Annual Report to shareholders
Released
Released
Announcement PDF
ABN 68 650 116 153
ANNUAL REPORT
FOR THE YEAR ENDED
30 JUNE 2023
VERTEX MINERALS LIMITED
ABN 68 650 116 153
Contents
Corporate directory
Chairman’s report
Directors’ report
Auditor’s independence declaration
Statement of profit or loss and other comprehensive income
Statement of financial position
Statement of changes in equity
Statement of cash flows
Notes to the financial statements
Independent auditor’s report
Directors’ declaration
Corporate Governance
Additional ASX information
Page
1
2
4
30
31
32
33
34
35
61
65
66
67
VERTEX MINERALS LIMITED
ABN 68 650 116 153
Corporate Directory
Directors
Roger Jackson
Executive Chairman
Tully Richards
Technical Director
Declan Franzmann
Non-Executive Director
Auditors
William Buck
Level 20
181 William Street
Melbourne WA 3000
Bankers
National Australia Bank
Company Secretary
Alex Neuling
Securities Exchange Listing
Australian Securities Exchange
Principal and Registered Office
Unit 38
460 Stirling Highway
Peppermint Grove WA 6011
Home Exchange: Perth, Western Australia
Code: VTX
Telephone: +61 8 6270 6316
Email: info@vertexminerals.com.au
Website: www.vertexminerals.com.au
Share Registry
Automic Group
Level 5, 191 St Georges Terrace
Perth WA 6000
Telephone: 1300 288 664
1
VERTEX MINERALS LIMITED
ABN 68 650 116 153
Chairman’s Report
It is my privilege to present this Annual Report, reflecting on a year in which Vertex Minerals
Limited (‘Vertex’) has made significant progress towards creating enhanced shareholder
wealth, and set a strong platform to move to gold production. We achieved this through
strong execution on the following list of objectives:
•
•
•
•
•
•
•
•
•
Proving the high-grade gold resource at Hill End is consistent and predictable;
Building up gold inventories and moving Hill End into producer status with the NSW
Department of Mines;
Undertaking an internal review of the Underground mining viability of the high-grade
Reward Mine;
Commencing a Pre-Feasibility Study into the Reward Gold Mine (‘Reward’) and the
associated gravity gold plant;
Commencing refurbishment and an equipment upgrade at the Hill End gravity gold
plant;
On-boarding experienced staff to strengthen the on-site management team;
Establishing industry-standard mining and exploration systems across the project
suite
Building robust community relations; and
Continuing to build on our ESG credentials.
Again, this has been a very busy year, and one of significant progress towards the Company’s
stated objective of becoming a gold producer. Pleasingly, the pickup in activity was achieved
without any safety or environmental incidents. For this I am grateful to our team working on
site at Hill End, who have carried out a busy period of development with an ongoing
commitment to the highest standards of safety.
Over the course of the 2023 financial year, we have advanced a staged approach to moving
Hill End to production. Following a successful sampling program on the existing stockpiles,
which sit alongside the Gravity gold plant, we commenced a refurbishment and equipment
upgrade of the Gold plant. The processing of stockpiles at the Hill End Gravity Gold plant is
strategic, as it allows us to upgrade the plant, build critical infrastructure, develop safety,
operating and environmental systems, and on-board personnel while we undertake a PreFeasibility Study on the high-grade Reward underground mine. The plant and infrastructure
that has been acquired or refurbished in this exercise will be utilised in the expanded capacity
plant, which will be key to producing low-cost ounces when we commence underground
mining next year.
2
VERTEX MINERALS LIMITED
ABN 68 650 116 153
Chairman’s Report
We are very excited by the updated resource at Reward which sets the tone for the broader
potential of the Hill End gold precinct. We have recently reported an Exploration Target that
sits along strike, and close to the Reward Resource. We are confident of significantly
expanding these high-grade ounces at Reward when we commence mining, with a dedicated
underground diamond drilling rig.
The commitment to the Pre-Feasibility Study for a high-grade operation at Hill End is a
tremendous endorsement of the project and its potential to deliver substantial value to
shareholders. We remain committed to our stated goal of becoming a gold producer.
