Half Yearly Report and Accounts 31 December 2025
Released
Released
Announcement PDF
ABN 68 650 116 153
INTERIM FINANCIAL REPORT
FOR THE HALF-YEAR ENDED
31 DECEMBER 2025
VERTEX MINERALS LTD
ABN 68 650 116 153
Contents
Page
Corporate directory 1
Directors’ report 2
Auditor’s independence declaration 24
Consolidated statement of profit or loss and other comprehensive
income 25
Consolidated statement of financial position 26
Consolidated statement of changes in equity 27
Consolidated statement of cash flows 28
Notes to the consolidated financial statements 29
Directors’ declaration 50
Independent auditor’s review report 51
VERTEX MINERALS LTD
ABN 68 650 116 153
1
Corporate Directory
Directors
Roger Jackson
Executive Chairman
Tully Richards
Executive Director
Jim Simpson
Executive Director
Company Secretary
Ian Morgan
Principal and Registered Office
6 Bowen Street
HILL END NSW 2850
Telephone: +61 2 7229 4849
Email: info@vertexminerals.com.au
Website: www.vertexminerals.com
Auditors
BDO Australia
Level 25, 252 Pitt Street
Sydney NSW 2000
AUSTRALIA
Bankers
National Australia Bank
Securities Exchange Listing
Australian Securities Exchange
Home Exchange: Perth, Western Australia
Code: VTX
Share Registry
Automic Group
Level 5, 191 St Georges Terrace
Perth WA 6000
Telephone: 1300 288 664
VERTEX MINERALS LTD
ABN 68 650 116 153
Directors’ Report
2
The Directors of Vertex Minerals Limited (“Vertex” or “the Company”) present their report
on the Company and its controlled entities (together, “the Group”) for the half year ended 31
December 2025 (2025 Half-Year).
This report has been prepared in accordance with the requirements of the Corporations Act
2001 and provides an overview of the Group’s operations, results, financial position and other
relevant disclosures for the 2025 Half Year.
Directors
The names and particulars of the Directors of the Company during or since the end of the
half-year period and up to the date of this report are:
Name Position Held
Roger Jackson Executive Chair
Tully Richards Executive Director
Jim Simpson Executive Director (appointed 3 February 2026)
Non-Executive Director (appointed 19 December 2025,
ceased as Non-Executive Director 3 February 2026)
Declan Franzmann Non-Executive Director (retired 19 December 2025)
Sean Richardson Non-Executive Director (resigned 2 July 2025)
Company Secretary
Mr Ian Morgan was appointed as Company Secretary on 23 May 2025 and continues in office
as at the date of this report.
Principal Activities and Significant Change in the Nature of Activities
The principal activities of the Group during the 2025 Half Year were the exploration,
development and advancement of its gold mining projects in New South Wales and early-
stage exploration assets in Western Australia.
The Group’s focus for the 2025 Half Year was the development of the Hill End Gold Project,
including the underground Reward Gold Mine.
There were no significant changes in the nature of the Group’s principal activities during the
2025 Half Year.
VERTEX MINERALS LTD
ABN 68 650 116 153
Directors’ Report (continued)
3
Review of Results and Operations
The consolidated loss of the Group for the 2025 Half Year after providing for income tax
amounted to $6,187,162 (2024 Half-Year loss of $1,289,519).
Objectives
The Group’s objective is to increase shareholder wealth through successful exploration
activities and mining activities whilst providing a safe workplace and ensuring best practice in
relation to its environmental obligations.
Mineral Resources Operations Summary
Vertex holds a portfolio of high-grade gold projects in New South Wales and Western
Australia, anchored by the flagship Hill End Gold Project. Together with the nearby Hargraves
Gold Project and the recently acquired Dun Dun exploration licence, these assets form a
district-scale position within the highly prospective Hill End - Hargraves corridor, which has
historically produced more than four million ounces of gold.
