantee of future performance. This presentation includes “forward-looking statements” within the meaning of securities laws
of applicable jurisdictions. Forward-looking statements can generally be identified by the use of forward-looking words such as “may”, “will”, “expect”, “intend”,
“plan”, “estimate”, “anticipate”, “believe”, “continue”, “objectives”, “outlook”, “guidance” or other similar words, and include statements regarding certain plans,
strategies and objectives of management and expected financial performance. These forward-looking statements involve known and unknown risks, uncertainties and
other factors, many of which are outside the control of Vertex Minerals Ltd, and any of their officers, employees, agents or associates. Actual results, performance or
achievements may vary materially from any projections and forward-looking statements and the assumptions on which those statements are based.
Readers are cautioned not to place undue reliance on forward-looking statements and the Company assumes no obligation to update such information.
Mineral Resource Statement
The Exploration Target is classified in accordance with the Australasian Code for Reporting of Identified Mineral Resources and Ore Reserves (JORC, 2012). The
Exploration Target Estimate was completed by Andrew Hawker of HGS Australia. Mr Hawker has sufficient experience that is relevant to the style of mineralisation and
type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Hawker consents to the inclusion in the report of the matters based on his information in
the form and context in which it appears.
2
CORPORATE STRUCTUREe
Snapshot
VTX
Share Price
ASX Code
191m
Shares on Issue
~$0.22
Share Price
106M
Options on Issue
ca. $42M
Market Capitalisation undiluted
$1M
Cash as of 31 December 2024
3
DIRECTORS AND MANAGEMENTe Snapshot
Roger Jackson - Executive Chairman
30+ years as a mine operator, services
contractor and explorer. He is a geologist with
strong knowledge of gold exploration and
mining
Tully Richards - Executive Director
Experienced gold geologist based in Orange,
NSW.
Declan Franzmann - Non-Executive Director
.Mining
engineer with over 30 years of
experience
from
discovery,
through
construction, operations and mine closure.
Sean Richardson - Non-Executive Director
.
Management
General Manager Operations – Chris Hamilton
Manager Commercial – Alan Mills
Manager Maintenance – Jeff Williams
Mining Engineer – Tom Cowan
Safety Training – Mick Irwin
Mr Richardson is an experienced minerals
industry executive with 30 years’ operational
consultancy and managerial experience.
Environment – Casey Robinson
Alex Neuling – Company Secretary
Mine Geology – Carl Clark and Julian Geldard
.
Mr Neuling has 25 years’ corporate and
financial experience, including more than 20
years across various ASX-listed companies in
the mineral exploration, mining, Oil & Gas and
other sectors.
Human Resources – Rick Liang
Drilling – Mick Premus
4
Flagship Project for Vertex - Reward High Grade Gold Mine,
Hill End
✔ Commenced Gold processing in new Gekko Gold plant
✔ 100% owned Mining operation
✔ No hedge
✔ High Grade Gold Resource and Reserve 225 ozs at 16.7g/t + more
✔ Inherited AUD $25m of Underground development at Reward
✔ 1.8m ozs historic mining
✔ Reward sits just under the Hawkins Hill Mine 435kozs at 309 g/t
✔ Production has commenced on Stockpiles
✔ Underground development well underway with production commencing in a circa
3 months
✔ Up to 95% recovery by gravity processes only
✔ Big Gold System – 25km + strike
5
UNIQUE HILL END REWARD GOLD MINE
HIGH GRADE GOLD – HAWKINS HILL 435kozs at 309 g/t
Reward Resource 225kozs at 16.7 g/t
GOLD RECOVERS UP TO 95% - BY GRAVITY ONLY
NO ASSOCIATED SULPHIDE METALS TO SPEAK OF
23 FINE GOLD
NO GOLD IN COUNTRY ROCK
TEXT BOOK ORE SORTS
RECOVERS GOLD AT 650 micron – No Ball Mill
PRODUCED THE WORLD RECORD GOLD SPECIMEN
6
7
VERTEX STRATEGY
CLEAR STRATEGY SET FOR HILL END
1. To re install a refurbished a Gekko Gravity Gold plant in late 2024
2. To commence gold production from existing stockpiles in early 2025
3. Commence mining development in the high-grade Reward Mine in early 2025
4. To commence at a reduced throughput, but with ore sorting and ramp up
5. To be Australia’s most prominent high grade gold miner
6. To drill and add high grade gold to the global Hill End gold inventory, from the large-
scale gold system/s within the Hill End Corridor.
7. Drill, Drill, Drill
8. Earn a robust Safety , Environmental, Social and Governance (ESG) reputation.
9. Build shareholder value
8
Gekko Plant is instated at Hill End with an ore sorter –small footprint
Plant flowsheet
The New plant is located at the old plant site
Utilising the existing
• Gold Room
• Water systems
• Power generation
• Offices
• Change Rooms
• Workshop
• Storeroom
• Crib Room
• Jaw Crusher
• Access Roads
• Security System
9
PLANT AND ORE SORTER UP AND RUNNING
10
TEXTBOOK ORE SORTING
Reward gold mine ore sorts perfectly, with 79% mass
reduction & 337.20% increase in grade in the 8mm to 50mm
range.
