FURTHER NEAR PLANT HIGH GRADE GOLD TARGETS AT HILL
END:
ASX ANNOUCEMENT 5TH DECEMBER 2023
HIGHLIGHTS:
•
Further high-grade gold targets identified south of Vertex’s Hill End Gold Plant and Reward
Resource,
•
Ground truthing LiDAR data reveals further workings around the South Star group of mines
(refer to Figure 1).
•
Multiple parallel gold bearing quartz veins at South Star strike >800m.
•
Historically, South Star reported most production was from the west-dipping veins on the
western limb of the Hill End Anticline. Weber and Baker (1977) cite reports stating “the
South Star vein averaged about 10cm wide to a depth of 51m and widened to 38-46 cm at
52m after passing into a shale host, with Au present in quartz over the entire vertical extent.
Grades of 153-184 g/t Au with one sample of 540 g/t Au were reported above 51m depth”
•
South Star lies 1.5km south of the Hill End Gold Plant and has the potential to provide future
feed,
•
No drilling has been carried out at South Star and only limited sampling has been completed,
•
The Vertex team are planning diamond drill programs at;
1. South Star,
2. Fosters Exploration Target and
3. Below the Reward Resource (see drill collar locations on Figure 1.)
*The above aim to build upon the existing Reward Resource
•
The Reward Gold Mine PFS expected to be finalised in December 2023
•
The Reward gold mine is well-placed for a simple start-up:
The existing gravity processing plant is located adjacent to the underground mine
access point
Mine access point extends into the resource, so only stripping and refurbishment
development is required.
Second egress in place with ladder way and motorised Alimak conveyance.
Some underground fleet and utility services are already in place.
Hill End gravity gold processing plant refurbishment near completion.
Permitted Mining licence and DA in place for Plant, Stockpiles, and the Reward
underground mine.
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
Vertex Minerals Limited (ASX:VTX) (“Vertex” or the “Company”) is pleased to advise further near mine
high grade gold targets have been recognised just south of the Gravity process plant and Reward Gold
Mine, Hill End NSW at the South Star group of gold mines.
Executive Director, Tully Richards commented:
“Vertex is pleased to announce further exploration and resource development opportunities as
its Reward Resource PFS comes closer to completion. Ground truthing of the company’s LiDAR
dataset, around the South Star group of gold mines, as covered by ML’s, has revealed greater
latitude for further ‘near mine’ resource growth. An extensive mapping and sampling program is
being planned for summer and drill program planning is underway.”
Figure 1 Showing in long section the location of the South Star lode relative to the Hill End Gold plant
and the High-grade Reward Gold Resource.
*
For further details of the current resource at Reward, refer ASX Announcement dated 26 June 2023
* For further details of the Fosters Exploration Target, refer ASX Announcement dated 29 August 2023
*Hawkins Hill was mined in the 1870s
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
Figure 2 Location of the South Star Lode relative to the Hill End Project and photo locations
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
(figures 3, 4,5)
The South Star
The South Star prospect area is located on the Hill End Anticline about 2-km south of Hawkins Hill and
immediately north of the Turon River. Linear arrays of old mine workings are present on both flanks
of the anticline and one or more saddle reefs outcrop along the axis. Most reported historical
production has come from laminated bedding-parallel quartz veins on the west limb of the anticline,
with reports that some occurrences are sets of multiple veins over minable widths.
Review of existing published and in-house reports and geologic and mineral deposit maps suggests
styles of mineralisation similar to that at Hawkins Hill-Reward. There is significant untested potential
for Reward-type bedding-parallel fold limb vein set high-grade Au targets in the South Star area, with
the caveat that the coincidence of Indicator-type feeder structures and significant bedding-parallel
vein set are present. Additionally, the potential for Hargraves and Germantown-type saddle reef
mineralisation has not been adequately investigated.