The Group’s priority during the 2025 Half Year was advancing Hill End from development into
production. This work culminated in the achievement of first gold in August 2025. Hargraves
provides additional exploration potential and the opportunity to establish a long-term
satellite ore source, complementing production at Hill End and supporting the Group’s vision
of building a sustainable gold hub in the district.
Image 1: Vertex Minerals Key Projects
VERTEX MINERALS LTD
ABN 68 650 116 153
Directors’ Report (continued)
4
During the 2025 Half Year, the following developments were made in the Group’s mining and
exploration projects:
Hill End Gold Project
Background
The Hill End Gold Project is located in the Central Tablelands of New South Wales,
approximately 50 kilometres south of Mudgee, within the highly prospective Eastern Lachlan
Fold Belt. Vertex holds 155 km² of tenure across five exploration licences, one gold lease (GL
5846) and ten mining leases (ML 49, 50, 315, 316, 317, 913, 914, 915, 1116 and 1541).
The district has a rich gold mining history, with more than four million ounces historically
produced. Vertex’s ground position spans the Hill End corridor and includes several historic
high-grade mines. The cornerstone of the Group’s development strategy is the Reward Gold
Mine, a high-grade underground deposit accessed via the existing 640 Level portal.
Image 2: Map of the Hill End Project Area
VERTEX MINERALS LTD
ABN 68 650 116 153
Directors’ Report (continued)
5
Work Undertaken
Transition to mechanised mining
Underground mining recommenced at the Reward Gold Mine in early August 2025, following
completion of mine re-entry, rehabilitation and infrastructure works undertaken prior to the
2025 Half Year.
Underground Infrastructure and Rehabilitation
A major achievement during the 2025 Half Year was the completion and commissioning of
key underground infrastructure necessary for safe and scalable mechanised mining.
Between August 2025 and October 2025, the following infrastructure was commissioned:
• energisation of the 11 kV underground power network (August 2025);
• commissioning of the 110 kW primary ventilation fan (by 21 August 2025);
• completion of mine-wide radio communications (September 2025);
• Aramine 350D loader fitted with tele-remote capability was delivered to site, enabling
safe longhole extraction beneath open stopes (October 2025); and
• extension of water and compressed air reticulation throughout the decline system
(September to October 2025)
Rehabilitation works also continued across Declines 1, 2 and 3 during the 2025 Half Year,
particularly within the historically flooded sections of the mine and areas requiring additional
ground support. In Decline 3, backs were progressively increased during the 2025 Half Year
to approximately four metres in preparation for planned flat-back stoping, with
approximately 22 metres of rehabilitation remaining at the end of December 2025 prior to
commencement of that stoping method.
Development of initial stoping areas and expansion of mining fronts
Initial ore was sourced from development headings and early stoping areas on the Mica 1 and
Mica 2 vein systems during August 2025. Ore was progressively hauled to surface and
processed through the Group’s gravity-only plant. This initial phase provided confirmation of
ground conditions, structural continuity of the vein systems and metallurgical response under
operating conditions.
VERTEX MINERALS LTD
ABN 68 650 116 153
Directors’ Report (continued)
6
By September 2025, the Group had established multiple underground mining fronts across
approximately 400 metres of strike along the Star of Peace Vein and adjoining Mica vein
systems. This expansion marked the progression from initial restart mining in August 2025 to
a broader production system that could be capable of supporting a steady-state underground
extraction and plant feed operation. The process of rehabilitation and development of
sublevels which is depicted in the image below is part of the initial development and re-
commissioning of the mine. With the start date of September 2025, the anticipated
timeframe for completion is approximately 12 months.
Image 3: Longitudinal section of the Reward underground workings showing the “Star of
Peace” Reef vein system, showing active production areas (1670, 1438, and 1720 stopes).
Image 4: Longitudinal section of the Reward underground workings showing the “Star of
Peace” Reef vein system, showing the decline rehabilitation required for stope production
(rehabilitation area in yellow, stopes in red and air leg stopes in pink).