Given the Reward gold deposit was trial mined in 2009 and 2010 we are very fortunate to
have all the building blocks for project development already in place, including an adit for
direct access and a shaft for a second egress. Further there is significant mine development
within the envelope of a highly prospective bonanza grade gravity recoverable gold. Once
mine operations commence, we plan to be drilling these very exciting targets that are located
down plunge from the famous Hawkins Hill Mine.
We are fortunate that there is also significant upside on the exploration front, on the 100%
owned 34km long Exploration tenement. Results from the comprehensive Lidar survey we
undertook indicate that there are over 3,500 shallow historic workings along the whole length
of our tenements - most of which have not had a single drill hole.
Hill End is a unique gold orebody, not only because of its incredibly high grades but because
of its ability to recovery solely by gravity. Further, it has a unique composition and lack of
sulphides which means we have no acid issues with tails or dumps. The ore only requires a
simple grind and recovery by centrifuge. We do not require chemicals to recover the gold and
we recycle our water, and we have a clear pathway to develop into a low environmentalimpact gold producer.
I would like to take this opportunity to thank our hard-working management team, Board of
Directors, operations team and our administration team. Thanks also to our loyal
shareholders for their ongoing support, and I look forward to providing more exciting updates
as the 2024 financial year progresses.
Roger Jackson
Executive Chairman
3
VERTEX MINERALS LIMITED
ABN 68 650 116 153
Directors’ Report
The Directors of Vertex Minerals Ltd (the Company) submit herewith the annual report of the
Company for the financial year ended 30 June 2023. In order to comply with the provisions of
the Corporations Act 2001, the Directors report as follows:
Directors
The names and particulars of the Directors of the Company during or since the end of the
financial year are:
Roger Jackson - Executive Chairman
Appointed 1 June 2021
Mr Roger Jackson has been actively involved in the mining industry for over 30 years as a mine
operator, services contractor and explorer. He is a qualified geologist with a strong knowledge
of gold exploration and mining.
Mr Jackson was a founding director of privately owned Central Gold Mines and Bracken
Resources, which refurbished and re-started the Georgetown and Hillgrove gold plants. He
was also the founding director of Hellyer Gold Mines and driver behind the recommissioning
of the Hellyer polymetallic concentrator. He is a long-standing Member of the Australian
Institute of Company Directors, Fellow of the Australian institute of Geoscientists, Fellow of
the Geological Society of London and Fellow of the Australasian Institute of Mining and
Metallurgists.
Mr Jackson is currently a director of Ark Mines Limited (ASX:AHK) since 2010, QX Resources
(ASX:QXR) since 2020. Mr Jackson was previously a director of Pan Asia Metals (ASX:PAM)
from October 2020 to June 2022 and a director of NQ Minerals PLC from 2016 to May 2021.
At the date of this report, Mr Jackson holds an interest in 1,147,000 ordinary shares,
1,050,000 performance rights and 87,500 options.
Tully Richards - Technical Director
Appointed 1 June 2021
Mr Richards is an experienced copper / gold geologist based in Orange, NSW. For the last 10
years, Tully has operated his own geological consulting business (Central West Scientific Pty
Ltd) focused on NSW and in particular the Lachlan Fold belt. Tully has a wonderful depth and
breadth of experience in exploration in the Lachlan Fold district. A graduate in geology from
Sydney University in 1993, initially he worked with Hargraves Resources on the Browns Creek
mine and associated tenements, followed by four years in Western Australia from 1996-99
mining nickel and gold with Western Mining Corp. then Lion Ore.
4
VERTEX MINERALS LIMITED
ABN 68 650 116 153
Directors’ Report (continued)
Mr Richards then worked for Newcrest Mining at Cadia Valley until 2005 before working for
two years with Rangott Mineral Exploration to 2007. Since that time, Tully has also held the
Exploration Manager position with Gold and Copper Resources.
At the date of this report, Mr Richards holds an interest in 866,667 ordinary shares, 1,050,000
performance rights and 108,334 options.
Declan Franzmann -Non-Executive Director
Appointed 1 June 2021
Mr Franzmann is a mining engineer with over 29 years of experience ranging from exploration
programs, feasibility and other technical studies, mine construction and mine management
through to mine closure. His experience includes open pit and underground metalliferous
mining across Australia, Asia, Africa and South America.