Historical information
Gold mineralisation was discovered in the 1860s by the Thomas Wythes party but there was little
production until the claims were acquired by the South Star Gold Mining Company in 1871 and Lewis’
crusher installed on the Turon River in September 1872. By that time the South Star Mine underlay
shafts on the west limb veins extended to 51.8-m.
Most reported production was from the W-dipping veins of South Star line on the west flank of the
Hill End Anticline. Weber and Baker (1977) cite old reports stating that this vein averaged about 10cm wide (Figure 2) to a depth of 51-m and widened to 38-46 cm at 52-m after passing into a shale
host, with Au present in quartz over the entire vertical extent. It is unclear whether the vein cuts
stratigraphy or this represents a facies change. Grades of 153-184 gpt Au with one sample of 540 gpt
Au were reported above 51-m depth. Button (1987) quotes records of some crushings (1.4-24.5
tonnes) from South Star ranging from 15-78 gpt Au.
The South Star shaft was extended to 69-m in 1873 and mined two quartz veins 7-cm apart. The shaft
reached 74-m in 1874 with the veins only 5-cm apart and the main vein widening. The shaft is reported
at 82-m in 1877. Similar multiple quartz veins separated by less than a metre are reported from the
Clan Campbell Mine to the south.
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
Figure 3 Layback shaft on the Brand and fletcher lode (Quartz) in the South Star area. Host
rock Turbidites and Greywackes
Figure 4 South Star lode showing two quartz veins, in Turbidities and Greywackes
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
Figure 5 South Star load showing a quartz vein at surface at around 30cm thick,
hosted in Turbidites
This announcement has been approved by the Board of Vertex Minerals Limited.
Further Information:
Roger Jackson, Executive Chairman
Tully Richards, Technical Director
roger@vertexminerals.com.au
tully@vertexminerals.com.au
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
ABOUT VERTEX MINERALS LIMITED
Vertex Minerals Limited (ASX: VTX) is an Australian based gold exploration company developing its advanced Hill
End gold projects located in the highly prospective Eastern Lachlan Fold Belt of Central West NSW. Other Company
assets include the Pride of Elvire gold project and Taylor Rock gold/nickel/lithium project both located in the
Eastern Goldfields of WA. The focus of Vertex Minerals is to advance the commercial production of gold from
its NSW projects embracing an ethical and environmentally sustainable approach:
•
•
•
•
•
Gravity Separation: The deportment of gold at the Hill End Project allows high recovery to a concentrate
produced using gravity separation techniques.
Direct Smelting: The use of direct smelting of a gold concentrate that eliminates the need to use cyanide as
a solvent.
Contrast in Density: These separation techniques take advantage of the contrast in density of gold (ρ=19.3)
relative to quartz (ρ=2.65).
Renewable Energy Potential: The unique landscape and infrastructure makes Hill End ideal for the
establishment of renewable sources of power. The Crudine Ridge Windfarm is only 30km from the project
site and Vertex plans to examine a pumped hydro-electricity scheme as an integral part of any proposed
development. The topography and existing mine workings including shafts and adits make the establishment
of a pumped hydro scheme achievable at modest expense.
Benign Tailings: The tailings will essentially be quartz with little to no sulphide minerals.
HARGRAVES GOLD PROJECT (NSW)
•
•
•
Hargraves Gold project is located approximately 2 5 km south of the town of Mudgee.
The goldfield is 4 x 10 km with numerous mineralised structures with little modern exploration.
An updated mineral resource in accordance with JORC 2012 Code was completed by SRK Consulting
(Australasia) Pty Ltd (SRK) – total of 2.3Mt at 2.38g/t Au for 177koz Au.
HILL END GOLD PROJECT (NSW)
•
Consists of 10 mining leases and three Exploration Licences located in the core of the Hill End Trough on the
eastern Lachlan Fold Belt.
•
Gravity Gold Plant
•
•
PFS underway for the Reward Gold Mine
24km of continuous gold lode with gold recovery rate to gravity at +90%. Pride of Elvire Gold Project (WA)
•
Tenements surround the Mt. Elvire homestead approximately 210km north of Southern Cross in
Western Australia
The project has seen historical drilling with encouraging gold results achieved.