VERTEX MINERALS LTD
ABN 68 650 116 153
Directors’ Report (continued)
7
Image 5: “Star of Peace” Reef being charged up and house down the ore, post blasting
Image 6: Truck being loaded with ore and hauled to processing plant from the Lady Belmore Reef
vein
VERTEX MINERALS LTD
ABN 68 650 116 153
Directors’ Report (continued)
8
Additional development focused on establishing the first airleg stoping fronts while
continuing rehabilitation in historically mined areas.
These new fronts included the following:
• 1670 Airleg stope (Mica 1 Reef)
Stoping commenced in the 1670 airleg stope during August 2025 and represented the first
sustained stoping front for the Reward operation. Approximately 125 tonnes had been mined
over a short production campaign, providing early confirmation of vein continuity and ground
conditions in the central section of the Mica Reef.
Image 7: High grade veins in the back of the 1670 Shrink Stope
VERTEX MINERALS LTD
ABN 68 650 116 153
Directors’ Report (continued)
9
• Trial 1438 longhole stope (Mica vein system)
Drilling of the 1438 longhole stope targeting the Mica 1 and Mica 2 veins commenced on 23
September 2025. This stope formed part of the initial mechanised longhole stoping sequence
within the Mica vein system during the 2025 Half Year and increase stoping tonnage relative
to development ore as the underground operation progressed beyond restart mining.
Drilling was completed in late September 2025, with broken ore being available for processing
within the stope during October 2025 and November 2025. Extraction of broken ore from the
1438 North stope commenced in December 2025 once the Group’s tele-remote systems
became operational.
• 1720 cut-and-fill stopes and Amalgamated Vein development
Preparatory works at the 1720 cut-and-fill stopes were undertaken in September 2025, which
included ground works and installation of additional ground support ahead of planned jumbo
access of ore production. This was completed by October 2025.
Image 8: Oblique view of 1438 Longhole Stope
Processing Plant Operations and Optimisation
The Group’s gravity-only processing plant operated on underground ore from August 2025.
Initial ore was processed in August 2025 and September 2025, with the feed comprising of a
blend of development and early stoping material. Subsequent optimisation works were
VERTEX MINERALS LTD
ABN 68 650 116 153
Directors’ Report (continued)
10
carried out during this time which resulted in the installation of a DSM screen (to improve
efficiency), refurbishment of Gemini table gearboxes and improvements to process-water
circulation.
In November 2025, a planned shutdown was undertaken by the Group to implement targeted
modifications to improve performance on the underground ore. These works included screen
sizing adjustments to optimise feed presentation to the TOMRA ore sorter and modifications
to improve compatibility with the VSI crusher, which will reduce recirculating loads and
improving circuit stability.
During the 2025 Half Year, total ore mined amounted to 7,404 tonnes, comprising:
• 6,288 tonnes of development ore; and
• 1,116 tonnes of stoping ore.
Total ore processed during December 2025 was 12,662 tonnes. Gold recovered during
December 2025 totalled 200 ounces, with 195 ounces sold at an average realised gold price
of approximately A$5,988 per ounce.
Tele-Remote Commissioning and Higher-Grade Stoping
Tele-remote equipment delivered on 24 October 2025 underwent software integration and
communications configuration during November 2025. Tele-remote capability became
operational at the Reward Mine in early December 2025, enabling remote bogging beneath
open stopes at the project.
Safety, environmental and community
Across the 2025 Half Year, the Group continued to operate under an owner-operator model
supplemented by specialist underground and processing contractors, supporting flexible
resourcing during ramp-up.
Safety
The Company reported no lost time injuries or reportable incidents during the 2025 Half Year.
Safety systems were strengthened during the 2025 Half Year through commissioning and use
of the INX Safety Management System for incident reporting, hazard tracking and training
compliance. The Group re-entered the Reward Mine after 14 years since last operating mining
was highly focussed on rehabilitating the mine to world best practice. This included fully
meshing and bolting the access drives and declines. The mine ground is regarded as good, but
the Group maintains a policy of actively monitoring ground conditions.
