Amended Announcement Released 16 February 2026
Released
Released
Announcement PDF
1
ASX ANNOUNCEMENT 18TH
FEBRUARY 2026 ASX:VTX
By Electronic Lodgement
AMENDED ANNOUNCEMENT RELEASED 16TH
FEBRUARY 2026
Vertex Minerals Limited (ABN 68 650 116 153) (“Company”) advises that the Company’s
announcement released on 16 February 2026 titled “Operational and Strategic Changes to the
Reward Gold Mine” (“Announcement”) reported on page 1 of the Announcement, that “The
Company is aiming to commission the mine during the September 2026 quarter.”
The Announcement further made references on page 3 to first production in the March 2026
quarter. These references should also be to the September 2026 quarter.
The amended Announcement is attached.
For and on behalf of Vertex Minerals Limited
Roger Jackson
EXECUTIVE CHAIRMAN
This announcement has been approved by the Vertex Executive
Chairman
Further Information:
Roger Jackson, Executive Chairman roger@vertexminerals.com.au
Follow Vertex Minerals on LinkedIn
Vertex Minerals Limited ASX Code: VTX
ABN: 68 650 116 153
1
ASX:VTX ANNOUNCEMENT 16TH
FEBRUARY 2026
OPERATIONAL AND STRATEGIC CHANGES TO
THE REWARD GOLD MINE.
HIGHLIGHTS
• Vertex Minerals has developed major strategic and operational changes at the Reward
Gold Mine under the guidance of the newly appointed Executive Director of
Operations, Jim Simpson.
• Whilst the mine is in a 14-month commissioning phase as per the Pre-Feasibility Study
(“PFS”), which commenced September 2025, gold production from development and other
key metrics has been increasing month on month. The Company is aiming to commission
the mine during the September 2026 quarter.
• Whilst the mine is producing gold and ramping up production, the Company intends to
introduce key changes and initiatives to accelerate the rate of production.
• The plans involve short- and long-term initiatives to move the mine to its nameplate
capacity. (110ktpa as per the PFS.)
• Rehabilitation has been completed in Decline 3, with ongoing work in Declines 2 and
1.
Vertex's Executive Director of Operations, Jim Simpson, commented: "The mine has high
grade and simple metallurgy. The thin veined, high-grade nature of this style of
mineralisation requires specific mining techniques and tight control on dilution. We are
currently reviewing the existing geological model to develop a robust mine plan for the life
of mine. My immediate focus is advancing the mine into commercial production to ensure
we achieve the production targets set out in the PFS. but I am equally focused on the longer-
term expansion opportunities. The mine has incredible potential to scale up from the PFS
and existing plans. The upside is that we have only drilled a small percentage of the historic
Hill End mineralised zone."
2
INITIATIVES TO BE IMPLEMENTED
Increase monthly development to achieve stoping earlier
• Change permitted firing times to end of shift and give 25% more available mining
time
• Reduce development heading widths by 30% to improve development and stope
grades
• Commission additional fleet, including second underground mine truck and
second frontline remote loader
• In the longer term and with the permit now lodged, take mining to 24 hours per
day and 7 days per week (“24/7”) - which would double production
Increase mining grade
• Mine Schedule to focus on grade
• Introduce probe drilling to target high grade shoots
• Target high grade stopes in upper working with airleg mining
Increase Plant running times
• Take daily operational time from 9 hrs to 11 hrs via engineered start up and
shutdown procedures
• Reduce mine dilution through focussed mining techniques
• In the short term, improve maintenance
• In the longer-term, look to permitting longer operational hours in the plant
Improve recoveries
• Further modify the TOMRA sorter screens and feed chutes to increase sorting
accuracy
• Add a third gravity gold concentrator/Knelson
• Engage metallurgical expertise and further scrutinise tailing losses and maximise
recoveries
Improve forward planning
• 35-year experienced mine planner is engaged to work with the Mine Tech team
and optimise the mining development, mine grades, mining techniques, backfill
and production.
• Focus on planning underground mine infrastructure to provide mechanised
access to multiple levels and establish drilling platforms for delineation and
extension of resources.
