Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
31 October 2024
ABN 68 650 116 153
QUARTERLY ACTIVITIES REPORT
FOR THE PERIOD ENDED 30 September 2024
HIGHLIGHTS FOR QUARTER
•
Vertex has identified major benefits for utilising pre-concentration technology at
its Reward high grade gold mine.
•
Ore sorting pre-concentration test work was initiated with leading ore sorting
provider TOMRA with outstanding results.
•
94kg of sample from the low-grade stockpile at Reward Gold Mine (Reward) was
sorted. The following results were reported1;
ü Head grade to Sorter weighted average grade (WAG) = 3.70 g/t gold,
ü Ore grade WAG after sorting = 16.22g/t gold (337.20% increase on grade),
ü Ore/waste split after sorting = 19.31kgs Ore vs 74.54kgs Waste (79% mass
reduction),
ü Gold lost to waste fraction = 0.03grams (>90% efficiency)
•
Refurbishment of the plant is well underway, and Vertex anticipates that the plant
will be re-installed at Hill End later this year. The Company anticipates production
will commence in January 2025
•
Vertex acquired a Boart Longyear LM90 underground drill rig to advance
exploration at the Reward gold mine below the existing resource
ORE SORTER TEST WORK AND IMPLEMENTATION INTO THE HILL END GRAVITY PLANT
•
Pre-concentration technology initiated at the Hill End Gravity Plant to separate highgrade ore from waste before it enters the processing plant.
•
By processing only high-grade ore, energy consumption can be reduced, water
consumption will be halved leading to lower operating costs and reduction of the
carbon footprint.
•
The small sorting unit will be simply incorporated in the existing plant being
refurbished by Gekko
•
Previous scoping test results from TOMRA suggested that the Greywacke country
rock can be efficiently and effectively separated from the high-grade quartz carrying
the gold leading to significant head grade uplift and reduced material to be
processed.
1
Refer to VTX ASX Announcement 26 July 2024
Vertex Minerals Ltd Quarterly Activities Report – September 2024
Test Results
• 94kg of sample from the low-grade stockpile at Reward Gold Mine (Reward) was sorted.
The following results are reported;
ü Head grade to Sorter weighted average grade (WAG) = 3.70 g/t gold,
ü Ore grade WAG after sorting = 16.22g/t gold (337.20% increase on grade),
ü Ore/waste split after sorting = 19.31kgs Ore vs 74.54kgs Waste (79% mass reduction),
ü Gold lost to waste fraction = 0.03grams (>90% efficiency)
Refer to VTX ASX Announcement 26th July 2024
ACQUISITION OF A LM90 UNDERGROUND DRILL RIG
•
Vertex has acquired a Boart Longyear LM90 underground drill rig to advance exploration
at the Reward gold mine below the existing resource
•
The Vertex team are planning diamond drill programs for the following:
ü Below the current JORC-2012 Reward Resource with the aim of expanding upon the
existing resource;
ü Fosters Exploration Target; and
ü South Star prospect area
•
Acquisition of the LM90 follows an extensive review of the mineralisation potential
below the Reward resource, which has only been drilled up to 50m below the
Amalgamated Adit. This area targeted is referred to as the ‘Reward mid depths’ as it is
located just 80m to ~200m below the Amalgamated Adit. Refer to Figure 1
•
Upon commissioning of the LM90 drill rig, Vertex have planned eight drill holes to target
the high-grade Fosters Exploration target
•
The LM90 has several advantages well-suited to Vertex’s requirements, including:
ü The ability to work on surface and underground;
ü Safe, Semi-automated, with a rod-handler system which allows for less manual
handling;
ü Allows greater flexibility in drilling over a number of resource and exploration areas;
and
ü LM 90 rigs are well-established in the industry as safe and reliable underground drill
rigs.
•
Vertex acquiring its own rig has many advantages
ü Per-metre drill costs will be significantly less than hiring an external drill contractor
ü More control and accuracy over precision of drilling.
ü Works well with Job sharing
ü Reduces pressure on Mining crew to have drill cuddy availability
ü The LM90 rig will be accounted for as an asset on the Vertex balance sheet
Page 2 of 14
Vertex Minerals Ltd Quarterly Activities Report – September 2024
THE REWARD GOLD MINE IS WELL PLACED FOR A SIMPLE START –UP:
•
The new processing plant is being constructed adjacent to the underground mine portal
(640 Level) and the Company plans to increase throughput up to 110 ktpa.