VERTEX MINERALS LTD
ABN 68 650 116 153
Directors’ Report (continued)
11
Environmental and Sustainable Mining Objectives
• Gravity Recoverable Gold
• Low Capex and Low Operating cost
• Minimal grind 200 to 650 microns
• Benign tails – potential commercial sand
• Benign waste
• Low water usage
• Re usable water
• No chemicals – no cyanide
• 23 fine gold
• Minimum tails (sand) compared to production
• No tails (sand) dam required - dry stack
From an environmental perspective, the gravity-only processing circuit and high water-
recycling efficiency remained core features of the operating approach during the 2025 Half
Year. Environmental monitoring (water, dust, noise) continued in line with existing
management plans, and the Group continued engagement with the local Hill End community
and regional suppliers as part of its operating footprint.
Community
• The Reward Mine employs a good percentage of the local Hill End community
• The Group holds regular community consultation events
• An open day is held yearly which lets locals visit the plant and take a trip underground
• The Group supports local (Hill End):
• The School
• Bush Fire Brigade
• Arts Group
• the Common trust
• Residents’ individual pursuits
• Businesses and contractors
• National Parks
• Landholders,
• Infrastructure and communications
• History groups,
• Museums
• Cultural heritage
• Social functions, and more.
VERTEX MINERALS LTD
ABN 68 650 116 153
Directors’ Report (continued)
12
Hargraves Gold Project (NSW)
Background
The Hargraves Project is located approximately 35 kilometres north of Hill End in the Central
Tablelands of New South Wales, within the highly prospective Eastern Lachlan Fold Belt. The
project comprises two granted exploration licences (EL 6996 and EL 9485) covering the
historical Hargraves Goldfield. The area has a rich mining history, with more than 1.4 million
ounces of gold historically produced from reef and alluvial workings.
Hargraves hosts a JORC-compliant Mineral Resource of 2.3 million tonnes at 2.4 g/t Au for
178,000 ounces.1 Its proximity to Hill End positions Hargraves as a logical potential satellite
ore source, supporting the Group’s strategy of developing Hill End as a centralised processing
hub.
Work Undertaken
No material field activity was undertaken by the Group during the 2025 Half Year at
Hargraves, as the Group’s operational focus remained on underground mine restart,
development and ramp-up at Reward.
Taylor Rock Project
Background
The Taylor Rock Project (E63/2058) lies on the southeastern margin of the Lake Johnston
Greenstone Belt in Western Australia, approximately 190 km southwest of Kalgoorlie. The
geological setting is highly prospective, with historic drilling identifying pegmatite swarms
that may host lithium-bearing spodumene, as well as nickel sulphide potential from past
exploration campaigns by Norilsk Nickel.
1
Refer VTX ASX Announcement 21 June 2023.
VERTEX MINERALS LTD
ABN 68 650 116 153
Directors’ Report (continued)
13
Image 9: Map of the Taylor Rock Project
Work Undertaken
No work was completed during the 2025 Half Year at the Taylor Rock Project.
Pride of Elvire Project
Background
The Pride of Elvire Project (E77/2651, ~51 km²) is in the Mt. Elvire greenstone belt in Western
Australia, approximately 210 km north of Southern Cross. The project area is historically
known for small-scale gold mining, and previous explorers have undertaken stream, soil and
rock chip sampling, as well as RAB and RC drilling.
VERTEX MINERALS LTD
ABN 68 650 116 153
Directors’ Report (continued)
14
Image 10: Map of the Pride of Elvire Project
Work Undertaken
No work was completed during the 2025 Half Year at the Pride of Elvire Project.
Tenement Acquisition
Dun Dun Exploration Licence Application (ELA 6978)
In December 2025, Vertex lodged an application for a new exploration licence, ELA 6978 (Dun
Dun).
The Dun Dun tenement is located between the Group’s Reward and Hargraves project areas.