Refer to VTX ASX
announcement 11 of September
2024
To underground Mine Stope fill
11
REWARD ORE BEING SORTED
12
BENEFITS OF NEW GRAVITY PLANT WITH SORTER
•
•
•
•
•
•
•
•
•
•
•
•
•
New plant will be able to treat up 110ktpa
Fully Automated – Can be run off App on phone
No Cyanide No chemicals
Only requires 2 operators- thus much lower operating costs
Full monitoring, including density, flows, mass and sampling
Rigid gold security
Ergonomic design
State of the Art safety systems
Lower power usage
Sorter increases grade to gravity circuit 50% less water use
Less power
Only ½ to 1/3 of the tails (we call sand) material now produced
13
PROCESSING HAS COMMENCED WITH STOCKPILES
∙ Vertex is processing these stockpiles now while the
development is undertaken at the Reward
underground.
Stockpile results referred to in ASX Announcement 27 April 2023
Note the Tons and Grades are not a resource, they are estimates only
* 2 g/t was the average feed grade calculated from the trial processing of the stockpiles
14
REWARD UNDERGROUND GOLD MINE
The Reward gold mine is well-placed for a simple start-up:
✔ The existing gravity processing plant is located adjacent to the
underground mine access point/Adit – new plant to be located
on this footprint
✔ Mine access point extends into the resource, so little
development is required. The existing 2.4m by 2.4m adit will only
require minor rehabilitation.
✔ Second egress in place with ladder way.
✔ Some underground fleet and utility services already in place.
15
REWARD UNDERGROUND GOLD MINE
The Reward gold mine is well-placed for a simple start-up:
✔ Gold Ore Ready to Mine
16
2009-2010 Underground Development
with declines developed to first production for Vertex Circa $25m spent on development
Legend
2008 and Prior Development
2009 Development
2009 Development Rises
2009 & 2010 Development
2009 & 2010 Development Rises
17
MINING SEQUENCE
18
HILL GOLD PRODUCTION FINANCIALS from PFS does not include stockpile processing
Note: based on Indicated Resource only – This is a JORC rule. (The model uses 50kozs of the 225kozs at 16.7 g/t)
First 6 months day shift only at a reduced input.
Project Life
2 years of minerals processing activities
Gold Production
49,890 ounces
Gross Revenue
$224 million
CAPEX
$17 million Pre Production
AISC
AUD $1,833 per ounce
Total Employment
70 Full Time Employees
Free Cashflow
$122 million pretax
NPV at 7%
$68 million pretax
IRR
520% pretax
Key Parameters
Life of mine pre-tax cash of $41 million at $4,500/oz gold price.
6-month payback
Average monthly gold production of 2,169 oz over 23 months with 92% gold recovery.
26,000 oz of gold produced per year on an anualised basis.
Mine design based on mechanised mining methods. Long hole open stoping with remotely operated loaders was selected as the primary stoping method.
Planned processing of 181kt of material at a mined with dilution grade of 9.3 g/t for 49,890 ounces of gold recovered. With sorting moving head grade to circa 30 g/t
$17m of capital required prior to production. Savings achieved in purchase of Morning Star Plant and through deferment of discretionary expenditures where possible.
Owner operator with a focus on grade not tonnes.
19
We purchased our own underground diamond rig
The diamond rig will be utilised to target
✔ the ultra high grade vein system that
runs down plunge of Reward
✔ to bring the Reward Resource into
Indicated- 225 kozs @16.7 grams
✔ The exploration target
• Vertex plan to run the mine and drilling rig as
an owner operator
20
Scratching the surface
Large Tenement Holding and Multiple Targets
•
34km of prospective strike that was the source of
the largest Gold specimen ever to be found globally
- discovered at Hill End
•
Most lodes only mined to the water table (60 feet)
•
6.6%
Lidar survey completed
with 3500+ surficial gold
workings identified over the line of lode
•
Only 800m of strike has6.2%
been drilled and only
down a few hundred meters
22
Environmental and Sustainable Mining Objectives
Environmentally Responsible and Sustainable Gold Miner
• Gravity Recoverable Gold
• Low Capex and Low Operating cost
• Minimal grind 200 to 650 micron
• Benign tails – potential commercial sand
• Benign waste
• Low water usage
• Re usable water
• No chemicals – no cyanide
• 23 fine gold
• Minimum tails (sand) compared to production
• No tails (sand) dam required – dry stack
21
VERTEX SUMMARY
• Australia's next high grade gold producer
• 100% ownership of Hill End gold production and exploration assets in HILL END NSW with historical gold
production more than 1.8 million oz gold from within our tenements
• Only 40 odd kms from Australia's largest gold mine - Cadia
• Robust base case model for 2025 Gold production commencement
• Blue chip exploration ground in the Lachlan Fold Belt
• Old timers mined the full 30km length of Hill End tenements for 3500+ workings – And they only
scratched the surface. This is a BIG system
• Talented and dedicated operations team
• Proven Board & Management
22
CONTACT US
ACN - 650 116 153
roger@vertexminerals.com.au
Bowen Street Hill End
+61 8 6383 7828
www.vertexminerals.com.au
admin@vertexminerals.com.au
ACN – 650 116 153
23
ROBUST AND PRIMED TO GROW GOLD INVENTORY
Where statements in this announcement refer to exploration results which previously been reported, the Company confirms that it is not aware of any new information or data
that materially affects the information included in the original announcements, and in the case of estimates of Mineral Resources, that all material assumptions and technical
parameters underpinning the estimates in the relevant market announcements continue to apply and have not materially changed. The Company confirms that the form and
context in which the Competent Persons’ findings are presented have not materially modified from the original market announcements.
Reward Gold Mine: 2.0g/t reporting cutoff grade
Hargraves: 0.8 g/t reporting cutoff grade (ASX Announcement 29 May 2020).
Red Hill: 0.5 g/t per block, ordinary kriging grade interpolation, classified mineral Resources Limited to 160mRL below surface. (ASX Announcement November 2015)
24
Share your feedback
Discover