Most recently, Declan was VP of Operations for Black Mountain Metals Pty Ltd. He has also
held positions as President, Chief Executive Officer & Director at African Gold Group, Inc,
listed on the TSX (May 2014-June 2017), and has been a director of Lachlan Star Ltd (ASX:LSA)
from 2007 to 2018. Declan is a Fellow of the AusIMM and holds statutory mine management
qualifications for Western Australia, Queensland and New South Wales
At the date of this report, Mr Franzmann holds an interest in 920,000 ordinary shares,
1,050,000 performance rights and 115,000 options.
Company Secretary
Alex Neuling
Mr Neuling is a Chartered Accountant and chartered company secretary with over 20 years
corporate and financial experience, including 10 years as company secretary, CFO &/or a
Director of various ASX listed companies in the Oil & Gas, Mineral Exploration, Biotech Mining
Services sectors. Prior to these roles, Mr Neuling worked at Deloitte in London and in Perth.
Mr Neuling is currently a non-executive director of PetroNor E&P Limited (listed on Oslo
Axess:PNOR) (from April 2020) and Industrial Minerals Ltd (ASX:IND) (from July 2021).
5
VERTEX MINERALS LIMITED
ABN 68 650 116 153
Directors’ Report (continued)
Principal activities
The principal activity of the Company during financial year was mineral exploration in New
South Wales and Western Australia.
Review of operations
Highlights for the year
▪
An updated Mineral Resource Estimate for the Reward Gold Mine at the Hill End Gold
Project was carried out by independent consultants HGS Australia, in accordance with
the guidelines set in the 2012 JORC Code.
▪
Mineral Resource Estimate (MRE) for the Reward gold deposit at Hill End now stands at
419,000 tonnes at 16.72g/t Au for 225,200oz Au:
Classification
Indicated
Inferred
Total
Cut-off
4
4
4
Tonnes
141,000
278,000
419,000
Au (g/t)
15.54
17.28
16.72
Ounces
70,500
154,700
225,200
▪
A conceptual mine plan was undertaken for the Reward underground mine which has
provided the basis for the ongoing Pre-Feasibility study.
▪
Inspection of the Hill End Underground Mine (i.e. Amalgamated Adit and associated 640
Level drives, cross-cuts and stopes together with the Reward Shaft/Alimak) with
confirmation that areas earmarked for future access are in good working order after
the mine was put on ‘care and maintenance’ in 2011.
▪
Hill End gravity gold processing plant refurbishment advanced near to completion, with
fully permitted Mining licence and DA in place for Plant, Stockpiles and the Reward
underground mine.
▪
Trench sampling provided confirmation of gold in additional stockpiles at Hawkins Hill.
Sampling of the Process Plant Stockpile, Tails Dam Road Stockpile and Consolidated Pad
revealed that each contained gold.
▪
Diamond drilling was undertaken at the Red Hill deposit and at the Hargraves Mine.
Robust gold grades were intercepted and they will add to the gold inventory at Hill End.
6
VERTEX MINERALS LIMITED
ABN 68 650 116 153
Directors’ Report (continued)
Resource Upgrade – Reward Gold Mine
Vertex completed an updated Mineral Resource Estimate (MRE) for the Reward gold deposit
at the 100%-owned Hill End gold project near Orange in the NSW Lachlan Fold belt (refer ASX
Announcement 26 June 2023). The MRE was carried by independent consultants HGS
Australia in accordance with 2012 JORC Code
The upgraded Mineral Resource for the Reward Gold Mine now totals 419,000 tonnes, with
a 278kt Inferred Resource and a 141kt Indicated Resource, at a weighted average grade of
16.72 g/t Au for 225,200oz(154,700oz Inferred and 70,500oz Indicated). This brings the global
Mineral Resource estimate for the Hill End & Hargraves Gold Project to 485,000 ounces at 3.6
g/t (refer Table 1). Whilst the total contained gold is similar to the previous estimate,
improved interpretation of the deposit geology reflects the quality of ore that was previously
processed at Hill End:
Hill End Project Mineral Resource Estimate
Deposit
Classification
Tonnes
(kt)
Grade
Au (g/t)
Contained
Au (koz)
141
278
15.5
17.3
71
155
419
16.7
225
1,109
1,210
2.7
2.1
97
80
2,319
2.4
178
413
1,063
1.4
1.8
19
61
1,476
1.7
80
1,663
2,551
3.5
3.6
187
296
4,214
3.6
483
Reward Gold Mine
Indicated
Inferred
Sub Total
Hargraves Project
Indicated
Inferred
Sub Total
Red Hill Project
Indicated
Inferred
Sub Total
Project Total
Indicated
Inferred
Grand Total
Table 1
The Reward gold mine is well-placed for a simple start-up, with the existing gravity processing
plant is located adjacent to the underground mine access point. The mine access point
extends into the resource, so little development is required. Hill End gravity gold processing
plant refurbishment is also near completion, with full permits including a tailings dam permit
which has the capacity to allow immediate commencement of operations.