•
The 640 Level extends into the resource and stripping and refurbishment of this
development is required.
•
Second egress in place with existing ladder way from 640 Level to surface.
•
Some underground fleet and utility services are already owned by Vertex.
•
Mining Licence and DA in place for the processing plant, stockpile processing and the
underground mining, with a ramp up requiring further consent.
The New plant will be utilising the existing services and infrastructure:
ü Gold Room
ü Water systems
ü Power generation
ü Offices
ü Change Rooms
ü Workshop
ü Storeroom
ü Crib Room
ü Jaw Crusher
ü Access Roads
ü Security System
•
Page 3 of 14
Vertex Minerals Ltd Quarterly Activities Report – September 2024
Table 1: Global Mineral Resource estimate for the Hill End & Hargraves Gold Project
Deposit
Hill End Project Mineral Resource Estimate
Classification
Tonnes
Grade
(kt)
Au (g/t)
Contained
Au (koz)
Reward Gold Mine
Indicated
141
15.5
71
Inferred
278
17.3
155
419
16.7
225
Indicated
1,109
2.7
97
Inferred
1,210
2.1
80
2,319
2.4
178
Indicated
413
1.4
19
Inferred
1,063
1.8
61
1,476
1.7
80
Indicated
1,663
3.5
187
Inferred
2,551
3.6
296
4,214
3.6
483
Sub Total
Hargraves Project
Sub Total
Red Hill Project
Sub Total
Project Total
Grand Total
Page 4 of 14
Vertex Minerals Ltd Quarterly Activities Report – September 2024
STRATEGIC FOCUS
Clear Strategy set for Hill End:
1. To re install a refurbished circa 110ktpa Gekko Gravity Gold plant in 2024
2. To commence gold production from existing stockpiles in early 2025
3. To commence mining development in the high-grade Reward Mine in late
2024
4. To commence at a reduced throughput, but with ore sorting and ramp up
5. To be Australia’s most prominent high grade gold miner
6. To drill and add high grade gold to the global Hill End gold inventory, from the
large-scale gold system/s within the Hill End Corridor.
7. To take the existing resources and near surface mineralisation to production
utilising gravity gold recovery methods.
8. Earn a robust Safety, Environmental, Social and Governance (ESG) reputation.
9. Build shareholder value
Figure 1 Hill End Underground Mine Infrastructure
Page 5 of 14
Vertex Minerals Ltd Quarterly Activities Report – September 2024
Figure 2 Location Of Hill End in NSW
Figure 3 Mining Leases and Exploration held by Vertex over the Hill End Anticline
Page 6 of 14
Vertex Minerals Ltd Quarterly Activities Report – September 2024
ENVIRONMENTAL AND SUSTAINABLE MINING
•
•
•
•
•
•
•
•
•
•
•
Gravity Recoverable Gold
Low Capex and Low Operating cost
Minimal grind 200 to 500 micron
Potential renewable energy – Wind – pump storage
Benign tails – potential commercial sand
No Tails dam just dry stacked and rehabilitated
Benign waste
Low water usage
Re usable water
No chemicals – no cyanide
23 fine gold
EVENTS SUBSEQUENT TO QUARTER END
Subsequent to the end of the quarter, the Company announced a placement to raise
$1.10million before costs at an issue price of $0.16. To augment the placement, loans of $0.98
million were secured which, subject to shareholder approval, will convert to fully paid
ordinary shares at an issue price of $0.16.
The Company further announed the appointment of Mr Chris Hamilton as General Manager
Operations for the Hill End Reward Gold Mine; Mr Hamilton commences on 11 November
2024.
Page 7 of 14
Vertex Minerals Ltd Quarterly Activities Report – September 2024
CORPORATE & FINANCIAL
At 30 September 2024, the Company held A$0.63 million in cash, which excludes the proceeds
of the $2.2 million placement and convertible loan fund-raising announced in October .