•
TAYLOR ROCK PROJECT (WA)
•
•
Located 80km WSW of Norseman in the Southern Goldfields region of Western Australia.
The project has both Gold and Nickel potential, interesting historical intercepts have recorded
encouraging mineralisation.
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
HILL END GLOBAL RESOURCE
Deposit
Reward Gold Mine1
Sub Total
Hill End Project Mineral Resource Estimate
Classification
Tonnes
Grade
(kt)
Au (g/t)
Indicated
Inferred
141
278
419
15.5
17.3
16.7
71
155
225
Indicated
Inferred
1,109
1,210
2,319
2.7
2.1
2.4
97
80
178
Indicated
Inferred
413
1,063
1,476
1.4
1.8
1.7
19
61
80
Indicated
Inferred
1,663
2,551
4,214
3.5
3.6
3.6
187
296
483
Hargraves Project2
Sub Total
Contained
Au (koz)
Red Hill Project
Sub Total
Project Total
Grand Total
FOSTERS EXPLORATION TARGET3
Deposit
Range
Fosters below Reward Gold Mine Lower
Range
Upper
Range
Tonn
es
(kt)
524
Au (g/t)
Ounces Au
(koz)
12.5
211
524
19
320
Cautionary Statement
The Exploration Target is conceptual in nature as there has been insufficient exploration to define a
Mineral Resource. It is uncertain if further exploration will result in the determination of a Mineral
Resource under the “Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves, the JORC Code” (JORC 2012). The Exploration Target is not being reported as part of
any Mineral Resource or Ore Reserve.
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
COMPETENT PERSONS STATEMENT
The information in this report that relates to Exploration Results and Exploration Targets is based
on information compiled by Mr. Roger Jackson, a Director and Shareholder of the Company, who is
a 25+ year Fellow of the Australasian Institute of Mining and Metallurgy (FAusIMM), Fellow of the
Australian Institute of Geoscientists (FAIG) and a Member of Australian Institute of Company
Directors. Mr. Jackson has sufficient experience which is relevant to the style of mineralisation and
type of deposits under consideration and to the activity which he is undertaking to qualify as a
Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of
Exploration results, Mineral Resources and Ore Reserves”. Mr. Jackson consents to the inclusion of
the data contained in relevant resource reports used for this announcement as well as the matters,
form and context in which the relevant data appear.
FORWARD LOOKING STATEMENTS AND IMPORTANT NOTICE
This report contains forecasts, projections and forward-looking information. Although the Company
believes that its expectations, estimates and forecast outcomes are based on reasonable
assumptions it can give no assurance that these will be achieved. Expectations and estimates and
projections and information provided by the Company are not a guarantee of future performance
and involve unknown risks and uncertainties, many of which are out of Vertex Minerals’ control.
Actual results and developments will almost certainly differ materially from those expressed or
implied. Vertex Minerals has not audited or investigated the accuracy or completeness of the
information, statements and opinions contained in this announcement. To the maximum extent
permitted by applicable laws, Vertex Minerals makes no representation and can give no assurance,
guarantee or warranty, express or implied, as to, and takes no responsibility and assumes no liability
for the authenticity, validity, accuracy, suitability or completeness of, or any errors in or omission
from, any information, statement or opinion contained in this report and without prejudice, to the
generality of the foregoing, the achievement or accuracy of any forecasts, projections or other
forward looking information contained or referred to in this report. Investors should make and rely
upon their own enquiries before deciding to acquire or deal in the Company’s securities.
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
JORC COMPLIANCE STATEMENTS
Where statements in this announcement make reference to exploration results which previously
been reported, the Company confirms that it is not aware of any new information or data that
materially affects the information included in the original announcements, and in the case of
estimates of Mineral Resources, that all material assumptions and technical parameters
underpinning the estimates in the relevant market announcements continue to apply and have not
materially changed. The Company confirms that the form and context in which the Competent
Persons’ findings are presented have not materially modified from the original market
announcements.