Granting of the licence was approved subsequent to the 2025 Half Year (February 2026) and
forms a strategic addition to the Group’s landholding - as it consolidates the Group’s tenure
position along a continuous strike length of the Hill End gold system.
VERTEX MINERALS LTD
ABN 68 650 116 153
Directors’ Report (continued)
15
The Dun Dun area hosts historical gold workings, including the Dun Dun and Longmore-
Reward vein systems, which are geologically analogous to the laminated quartz vein
mineralisation observed at Reward. Historical mining records indicate that these structures
were worked to relatively shallow depths, consistent with other historically productive areas
within the Hill End Goldfield.
The Group intends to incorporate the tenement into its broader Hill End exploration strategy,
including geological mapping, surface sampling and prioritisation for future exploration
activities.
Image 11: Map of ELA 6978 “Dun Dun”
Financial Results
Revenue
During the six months ended 31 December 2025, the Group derived revenue from gold sales
produced at the Reward Gold Mine and from interest earned on short-term interest-bearing
deposits.
Gold sales during December 2025 totalled 195 ounces at an average realised gold price of
approximately A$5,988 per ounce. Additional gold concentrate was produced during the 2025
Half Year and held on hand at 31 December 2025, pending delivery.
VERTEX MINERALS LTD
ABN 68 650 116 153
Directors’ Report (continued)
16
Net expenses and impairment
The following points are noted in relation to expenses for the 2025 Half Year:
> ongoing administration expenses increased from $432,156 (2024 Half Year) to
$749,455 (2025 Half Year). Included in the 2025 Half Year results were fees paid to
directors, the company secretary, ongoing costs associated with the compliance,
listing obligations and travel costs of the Group;
> depreciation on the Group’s plant, motor vehicles and equipment of $831,175 (2024
Half Year $60,754); and
> loss on the disposal of equipment of $479,404 (2024 Half Year: nil).
It is noted that the above losses were partially offset by the revenues noted above.
The Directors have considered whether any impairment of the Group’s tenements is required
for the 2025 Half-Year. The Directors have concluded that no impairment adjustment is
required, noting that ongoing exploration activities have been undertaken across the Group’s
project portfolio. Further information in relation to the impairment assessment is provided in
Note 7(d).
Statement of financial position
As at 31 December 2025, the Group’s net asset position was:
> Net assets $25,772,094 (30 June 2025 $15,499,788), including property plant and
equipment $24,852,986 (30 June 2025 $18,059,016)
> Cash $1,497,999 (30 June 2025 $1,724,446)
Receipts of funds by the Group were, in part, offset by the costs associated with
Group’s ongoing production exploration commitments incurred at the Reward Gold
Mine. Further reasons for the decrease in cash are provided below under the
heading Cash Flows.
> Negative working capital $7,113,377 (30 June 2025 $9,660,562)
Decrease in negative working capital was primarily due to decrease in current
liabilities to $9,229,970 (30 June 2025: $12,341,363), including:
• trade and other payables decreased to $1,888,587 (30 June 2025:
$3,310,247); and
• current borrowings decreased to $5,098,758 (30 June 2025 $8,589,815)
Cash Flows
The cash flow for the 2025 Half-Year of the Group included:
> an increase in payments for property, plant and equipment costs from $4,729,968
(2024 Half Year) to $7,048,251 (2025 Half Year). The increase during the 2025 Half-
VERTEX MINERALS LTD
ABN 68 650 116 153
Directors’ Report (continued)
17
Year primarily reflects expanded activity at the Reward Gold Mine, including
underground development, stope establishment, rehabilitation works, and
infrastructure upgrades undertaken as part of the ongoing commissioning and ramp-
up phase;
> proceeds from the sale of plant and equipment of $1,047,749 (2024 Half Year: nil),
which was subsequently leased back to the Company under a sale and leaseback
arrangement; and
> an increase in administrative costs from $1,274,481 (2024 Half Year) to $3,311,106
(2025 Half Year). The 2025 Half Year administrative costs were largely comprised of
payments for statutory costs incurred in relation to the compliance and listing
requirements of the Group.