Vertex’s expenditure during the Quarter was as follows:
Item
A$ (‘000s)
Cash Balance at beginning of Quarter
2,110
Proceeds from the sale of scrap materials and
equipment
15
Administration and Corporate Costs
(434)
Exploration and Evaluation
(343)
Payments for property, plant and equipment
(1,817)
Interest and cost of finance paid
(14)
Proceeds from issue of equity securities (net of costs)
1,077
Proceeds from borrowings
91
Repayment of borrowings
(51)
Cash Balance at End of Quarter
$633
During the quarter, the Company made payments of $195,222 to related parties in relation
to Directors’ fees and consulting fees for both technical and management services.
Page 8 of 14
Vertex Minerals Ltd Quarterly Activities Report – September 2024
TENEMENT INFORMATION (LISTING RULE 5.3.3)
Tenements acquired or disposed during the Quarter
N/A
Mining tenements held at the end of the Quarter
Tenement
Project
Status
Area
LOCATION
EL 5868
EL 6996
EL 8289
EL 9247
EL 9413
GL 5846
Hill End
Hargraves
Hill End
Hill End
Hill End
Hill End
Renewal Pending
Renewal Pending
Current
Current
Current
Current
16 Units
6 Units
1 Unit
2 Units
1 Unit
2.044 ha
NSW
NSW
NSW
NSW
NSW
NSW
ML 49
ML 50
ML 315
ML 316
ML 317
ML 913
ML 914
ML 915
ML 1116
ML 1541
ELA 6466
EPL 12008
E77/2651
E 63/2058
ELA 6466
EPL 12008
Hill End
Hill End
Hill End
Hill End
Hill End
Hill End
Hill End
Hill End
Hill End
Hill End
Hill End South
Hill End
Pride of Elvire
Taylors Rock
Hill End South
Hill End
Current
Current
Current
Current
Current
Renewal Pending
Renewal Pending
Renewal Pending
Current
Current
Application Pending
Issued
Current
Current
Application Pending
Issued
1.618 ha
3.02 ha
6.671 ha
8.846 ha
7 ha
22 ha
21.69 ha
13.27 ha
15.71 ha
279.2 ha
30 Units
51km2
57km2
30 Units
-
NSW
NSW
NSW
NSW
NSW
NSW
NSW
NSW
NSW
NSW
NSW
WA
WA
-
Interests may be held directly by the Company, a subsidiary, or contractually.
Farm-in or Farm-out Agreements entered into during the Quarter
N/A
Beneficial Percentage Interests Held in Farm-in or Farm-out agreements at the end of the
Quarter
N/A
Page 9 of 14
Vertex Minerals Ltd Quarterly Activities Report – September 2024
Page 10 of 14
Vertex Minerals Ltd Quarterly Activities Report – September 2024
ABOUT VERTEX
Hill End NSW:
• 14km of Continuous gold lode
• Gold recovers to gravity at +90%
• Most of the line of lode only mined to the water table
• The Hill End Gold project consists of 10 mining leases & 4 Exploration licenses located
in the core of the Hill End Trough on the eastern Lachlan Fold Belt.
• The area was first recognised as a gold centre in 1851 with a number of mining
operations established over the following 50 years
• Modern exploration has not been completed and a program of multi-element and
alteration mapping has been planned to better map out the zones of high-grade
mineralisation.
• Recent completion of a full geological review of the Hill End Gold Project and an
updated geological model - expected to underpin a new exploration campaign
• Largest Gold Specimen ever to be found globally found at Hill End
• Gravity Plant on site
• Fully permitted Gravity processing licence
Reward Gold Mine: 2.0g/t reporting cutoff grade
Hargraves: 0.8 g/t reporting cutoff grade (ASX Announcement 29 May 2020).
Red Hill: 0.5 g/t per block, ordinary kriging grade interpolation, classified mineral Resources Limited to 160mRL below surface.
(ASX Announcement November 2015)
Page 11 of 14
Vertex Minerals Ltd Quarterly Activities Report – September 2024
Hargraves NSW:
• Hargraves Gold project is located approximately 25km south of the town of Mudgee.
• The goldfield is 4 x 10 km with numerous mineralised structures with little modern
exploration.
• An updated mineral resource in accordance with JORC 2012 Code was completed by
SRK Consulting (Australasia) Pty Ltd (SRK).
• The Board will prioritise the development of this project by updating PFS, permitting
and further drilling to increase resources.