1 For further details of the current resource at Reward, refer ASX Announcement dated 26 June 2023
2 For further details of the resource at Hargraves and Red Hill, refer to the IGR in the Company’s listing prospectus dated
21 October 2021 and released on ASX on 12 January 2022.
3 For further details of the Fosters Exploration Target, refer ASX Announcement dated 29 August 2023
Sources of information and maps include:
•
Geological Survey of NSW Department of Mines survey report GS 1975/279, “Appraisal of geological work involved
in mapping in the South Star area, Hill End” by Bowman, Holmes and Baker in October 1975.
•
Geological Survey of NSW Department of Mines survey report GS 1977/045, “The South Star line of reefs, Hill End,
NSW” by Weber and Baker in March 1977. Good detailed information on the South Star line of lode.
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
APPENDIX 1. SOUTH STAR – JORC CODE TABLE 1, CHECKLIST OF ASSESSMENT AND REPORTING CRITERIA
Section 1: Sampling Techniques and Data
CRITERIA
JORC Code Explanation
Commentary
SAMPLING
TECHNIQUES
•
Nature and quality of sampling (e.g., cut
channels,
random
chips,
or
specific
specialised industry standard measurement tools
appropriate to the minerals under investigation, such as
down hole gamma sondes, or handheld XRF instruments,
etc). These examples should not be taken as limiting the
broad meaning of sampling.
•
No sampling has been carried out.
•
Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or systems
used.
•
Not Applicable.
•
Aspects of the determination of mineralisation
that are Material to the Public Report. In cases
where ‘industry standard’ work has been done this would
be relatively simple (e.g., ‘reverse circulation drilling was
used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other
cases, more explanation may be required, such as where
there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g.,
submarine nodules) may warrant disclosure of detailed
information.
•
Not Applicable.
•
DRILLING
TECHNIQUES
Drill type (e.g., core, reverse circulation, openhole hammer, rotary air blast, auger, Bangka,
sonic, etc) and details (e.g., core diameter, triple or
standard tube, depth of diamond tails, face-sampling bit,
or other type, whether core is oriented and if so, by what
method, etc).
•
No drilling is being reported on.
DRILL SAMPLE
RECOVERY
•
Method of recording and assessing core and chip
sample recoveries and results assessed.
•
Not Applicable.
•
Measures taken to maximise sample recovery and
ensure representative nature of the
samples.
•
Not Applicable.
•
•
Not Applicable.
Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential loss/gain of
fine/coarse material.
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
CRITERIA
JORC Code Explanation
Commentary
LOGGING
•
•
Not Applicable.
•
Whether logging is qualitative or quantitative in •
nature. Core (or costean, channel, etc) .
photography.
Not Applicable.
•
The total length and percentage of the relevant
intersections logged.
•
Not Applicable.
If core, whether cut or sawn and whether
quarter, half or all core taken.
•
Not Applicable.
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
•
Not Applicable.
•
For all sample types, the nature, quality, and
appropriateness of the sample preparation
technique.
•
Not Applicable.
•
Quality control procedures adopted for all subsampling stages to maximise representivity of
samples.
•
Not Applicable.
Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field
duplicate/second-half sampling.
•
Not Applicable.
•
•
Not Applicable.
SUB-SAMPLING
TECHNIQUES AND
SAMPLE
PREPARATION
Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical studies.
•
•
dry.
•
Whether sample sizes are appropriate to the grain
size of the material being sampled.
.
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
QUALITY OF ASSAY
DATA AND
LABORATORY TESTS
CRITERIA
•
The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or total.
•
JORC Code Explanation
No samples have been submitted for assaying yet
Commentary
•
For
geophysical
tools,
spectrometers,
• No geophysical tools, spectrometers, or
handheld
XRF
instruments,
etc,
the
handheld XRF instruments have been used to
parameters used in determining the analysis including date to determine chemical composition at a semiinstrument make and model, reading times, calibrations quantitative level of accuracy.
factors applied and their
derivation, etc.