3
Vertex Minerals Limited (ASX: VTX) (“Company”) is pleased to announce that it has
taken steps to make significant operational changes after guidance by the newly
appointed Operations Director, Jim Simpson. As gold production continues to
increase, and decline rehabilitation work has been completed, the Company will
strategically implement several changes to operations and increase performance
and accelerate the time for getting operations to their capacity.
The emphasis remains on commissioning the mine to achieve stoping, scheduled for
the September 2026 quarter. As per the PFS, this will deliver increases in gold
production to the mill as the underground mining rate pairs with the plant’s
capacity.
The development work taken to get to mining is on track, even though the ground
conditions in the declines and around our stopes were worse than expected. The
workings, that have been underwater for 14 years, when dewatered were found to
be in much poorer condition and needed far more rehabilitation.
Now that the rehabilitation of the mine is nearing completion, the Company expects
to see benefits from the establishment of multiple mining areas, full face
development mining on ore and striving for first production in the September 2026
quarter.
Figure 1 Caption from the PFS1 showing the ramp up of production
1
ASX: VTX announcement dated 3 January 2024 and titled “Reward Gold PFS, Strong Economics and Robust Base for
Growth”
4
FURTHER INITIATIVES
1. Update Resources, Mineable Resources and Reserves
• The geological models are currently being updated to include reinterpretations a
review of grade and tonnage estimation provided by previous consultants.
• The engineers will apply either airleg, cut and fill or benching stoping as mining
methods with modifying mining factors including external dilution, fill dilution and ore
losses. These will be the new ore reserves derived from the indicated resource
categories. The inferred or unclassified resources will be derived as mining inventory
• The mineable resources and ore reserves will be estimated post completion of the
resource estimate.
• Detailed short term and long term mine planning, underground infrastructure design
and Life of Mine schedules can commence when reserve/mining inventory estimations
have been completed.
• The benefits of carrying out updating the resources and reserves are
▪ Can identify and target high grade areas
▪ Recalibrate the existing models
▪ A normal process that is carried out annually with a producing mine.
▪ Provides a schedule of tonnes and grade for better estimation of production to
the plant and in the future and eventually guidance to the market.
▪ Precursor to LOM planning and detailed Budget.
2. Life of Mine (LOM) Plan
• The LOM plan will involve short term and long term mine planning, underground
infrastructure design and LOM schedules within resources, and will provide holistic
planning especially with diamond drilling programs.
• The LOM plan will cover the following
▪ Mapping out the short- and longer-term development plans. (Visually and
numerically)
▪ Stoping sequences including geotechical considerations.
▪ Capital development considerations including vent rises, second means of egress,
waste and ore passes and diamond drilling platforms.
▪ Stoping schedules
▪ Production Schedules
▪ Fill Schedules
▪ Processing outputs eg tailings
▪ Gold output
5
3. Operations
A full operational review is in progress. This includes but not limited to
▪ Increase of development metres
▪ Reducing size of development drives – critical for reducing external dilution and
workload on haulage, processing plant and ore sorter
▪ Ground control review.
▪ Equipment sizing
▪ Increasing number of work areas
▪ Potential 24/7 underground operations compared to the current 10hr/day
operation.
▪ Real time assay data and reconciliation
▪ Future equipment selection for small on lode development and large development
for materials handling and orebody access.
▪ Debottlenecking process plant to increase utilisation, availability, throughput and
gold production.
▪ Focus on mill recoveries targeting 0.3g/t Au tailing in total.
▪ Gravity recoverable gold upgrade with addition of another concentrator and fine
tuning of the ore sorter
▪ Tailings management – placing fill underground consisting of both mill tailing sands
and coarse ore sorter rejects.
Approvals to operate 24/7 operations
▪ Optimising manning levels with technical staff most critical.
Figure 2
6
This announcement has been approved by the Board.
Further Information:
Roger Jackson, Executive Chairman
roger@vertexminerals.com.au
Jim Simpson, Executive Director Operations
jim.simpson@vertexminerals.com.au
Tully Richards, Executive Director Geology
and Exploration
tully@vertexminerals.com.au
Follow Vertex Minerals on LinkedIn
Vertex Minerals Limited
ASX Code: VTX
ABN: 68 650 116 153
7
Vertex Flagship Project
✓ Commenced gold processing in new Gekko gravity gold plant
✓ 100% owned mining operation
✓ No hedge
✓ High grade gold resource and reserve 225 ozs at 16.7g/t + more
✓ Inherited AU$25 million of underground development at Reward
✓ 1.8m Au ozs historic mining
✓ Reward sits just under the historic Hawkins Hill mine - 435kozs at 309 g/t Au
✓ Production has commenced on stockpiles.