7
VERTEX MINERALS LIMITED
ABN 68 650 116 153
Directors’ Report (continued)
Hawkins Hill Stockpiles
▪
Vertex has been actively assessing all potential ore sources for processing feed stock.
Further to Vertex’s ASX release dated 22nd Feb. 2023, the Company is pleased to
announce trench sampling of the Process Plant Stockpile, Tails Dam Road Stockpile &
Consolidated Pad revealed each contains gold
▪
The Process Plant Stockpile & Tails Dam Road Stockpile are located within 70m-90m of
the Company’s Gold Gravity Plant while the Consolidated Pad is located.
▪
Domains of waste versus mineralisation are evident resulting in higher grade zones;
▪
Process Plant Stockpile averages 1.26g/t Au across 24 samples with a max gold value of
5.50g/t Au
o
Tails Dam Road Stockpile averages 2.10g/t Au across 15 samples with a max gold
value of 12.20g/t Au; and
o
Consolidated Pad averages 0.89g/t Au across 20 samples with a max gold value of
6.74g/t Au
▪
Grade estimation of stockpiles can be difficult due to their random nature and can only
truly be determined by processing a bulk sample. Vertex plans to run a bulk sample
through the Hill End Gravity Plant, where previous recoveries exceeded 95%.
▪
During the year Vertex undertook a refurbishment program of the Gravity Plant. The
Company has subsequently started wet commissioning the plant.
▪
Vertex has prioritised the assessment of open pittable and Underground gold
mineralisation on the Company’s Mining Leases, to provide follow-on feed for the plant.
8
VERTEX MINERALS LIMITED
ABN 68 650 116 153
Directors’ Report (continued)
Figure 1 Location of Stockpiles relative to the Gold plant
9
VERTEX MINERALS LIMITED
ABN 68 650 116 153
Directors’ Report (continued)
Figure 2 Hill End Gravity Gold plant
10
VERTEX MINERALS LIMITED
ABN 68 650 116 153
Directors’ Report (continued)
Drilling Hargraves
▪
Hargraves Hole VHRG 0001 Gold Intercepts
✓ 1m @ 4.58 g/t from 48m
✓ 1m @ 1.06 g/t from 78m
✓ 1m @ 1.51 g/t from 126m
✓ 7m @ 1.72 g/t from 180m including.
✓ 3m @ 3.60 g/t from 180m including.
✓ 1m @ 7.33 g/t from 181m
✓ 8m @ 1.79 g/t from 192m including.
✓ 1m @ 9.29 g/t from 192m
✓ 1.5m @ 1.34 from 203m at the end of hole Open at depth
▪
VHRGD003 had an intersection of 10.8 g/t over a metre from 164m depth.
▪
VHRGD004 had an intersection of 9.1 g/t over a metre from 16m.
▪
Drilling indicates a stacked saddle reef.
▪
Targeting is beneath historic underground workings.
▪
Samples taken at the collar of VHRGD004 in a gossan came back with grades of up to
5.07 g/t.
Vertex was granted EL 9485 over an area that divided the Hargraves Mineral Resource (see
Figure 4) EL 9485 was previously a Mining Licence owned by others. The Regulator had
recently cancelled this lease and it was immediately pegged by Vertex.