VERIFICATION OF
SAMPLING AND
ASSAYING
LOCATION OF DATA
POINTS
•
Nature of quality control procedures adopted (e.g.,
standards, blanks, duplicates, external laboratory
checks) and whether acceptable
levels of accuracy (i.e., lack of bias) and precision have
been established.
•
No samples have been dispatched to date.
•
•
It has not been possible to independently verify
significant intersections to date.
There has been no use of twinned holes to date.
•
Documentation of primary data, data entry
procedures, data verification, data storage .
(physical and electronic) protocols.
•
•
•
•
Discuss any adjustment to assay data.
•
•
No adjustments to assay data have been made.
•
LiDAR data was collected in GDA2020 – MGAz55, by
Aerometrex Ltd using a fixed wing aircraft flying at 1000m.
Data was collected at a resolution of 10 points per
square metre and 10cm vertical accuracy.
The verification of significant intersections by
either independent or alternative company
personnel.
• The use of twinned holes.
Accuracy and quality of surveys used to locate drill
holes (collar and down-hole surveys),
trenches, mine workings and other locations used in
Mineral Resource estimation.
•
Not Applicable.
Surface workings around the South Star group of
mines (ie shafts, adits, mine dumps and associated
mining related infrastructure) were picked up during
a LiDAR survey completed in August 2022.
Survey control required prior to processing said
LiDAR was completed by Precision Exploration
Services.
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
CRITERIA
DATA SPACING AND
DISTRIBUTION
JORC Code Explanation
Commentary
Processing of the resulting survey-controlled LiDAR
data was completed by GeoCloud Analytics. Out puts
included a 0.5m resolution DEM from which surface
workings could be recognized and highlighted.
•
Specification of the grid system used.
•
GDA2020 – MGAz55
•
Quality and adequacy of topographic control.
•
•
Data spacing for reporting of Exploration
Results.
Surveyed static base points, levelling swatches tied
into available Trig Stations (for vertical control) and
level and frequency control pickups followed by RTK
processing ensured a very high quality data set
The spacing of LiDAR data collected was 10 points
per square metre..
•
•
ORIENTATION OF
DATA IN RELATION
TO GEOLOGICAL
STRUCTURE
•
Whether the data spacing and distribution is
sufficient to establish the degree of geological and
grade continuity appropriate for the
Mineral Resource and Ore Reserve estimation
procedure(s) and classifications applied.
•
•
•
Whether sample compositing has been
applied.
There are no Mineral Resources or Ore Reserves.
.
Not Applicable, no sample compositing was carried
out on site.
•
Whether the orientation of sampling achieves
unbiased sampling of possible structures and
the extent to which this is known, considering the
deposit type.
•
LiDAR data at the high resolution collected results
in an unbiased representation of geological and
cultural features.
•
If the relationship between the drilling orientation
and the orientation of key mineralised structures
is considered to have
introduced a sampling bias, this should be assessed and
reported if material.
•
Not Applicable.
SAMPLE SECURITY
•
•
Not Applicable (sampling has yet to be carried out)
CRITERIA
JORC Code Explanation
AUDITS OR REVIEWS
•
The measures taken to ensure sample
security.
The results of any audits
sampling techniques and data.
Commentary
o
r
reviews
of
•
Not Applicable.
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
Section 2: Reporting of Exploration Results
CRITERIA
JORC Code explanation
Commentary
MINERAL
TENEMENT AND
LAND TENURE
STATUS
•
Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or
national park and environmental settings.
•
The Project tenements are 100% held by Vertex
Minerals Limited.
•
The security of the tenure held at the time of
reporting along with any known impediments
to obtaining a licence to operate in the area.
•
All tenements are in good standing.
EXPLORATION DONE
BY OTHER PARTIES
•
Acknowledgment and appraisal of exploration by
other parties.
•
Geological Survey of NSW report GS1977/045 by C.R.
