Ore Production Update - Reward Gold Mine
Released
Released
Announcement PDF
ASX ANNOUNCEMENT 24 SEPTEMBER 2025
ASX:VTX
ORE PRODUCTION UPDATE - FROM REWARD
UNDERGROUND GOLD MINE
Moving to high grade gold production
Operational Milestones
✓ Stoping of the 1670 airleg stope is well underway with production over the last 5
days of 125 tonnes mined and processed. Today, concentrates from gravity
processing are being further concentrated prior to delivery to the gold refinery.
✓ Commencement of drilling of the 1438 longhole stope commenced on 23
September and the Company expects to be blasting this stope within the next two
weeks. Figures 3 and 4 illustrate the stope design targeting production of 660
tonnes at a conservatively estimated grade of 6 g/t Au.
✓ Preparation for establishment of a cut and fill stope in Decline 3 (1720 Stope) are
progressing, with stripping of backs and installation of ground support underway to
allow jumbo access for ore production in October.
✓ The mining team are preparing a development heading on the Amalgamated vein.
This is part of the strategy of placing capital access development on veins outside of
the resource, to quickly advance exploration by mining.
✓ Electrical power is now distributed to all development and stoping fronts. This has
taken longer than planned due to delays in delivery and commissioning of
specialised equipment suitable for small development headings.
✓ Underground radio communication is now installed and operational mine wide. The
installation is to best practice reaching all working areas.
✓ A new Aramine loader was delivered on 23 September 2025 and is now being fitted
out for tele-remote operations.
✓ Reward ore will be processed via the gravity only gold processing plant located at
the entry to the mine. No chemicals are used in ore processing to produce gold.
✓ The underground mine ore will, over time, provide high grade feed to the gravity
plant.
✓ Vertex aims to have developed multiple mining fronts, with over around 400m of
strike to achieve continuous feed to the plant. The production ramp up is
continuing.
1
Vertex Minerals is pleased to announce the establishment of multiple mining fronts in the Reward
Underground Mine. The Company is employing multiple mining methods to diversify risk and
maximise head grade. These include airleg gallery and shrink stoping, jumbo cut and fill stoping and
narrow vein longhole open stoping.
The first of these fronts is the 1670 Shrink Stope (airleg), which is now in production. The focus of
this stope is low tonnage but high-grade ore.
Figure 1 – High grade veins in the “backs” of
the shrink stope.
Figure 2 – Chairman Roger Jackson inspecting
progress with miner Steven Jenno.
The second mining front is the establishment of the 1438 Longhole stope, with drilling commencing
on 23 September 2025. Figure 3 illustrates an oblique view of the stope while Figure 4 shows a typical
drill plan section with the high-grade Mica 1 and Mica 2 veins within the design.
Figure 3 – Oblique view of 1438 Longhole Stope.
2
Figure 4 – Drill Section looking south of 1438 Stope.
Longhole stoping is a mechanised and highly productive mining method that minimises development
requirements. The 1438 includes two high grade veins within the stope which maximises extraction
of the resource. The aim of longhole stoping is to provide base load production for gravity processing.
To support longhole stoping the Company has taken delivery of an Aramine 350D loader which is
presently being fitted with RCT’s remote controlled system, allowing the loader to be remotely
piloted for bogging out longhole stopes.
Figure 5 – Aramine 350D delivered to
Orange yesterday.
Figure 6 – Aramine 350D vs Epiroc ST18 size
comparison
3
Figure 7 – Remote control chamber
Figure 8 -Remote control equipment
The third mining front is the 1720 cut and fill stope which will utilise jumbo production to mine highgrade Mica and Mica 2 veins. New ground support is presently being installed, and stoping is
expected to commence in October 2025.
The fourth mining front is capital development on the Amalgamated Vein as shown in Figure 9. This
drive is designed to duplicate and parallel the existing access drive to the Reward Shaft, which will
allow the mining of stopes along the existing access drive. It is important to note that capital
development is placed on veins outside of the resource and in areas where there is no drilling. This
strategy expedites exploration and new discovery through the geological sampling of the developing
face and the Company expects that sections of this development will be economic to process and add
to gold production. Additional development headings will commence as mine scheduling allows.
Figure 9 – Amalgamated Vein bypass
4
Vertex is in the early stages of the underground mine’s development. The production ramp up has
been delayed largely due to issues in delivery and commissioning of high voltage electrical equipment,
however the decision to install 11,000 Volt power distribution will provide outstanding benefit over
the entire mine life. Vertex is now into increasing production from the underground mine and
anticipates continuous improvement in gold production over the remainder of the year.
The processing of gold ores without the use of chemicals continues to be optimised, with the focus
on improving recovery as we switch from processing surface stockpiles to higher grade underground
ore.