Vertex undertook a drilling program over this new area drilling an initial 700m diamond
coring.
The drilling was the Company’s second drill program undertaken at the Hill End Project.
Hargraves presents great potential for significant resource growth. The Company believes
that there is also compelling evidence that the Hargraves deposit is a robust deep plunging
deposit, and the gold inventory will benefit from additional drilling.
The Mineral Resource of the Hargraves Project stands at 177,000 ounces and is detailed in
Table 2.
11
VERTEX MINERALS LIMITED
ABN 68 650 116 153
Directors’ Report (continued)
Table 1 Mineral Resource of the Hargraves Gold project
Category
(0.8 g/t Cut Off)
Tonnes
Indicated
1,108,651
Inferred
1,210,335
Total Resource
2,318,986
Source: PUA ASX Announcement 29 May 2020
Gold Grade
(g/t)
Contained Gold
(oz)
2.7
2.1
2.4
97,233
80,419
177,652
Figure 3 Long section through the Hargraves Resource showing EL9485 in the middle of the resource
Figure 4 Location of the small, but prospective, 1 unit tenement granted to Vertex
12
VERTEX MINERALS LIMITED
ABN 68 650 116 153
Directors’ Report (continued)
Figure 5 Collar locations (yellow dots ) showing the locations of the drilling at Hargraves.
Figure 6 Plunging deeper targets at Hargraves within the newly acquired area.
13
VERTEX MINERALS LIMITED
ABN 68 650 116 153
Directors’ Report (continued)
Drilling Red Hill
▪
A Diamond Rig campaign drilled at Red Hill over the latter part of 2022
▪
Visible gold and grades up to 30g/t over a meter were intercepted.
•
▪
Importantly shallow mineralisation with broad intersections
Significant drill intercepts from the first 8 holes include:
•
VRHD001 12m at 1.01 g/t from 4m
• Including 1m at 8.07 g/t from 15m
•
VRHD002 1m at 2.2 g/t from surface
• 19m at 1.1 from 38m
And 1m at 5.37 from 38m
•
VRHD004 24m at 2.8 g/t from 74m
• Including 16m at 3.78 g/t from 74m
• Including 12m at 4.54 from 78m
• Including 1m at 5.8g.t from 74m
• Including 1 m at 30.8 g/t from 79m
And 2m at 8.42 g/t from 106
And 1 m at 1.91 from 129m
•
VRHD005 5m at 2.97 g/t from 33m down hole.
• Includes 1m at 12.70 g/t from 34m.
• 2m at 3.37 g/t from 67m down hole.
• Includes 1m at 4.50 g/t from 67m.
• 1m at 2.58 g/t from 93m down hole.
•
VRHD006 1m at 2.21 g/t from 3m down hole.
• 1m at 2.74 from 20m down hole.
•
VRHD007 2m at 1.27 g/t from 37m down hole.
•
VRHD008 3m at 1.02 g/t from 14m down hole.
14
VERTEX MINERALS LIMITED
ABN 68 650 116 153
Directors’ Report (continued)
Red Hill Development
▪
Resource, Pit & Mining Schedule optimisation was undertaken internally.
▪
Mining Licence Application (“MLA”) studies well underway & include:
•
Stakeholder engagement
▪
Landowner (the Crown)
▪
Bathurst Regional Council § Community, including
▪
Future employees
•
Total Water Management (incl. >10yrs bore monitoring)
•
Dust monitoring/benchmarking
▪
Red Hill ore is amenable to gravity processing & it is expected that ore could be
trucked and treated through the Hill End Gravity Gold Plant (refer ASX
Announcement 30 November 2015).
▪
Additional resource targets exist along strike, to the north of the existing Red Hill
resource and at depth.
▪
Importantly, the new interpretation of mineralisation has defined a significant target
for future drilling, as the interpreted feeder zone structure and its stacked
stockworks have not been tested.
Following works carried out during the year, the Vertex directors are now satisfied that Red
Hill Gold Project is viable as a stand-alone project, to provide future feed to the Hill End gravity
plant, following underground mining of the high-grade Reward mine.