Weber and C.J. Baker provides a good summary of
exploration by other parties on “THE SOUTH STAR LINE
OF GOLD REEFS, HILL END NSW”
GEOLOGY
•
Deposit type, geological setting, and style of
mineralisation.
•
The below ‘South Star summary of geology’ is quoted
from, Geological Survey of NSW report GS1977/045 by
C.R. Weber and C.J. Baker “THE SOUTH STAR LINE OF
GOLD REEFS, HILL END NSW”
“Surface and underground geological investigations
along (parts of) the South Star Line of Gold Reefs, Hill
End, have shown the auriferous quartz veins in the area
are mostly parallel to bedding and dip westerly at
55degs to 60degs. They are probably epigenetic and
were perhaps formed during diagenesis. The quartz
veins contain gold. The country rocks at South Star are
different to the country rocks at Hawkins Hill, where
rich gold deposits have been found previously. The
South Star quartz veins do not appear to occupy similar
stratigraphic positions as those at Hawkins Hill.
DRILL HOLE
INFORMATION
DATA AGGREGATION
METHODS
•
A summary of all information material to the
understanding of the exploration results
including a tabulation of the following information
for all Material drill holes:
− Easting and northing of the drill hole collar.
− Elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole
collar.
− Dip and azimuth of the hole.
− Down hole length and interception depth.
− Hole length.
•
Not Applicable as no drilling has been completed
•
If the exclusion of this information is justified on
the basis that the information is not Material
and this exclusion does not detract from the
understanding of the report, the Competent
Person should clearly explain why this is the
case.
•
Not Applicable as no drilling has been completed
•
No results are being reported
•
In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g., cutting of
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
CRITERIA
JORC Code explanation
Commentary
high grades) and cut-off grades are usually
Material and should be stated.
•
Where aggregate intercepts incorporate short
lengths of high grade results and longer lengths of
low grade results, the procedure
used for such aggregation should be stated and
some typical examples of such
aggregations should be shown in detail.
•
No grades are reported
The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
•
No metal equivalents are reported.
These relationships are particularly important
in the reporting of Exploration Results.
•
No local grid has been applied.
If the geometry of the mineralisation with respect
to the drill hole angle is known, its nature should
be reported.
•
Not Applicable as no drilling has been completed
•
•
Not Applicable as no drilling has been completed
DIAGRAMS
If it is not known and only the down hole
lengths are reported, there should be a clear
statement to this effect (e.g., ‘down hole
length, true width not known’).
•
•
Refer to figures contained within this report.
BALANCED
REPORTING
•
Appropriate maps and sections (with scales) and
tabulations of intercepts should be
included for any significant discovery being
reported These should include, but not be limited
to a plan view of drill hole collar
locations and appropriate sectional views.
•
Balanced reporting of Exploration
presented within this report.
OTHER
SUBSTANTIVE
EXPLORATION DATA
•
Other exploration data, if meaningful and
material, should be reported including (but not
limited to): geological observations; geophysical
survey results; geochemical survey results; bulk
samples – size and method of treatment;
metallurgical test results; bulk density,
groundwater,
geotechnical
and
rock
characteristics;
potential
deleterious
or
contaminating substances.
•
The Project includes exploration data collected by
previous companies, including
geological mapping and mine drawings (which are yet
to be digitized)
•
The nature and scale of planned further work (e.g.,
tests for lateral extensions or depth extensions or
large-scale step-out drilling).
•
Vertex plans to conduct drilling followed by
Resourcing, met work, tailings characterization, waste
characterization to then undertake a scoping study
•
Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.
•
Refer to figures contained within this report.
•
RELATIONSHIP
BETWEEN
MINERALISATIO N
WIDTHS AND
INTERCEPT LENGTHS
FURTHER WORK
•
•
Where comprehensive reporting of all Exploration
Results is not practicable, representative reporting
of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.
•
Previous mining has been limited and involved very
selective mining and hand sorting. No systematic data
has been collected to date to
assess metallurgy and mining parameters relevant to a
modern operation.