Taylor Rock WA:
• The Taylor Rock Project is located 80km WSW of Norseman in the Southern Goldfields
region of Western Australia
• The project has both Gold and Nickel potential, interesting historical intercepts
include:
§ 12NLJC0005: 2m @ 0.795% Ni from 202m
§ 12NLJC004: 2m @ 0.636% Ni from 250m
§ 10NLJC0132: 37m @ 0.477% Ni from 205m
ü Including 1m @ 1.02% Ni from 212m
ü 1m @ 0.835%Ni from 206m
ü 1m @ 0.822% Ni from 209m
ü 1m @ 0.766% Ni from 205m
§ LJPR0084: 3m @ 0.649%Ni from 15m
§ LJPA0145:
ü 1m @45.4g/t Au from 44m
ü 3m @ 9.84g/t Au from 42m
Pride of Elvire WA:
• The tenements surround the Mt. Elvire homestead approximately 210km north of
Southern Cross in Western Australia.
• Encouraging historical gold results include:
Significant Historical Intercepts from Drilling for Gold:
§ ME 30: 10m @ 23.2g/t Au from 17m
§ ME 22: 2.45m @ 9.29g/t Au from 0m
§ ME 31: 1m @ 144g/t Au from 15m
§ ME 21: 2.14m @ 1.77g/t Au from 0m
Significant Historical Rock chip results:
• 6754220mN, 757460mE: 215.3g/t Au
•
•
•
6754220mN, 757460mE: 179.7g/t Au
6759560mN, 757500mE: 43g/t Au
6759700mN, 757300mE: 30g/t Au
Page 12 of 14
Vertex Minerals Ltd Quarterly Activities Report – September 2024
•
•
•
•
6756500mN, 757120mE: 24.4g/t Au
6759560mN, 757500mE: 14.5g/t Au
6756500mN, 757120mE: 5.42g/t Au
6756500mN, 757120mE: 3.33g/t Au
To learn more, please visit: www.vertexminerals.com
Stay up to date with the latest news by connecting with VTX on LinkedIn and Twitter.
Competent Persons Statement
The information in this report that relates to the Reward Mineral Resource estimate is based on information
compiled by Mr. Troy Lowien, who is a full-time employee of Groundwork Plus. Mr. Lowien is a member of the
Australasian Institute of Mining and Metallurgy (FAusIMM), and has sufficient experience which is relevant to
the style of mineralisation and type of deposits under consideration and to the activity which he is undertaking
to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of
Exploration results, Mineral Resources and Ore Reserves”. Mr. Lowien consents to the inclusion of the data
contained in relevant resource reports used for this announcement as well as the matters, form and context in
which the relevant data appears.
The information in this report that relates to Exploration Results, Exploration Targets and the Hargraves and Red
Hill Resource Estimates is based on information compiled by Mr. Roger Jackson. Mr. Jackson is a Director and
Shareholder of the Company, who is a Fellow of the Australasian Institute of Mining and Metallurgy (FAusIMM),
Fellow of the Australasian Institute of Geoscientists and a Member of Australian Institute of Company Directors.
Mr. Jackson has sufficient experience which is relevant to the style of mineralisation and type of deposits under
consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012
Edition of the “Australasian Code for Reporting of Exploration results, Mineral Resources and Ore Reserves”. Mr.
Jackson consents to the inclusion of the data contained in relevant resource reports used for this announcement
as well as the matters, form and context in which the relevant data appears.
JORC Compliance Statements
This website contains references to Mineral Resource estimates, which have been extracted from previous ASX
announcements as set out above made by Peak Resources Ltd (ASX:PUA), the parent company of VTX prior to
the Company’s separate listing in 2022. For full details of Exploration Results in this release that have been
previously announced, refer to those announcements.
The Company confirms that it is not aware of any new information or data that materially affects the information
included in the said announcements, and in the case of estimates of Mineral Resources, that all material
assumptions and technical parameters underpinning the estimates in the relevant market announcements
continue to apply and have not materially changed. The Company confirms that the form and context in which
the Competent Persons’ findings are presented have not materially modified from the original market
announcements.
Forward Looking Statements and Important Notice
This report contains forecasts, projections and forward-looking information. Although the Company believes that
its expectations, estimates and forecast outcomes are based on reasonable assumptions it can give no assurance
that these will be achieved. Expectations and estimates and projections and information provided by the
Company are not a guarantee of future performance and involve unknown risks and uncertainties, many of which
are out of Vertex Minerals’ control.