The project plan includes a first phase of two shallow open pits. The ore will be hauled from
Red Hill to the Hawkins Hill gravity processing plant and infrastructure located at Hill End.
15
VERTEX MINERALS LIMITED
ABN 68 650 116 153
Directors’ Report (continued)
Previous metallurgical test work on oxide, transition and primary material from Red Hill has
confirmed that a high recovery of gold is achievable with simple gravity processing at a coarse
grind and without the use of cyanide. This is similar processing performance to the Hill End
and Hargraves deposits, which only require gravity processing to achieve ~90% recovery of
gold. (Hill End Gold Announcement 30th November 2015) Consequently the processing plant,
power requirements and infrastructure are a very low capital cost and of low environmental
impact. The Company’s existing gravity processing plant located at Hill End is amenable to
expansion to cater for the Red Hill feed.
Successive past drilling campaigns continued to discover new en echelon vein sets at depth
and wide mineralised quartz ‘bedded’ stockwork zones have been intersected in the White’s,
Red Hill and Marshall McMahon areas. There is potential to extend the resource in several
locations immediately adjacent to the resource at depth and along strike. Additional shallow
resource extensions are expected in the Red Hill area, such as at the Western Line of
mineralisation.
Figure 7. Red Hill future targets, note the ‘visible gold’ intersections
shown occur outside the initial resource area.
16
VERTEX MINERALS LIMITED
ABN 68 650 116 153
Directors’ Report (continued)
LIDAR
During the year, Vertex undertook a substantial LIDAR survey which covered the whole of the
Hill End tenement group.
▪
The photographic and LIDAR data was accurate to 10cm over an area of 44km in
length and 4km in width.
▪
The LiDAR survey accurately located all the historic workings over the length of
Hargraves and Hill End tenements. Including workings that were not known to
Vertex.
▪
The LIDAR data also defines in excellent clarity the geological structures of the entire
area. This includes bedding planes, folds (anticlines and synclines), faults and shear
zones.
▪
The LIDAR data is of such quality that the location of silica rich rocks (like quartz) can
be identified protruding from the surrounding ground. This is a function of the
greater resistance of siliceous rocks to weathering.
▪
The LiDAR information combined with information gathered from previous mining
and geological mapping has significantly enhanced Vertex’s data set used to identify
gold bearing targets.
Environmental, Social, and Governance – ESG
Vertex is committed to building legitimate Environmental, Social, and Governance (ESG)
credentials. We have commenced ESG reporting as a tangible first step in our ESG journey.
Vertex greatly value ESG considerations as they enable us to better identify material risks and
growth potential, leading to better-informed decisions and business outcomes. Equally, our
commitment to ESG creates a consistent and measurable approach that helps us contribute
to building a more prosperous and fulfilled society and a more sustainable relationship with
our planet.
Vertex have adopted ESG Go from Socialsuite, a global Software-as-a-Service (SaaS)
enterprise, as a best-in-class solution for small and mid-cap companies to easily start ESG
reporting with a structured, standardised, and globally recognised solution. We find ESG Go
excels in making the WEF framework accessible and operational. We use it to track our
disclosure progress, demonstrate our ESG performance against the WEF ESG framework, and
share our journey of building robust ESG credentials.
17
VERTEX MINERALS LIMITED
ABN 68 650 116 153
Directors’ Report (continued)
Our Hill End Gold project is our flagship project of which we are moving towards production
and it has an excellent environmentally sustainable foundation that will dovetail well with
Socialsuite. Vertex’s will set quarterly ESG actions to report.
Dividends
The Directors resolved that no dividend be paid for the year.
Significant changes in the state of affairs
There have been no changes in the state of the affairs of the Company during the financial
year.
Subsequent events
Following the conclusion of internal studies on the Reward Underground Gold Mine (“Reward
Gold Mine” or “Reward”), the Company announced on 6 July 2023, a Mineral Resource
Upgrade for the Reward Gold Mine at the Company’s Hill End Project. The Company has
engaged Ground Control Engineering (GCE) to undertake the Pre-Feasibility Study (PFS) at the
site. GCE conducted a site visit in July 2023 and the PFS is expected to be completed in quarter
2, 2023.