✓ Underground development underway
✓ Up to 95% recovery by gravity processes only
✓ Big gold system – 25km + strike
Mineral Resource Estimate (MRE) for the Reward gold deposit at Hill End now stands at 419,000t
at 16.72g/t Au for 225,200oz Au2
:
Classification Cut-off Tonnes Au (g/t) Ounces
Indicated 4 141,000 15.54 70,500
Inferred 4 278,000 17.28 154,700
Total 4 419,000 16.72 225,200
Global Mineral Resource estimate for the Hill End & Hargraves Gold Project
Hill End Project Mineral Resource Estimate
Deposit Classification Tonnes Grade Contained
(kt) Au (g/t) Au (koz)
Reward Gold Mine
Indicated 141 15.5 71
Inferred 278 17.3 155
Sub Total 419 16.7 225
Hargraves Project
Indicated 1,109 2.7 97
Inferred 1,210 2.1 80
Sub Total 2,319 2.4 178
Red Hill Project
Indicated 413 1.4 19
Inferred 1,063 1.8 61
Sub Total 1,476 1.7 80
Project Total
Indicated 1,663 8.9 187
Inferred 2,551 8.6 296
Grand Total 4,214 8.7 482
2
(VTX ASX Announcement 21 June 2023).
8
COMPETENT PERSON’S STATEMENT
The information in this report that relates to Exploration Results and Exploration Targets is based
on information compiled by Mr. Roger Jackson, a Director and Shareholder of the Company, who
is a 25+ year Fellow of the Australasian Institute of Mining and Metallurgy (FAusIMM), Fellow of
the Australian Institute of Geoscientists (FAIG) and a Member of Australian Institute of Company
Directors. Mr Jackson is the Executive Chairman and a full-time employee of Vertex Minerals
Limited (“Company”), and a shareholder of the Company. Mr. Jackson has sufficient experience
which is relevant to the style of mineralisation and type of deposits under consideration and to
the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition
of the “Australasian Code for Reporting of Exploration results, Mineral Resources and Ore
Reserves”. Mr. Jackson consents to the inclusion of the data contained inrelevantresourcereports
used for this announcement as well as the matters, form and context in which the relevant data
appear.
FORWARD LOOKING STATEMENTS AND IMPORTANT NOTICE
This report contains forecasts, projections and forward-looking information. Although the
Company believes that its expectations, estimates and forecast outcomes are based on reasonable
assumptions it can give no assurance that these will be achieved. Expectations and estimates and
projections and information provided by the Company are not a guarantee of future performance
and involve unknown risks and uncertainties, many of which are out of Vertex Minerals’ control.
Actual results and developments will almost certainly differ materially from those expressed or
implied. Vertex Minerals has not audited or investigated the accuracy or completeness of the
information, statements and opinions contained in this announcement. To the maximum extent
permitted by applicable laws, Vertex Minerals makes no representation and can give no assurance,
guarantee or warranty, express or implied, as to, and takes no responsibility and assumes no
liability for the authenticity, validity, accuracy, suitability or completeness of, or any errors in or
omission from, any information, statement or opinion contained in this report and without
prejudice, to the generality of the foregoing, the achievement or accuracy of any forecasts,
projections or other forward looking information contained or referred to in this report. Investors
should make and rely upon their own enquiries before deciding to acquire or deal in the
Company’s securities.
JORC COMPLIANCE STATEMENTS
Where statements in this announcement refer to exploration results which previously been
reported, the Company confirms that it is not aware of any new information or data that materially
affects the information included in the original announcements, and in the case of estimates of
Mineral Resources, that all material assumptions and technical parameters underpinning the
estimates in the relevant market announcements continue to apply and have not materially
changed. The Company confirms that the form and context in which the Competent Persons’
findings are presented have not materially modified from the original market announcements.
Share your feedback