Figure 10 – Gold concentrate on the Gemini table
The Vertex Mining Team aims to exceed the highest safety and environmental standards as we
transition to 100% underground mining.
5
This announcement has been approved by the Executive Chairman.
Further Information:
Roger Jackson, Executive Chairman
roger@vertexminerals.com.au
Tully Richards, Technical Director
tully@vertexminerals.com.au
Follow Vertex Minerals on LinkedIn
Vertex Minerals Limited
ASX Code: VTX
ABN: 68 650 116 153
Vertex Flagship project
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
Commenced gold processing in new Gekko gravity gold plant
100% owned mining operation
No hedge - no secured debt – fully funded
High grade gold resource and reserve 225 ozs at 16.7g/t + more
Inherited AU$25 million of underground development at Reward
1.8m Au ozs historic mining
Reward sits just under the historic Hawkins Hill mine - 435kozs at 309 g/t Au
Production has commenced on stockpiles.
Underground development is well underway.
Underground high-grade gold production commencing in weeks
Up to 95% recovery by gravity processes only
Big gold system – 25km + strike
6
Mineral Resource Estimate (MRE) for the Reward gold deposit at Hill End now stands at
419,000t at 16.72g/t Au for 225,200oz Au1:
Classification
Cut-off
Tonnes
Au (g/t)
Ounces
Indicated
4
141,000
15.54
70,500
Inferred
4
278,000
17.28
154,700
Total
4
419,000
16.72
225,200
Global Mineral Resource estimate for the Hill End & Hargraves Gold Project
Hill End Project Mineral Resource Estimate
Deposit
Classification
Tonnes
(kt)
Grade
Au (g/t)
Contained
Au (koz)
Reward Gold Mine
Indicated
Inferred
Sub Total
141
278
15.5
17.3
71
155
419
16.7
225
1,109
1,210
2.7
2.1
97
80
2,319
2.4
178
413
1,063
1.4
1.8
19
61
1,476
1.7
80
1,663
2,551
8.9
8.6
187
296
4,214
8.7
482
Hargraves Project
Indicated
Inferred
Sub Total
Red Hill Project
Indicated
Inferred
Sub Total
Project Total
Indicated
Inferred
Grand Total
COMPETENT PERSON’S STATEMENT
The information in this report that relates to Exploration Results and Exploration Targets is based on
information compiled by Mr. Roger Jackson, a Director and Shareholder of the Company, who is a 25+ year
Fellow of the Australasian Institute of Mining and Metallurgy (FAusIMM), Fellow of the Australian Institute of
Geoscientists (FAIG) and a Member of Australian Institute of Company Directors. Mr Jackson is the Executive
Chairman and a full-time employee of Vertex Minerals Limited (“Company”), and a shareholder of the
Company. Mr. Jackson has sufficient experience which is relevant to the style of mineralisation and type of
deposits under consideration and to the activity which he is undertaking to qualify as a Competent Person as
defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration results, Mineral Resources
and Ore Reserves”. Mr. Jackson consents to the inclusion of the data contained in relevant resource reports
used for this announcement as well as the matters, form and context in which the relevant data appear.
FORWARD LOOKING STATEMENTS AND IMPORTANT NOTICE
This report contains forecasts, projections and forward-looking information. Although the Company believes
that its expectations, estimates and forecast outcomes are based on reasonable assumptions it can give no
1
(VTX ASX Announcement 21 June 2023).
7
assurance that these will be achieved. Expectations and estimates and projections and information provided
by the Company are not a guarantee of future performance and involve unknown risks and uncertainties, many
of which are out of Vertex Minerals’ control.
Actual results and developments will almost certainly differ materially from those expressed or implied.
Vertex Minerals has not audited or investigated the accuracy or completeness of the information, statements
and opinions contained in this announcement. To the maximum extent permitted by applicable laws, Vertex
Minerals makes no representation and can give no assurance, guarantee or warranty, express or implied, as
to, and takes no responsibility and assumes no liability for the authenticity, validity, accuracy, suitability or
completeness of, or any errors in or omission from, any information, statement or opinion contained in this
report and without prejudice, to the generality of the foregoing, the achievement or accuracy of any forecasts,
projections or other forward looking information contained or referred to in this report. Investors should
make and rely upon their own enquiries before deciding to acquire or deal in the Company’s securities.
JORC COMPLIANCE STATEMENTS
Where statements in this announcement refer to exploration results which previously been reported, the
Company confirms that it is not aware of any new information or data that materially affects the information
included in the original announcements, and in the case of estimates of Mineral Resources, that all material
assumptions and technical parameters underpinning the estimates in the relevant market announcements
continue to apply and have not materially changed. The Company confirms that the form and context in which
the Competent Persons’ findings are presented have not materially modified from the original market
announcements.
8
Share your feedback
Discover