On 17 July 2023, the Company announced the completion of a non-renounceable rights issue
of shares and free-attaching options. The Company issued a total of 10,463,961 fully paid
ordinary shares and 5,232,057 options exercisable at $0.25 each, with an expiry date of 17
July 2026 to raise $1,046,396 before costs. The underwritten shortfall of 6,219,929 shares will
be issued within 3 months of the rights issue close to raise a further $621,993.
On 4 August 2023, the Company announced the commencement of wet commissioning at the
Hill End Gold Plant.
On 18 August 2023, the Company ultimately issued 6,219,371 fully paid ordinary shares and
3,109,686 options exercisable at $0.25 each, with an expiry date of 17 July 2026 to raise
$621,937 before costs for the underwritten rights issue shortfall (as noted above).
On 29 August 2023, the Company announced an exploration target had been calculated for
the Fosters Gold Project south of the Reward Gold Mine and a diamond drill program will be
undertaken with the aim of converting the target to a JORC resource.
On 4 September 2023, the Company announced the issue of 5,000,000 options exercisable at
$0.25 each with an expiry date of 17 July 2026 to the lead manager of the rights issue.
18
VERTEX MINERALS LIMITED
ABN 68 650 116 153
Directors’ Report (continued)
Other than as noted above, no matter or circumstance has arisen since 30 June 2023 that has
significantly affected, or may significantly affect, the Company’s operations, the results of
those operations, or the Company’s state of affairs in future financial years.
Future developments
Disclosure of information regarding likely developments in the Company’s operations in
future financial years and the expected results of those operations is likely to result in
unreasonable prejudice to the Company. Accordingly, this information has not been disclosed
in this report.
Environmental Regulations
The operations of the Company are subject to State and Federal laws and regulations
concerning the environment. The Board of Directors (Board) monitors performance and
compliance with respect to the Company’s environmental obligations. No significant or
material environmental breaches have been notified by any government agency during the
year ended 30 June 2023.
Shares under option or issued on exercise of options
At the date of this report, the Company has the following interests under option:
Expiry date
25 January 2025
17 July 2026
Exercise price
$0.30
$0.25
Number of options
4,000,000
13,341,743
No ordinary shares have been issued upon the exercise of options during or since the end of
the financial year.
Indemnification of Officers and Auditors
The Company has indemnified, to the extent permitted by law, the Directors and officers of
the Company against any liability incurred by a Director or officer in or arising out of the
conduct of the business of the Company or in or arising out of the discharge of that officer’s
duties. No amount was paid pursuant to these indemnities during the financial year, nor to
the date of this report.
19
VERTEX MINERALS LIMITED
ABN 68 650 116 153
Directors’ Report (continued)
To the extent permitted by law, the Company has agreed to indemnify its auditors, William
Buck Audit (Vic) Pty Ltd, as part of the terms of its audit engagement agreement against claims
by third parties arising from the audit (for an unspecified amount). No payment has been
made to indemnify William Buck Audit (Vic) Pty Ltd during or since the financial year.
Directors’ Meetings
The number of meetings of the Company’s Board and of each Board committee held during
the year ended 30 June 2023, and the number of meeting attended by each director were:
Directors
Roger Jackson
Tully Richards
Declan Franzmann
Board of Directors
Eligible to
attend
Attended
5
5
5
5
5
5
Audit Committee
Eligible to
attend
Attended
1
1
1
1
1
1
Audit and Non-audit Services
The Board is responsible for the maintenance of audit independence. Specifically, the Risk
Charter ensures the independence of the auditor is maintained by:
• limiting the scope and nature of non-audit services that may be provided; and
• requiring that permitted non-audit services must be pre-approved by the Chairman
of the Board.
Details of amounts paid or payable to the auditor during the year are outlined in note 18 to
the financial statements.
Auditor’s Independence Declaration
The auditor’s independence declaration is included on page 30 of the financial statements.
20
VERTEX MINERALS LIMITED
ABN 68 650 116 153
Directors’ Report (continued)
Remuneration Report (Audited)
The remuneration report details the key management personnel remuneration arrangements
for the Company, in accordance with the requireme
Share your feedback
Discover