Actual results and developments will almost certainly differ materially from those expressed or implied. Vertex
Minerals has not audited or investigated the accuracy or completeness of the information, statements and
opinions contained in this announcement. To the maximum extent permitted by applicable laws, Vertex Minerals
makes no representation and can give no assurance, guarantee or warranty, express or implied, as to, and takes
no responsibility and assumes no liability for the authenticity, validity, accuracy, suitability or completeness of,
or any errors in or omission from, any information, statement or opinion contained in this report and without
Page 13 of 14
Vertex Minerals Ltd Quarterly Activities Report – September 2024
prejudice, to the generality of the foregoing, the achievement or accuracy of any forecasts, projections or other
forward looking information contained or referred to in this report.
Investors should make and rely upon their own enquiries before deciding to acquire or deal in the Company’s
securities.
This announcement was approved by the Vertex Board of Directors
On behalf of the Directors
Roger Jackson
Executive Chairman
31 October 2024
Page 14 of 14
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Vertex Minerals Ltd
ABN
Quarter ended (“current quarter”)
68 650 116 153
30 September 2024
Consolidated statement of cash flows
Current quarter
$A’000
Year to date (3
months)
$A’000
10
10
(4)
(4)
(b) development
-
-
(c) production
-
-
(d) staff costs
-
-
(434)
(434)
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
(a) exploration & evaluation
(e) administration and corporate costs
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
-
-
1.5
Interest and other costs of finance paid
(14)
(14)
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(442)
(442)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(1,817)
(1,817)
(339)
(339)
(e) investments
-
-
(f)
-
-
(c) property, plant and equipment
(d) exploration & evaluation
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date (3
months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(5)
(5)
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(2,151)
(2,151)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
1,137
1,137
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
(60)
(60)
3.5
Proceeds from borrowings
91
91
3.6
Repayment of borrowings
(51)
(51)
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
1,117
1,117
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
2,110
2,110
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(443)
(443)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(2,151)
(2,151)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
1,117
1,117
(c) property, plant and equipment
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
Current quarter
$A’000
Year to date (3
months)
$A’000
4.5
Effect of movement in exchange rates on
cash held
-
-
4.6
Cash and cash equivalents at end of
period
633
633
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
633
2,110
5.2
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
633
2,110
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
119
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
76
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
6.1 Payment of director fees in accordance with disclosed consulting agreements
6.2 Payment to directors of additional consulting fees associated with exploration and
evaluation activities on terms consistent with the disclosed consulting agreements.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
351
351
7.1
Loan facilities
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
7.1 $197,000 loan provided by Caterpillar Financial Australia Limited for a 3 year period at
7.5% per annum, maturing on 15 September 2026. The loan is secured against an item of
equipment.
$18,689 loan provided by iQumulate Premium Funding at an effective interest rate of 16.7%
per annum for a 10 month period maturing on 31 December 2024 for insurance premiums.
$44,097 loan provided by Arteva Funding at an effective interest rate of 10.81% per annum
for a 10 month period maturing on 22 January 2025 for insurance premiums.
$90,695 loan provided by CEA Financial Services at 0.38% per annum for a 36 month
period maturing on 27 June 2027. The loan is secured against an item of equipment.
8.
Estimated cash available for future operating activities
$A’000
8.1
Net cash from / (used in) operating activities (item 1.9)
(443)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(339)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(782)
8.4
Cash and cash equivalents at quarter end (item 4.6)
633
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
633
0.81
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Yes
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Subsequent to the end of the quarter, the Company has raised the following funds:
• October 2024 – placement raising $1.10 million before costs
• October 2024 – convertible loan funding received of $0.98 million
The Company has further commitments for Tranche 2 of a placement annoubced in August
2024 to raise a further $2.9 million before costs, subject to shareholder approval.
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Yes. The Company’s Directors consider that VTX will be able to raise additional funds as
required to continue to fund its operations.
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
31 October 2024
Authorised by: ...Roger Jackson................................................................................
(Name of body or officer authorising release – see note 4)
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4.
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”.
5.
If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial
records of the entity have been properly maintained, that this report complies with the appropriate accounting standards
and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a
sound system of risk management and internal control which is operating effectively.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 5
Share your feedback
Discover