Corporate
Directors
> Resignation of Sean Richardson
On 2 July 2025, Mr Sean Richardson resigned as a Non-Executive Director of the Company.
> Appointment of Jim Simpson and Resignation of Declan Franzmann
On 19 December 2025, Mr Jim Simpson was appointed as a Director of Vertex Minerals
Limited. Mr Simpson brings experience in underground mining operations and mine
development. On the same date, Mr Declan Franzmann retired from the Board.
Share Issue
> Placement - July 2025 to September 2025
During the six months ended 31 December 2025, the Company progressed its previously
announced A$11 million capital raising program to support underground development, plant
optimisation and production ramp-up at the Reward Gold Mine.
Placement tranches were completed in August 2025 and September 2025, with proceeds
strengthening the Company’s balance sheet as underground production recommenced and
development activities expanded.
VERTEX MINERALS LTD
ABN 68 650 116 153
Directors’ Report (continued)
18
> Issue of Securities - October 2025
On 16 October 2025, the Company issued:
• 2,506,313 listed options (VTXOA) to participants in the June 2025 Share Purchase Plan;
and
• 25,591,048 ordinary fully paid shares and 37,090,224 listed options (VTXOA) in
connection with the placement and conversion of loan securities associated with the
July 2025 funding package.
> Issue Conversion of Options
On 27 October 2025, 203,548 VTXO options and 118,348 VTXOA options were exercised,
resulting in the issue of 321,896 ordinary fully paid shares and receipt of additional funds.
> Loan Facility – December 2025
On 24 December 2025, the Company announced execution of additional loan facilities
totalling $4.5 million to support underground development, production ramp-up and working
capital requirements.
At 31 December 2025, $1.2 million of this facility remained undrawn.
Events Subsequent to Balance Date
Since balance date, the following matters have arisen:
• on 17 February 2026, the Company announced that it had been awarded Exploration
Licence 9868 (Dun Dun) within the Hill End Project area in New South Wales. The
licence extends the Group’s tenure along the Hill End–Hargraves gold corridor and
includes historical quartz vein systems analogous to those being mined at the Reward
Gold Mine. The grant of the Dun Dun licence expands the Group’s strategic
landholding contiguous with its existing projects and provides additional exploration
potential within the broader Hill End mineralised system.
• on 16 February 2026, the Company announced a series of operational and strategic
initiatives aimed at improving development rates and advancing the production ramp-
up at the Reward Gold Mine. The update outlined progress in rehabilitation works
within Decline 3 and continued rehabilitation within Declines 1 and 2 to unlock
additional stoping panels. The Company also outlined Jim Simpson’s appointment as
an executive director of operations.
VERTEX MINERALS LTD
ABN 68 650 116 153
Directors’ Report (continued)
19
• during January 2026 and February 2026, the Company reported continued
underground production at the Reward Gold Mine, including extraction from higher-
grade longhole stoping panels within the Lady Belmore Reef and Mica vein systems.
Ongoing development activities and the integration of additional tele-remote mining
capability were reported as supporting improved access to stoping areas and
increased operational flexibility. These activities represent a continuation of the ramp-
up strategy that was underway at the project by 31 December 2025;
• on 11 March 2026, the Company renegotiated its existing $3.0 million loan facility
(December 2025) with RBTN Investments Pty Ltd, extending the term to 10 months
with fixed interest of $360,000 (approximately 14.4% per annum) payable at maturity.
Subject to shareholder approval, interest and fees incurred under the facility may be
satisfied through the issue of up to 7,000,000 unlisted options, in cash, or a
combination of both.
Additionally, on 11 March 2026 the Company entered into a $1.5 million loan facility
with Richsham Nominees Pty Ltd for a 10-month term, carrying fixed interest of
$180,000 (approximately 14.4% per annum) payable at maturity. Subject to
shareholder approval, interest and fees may be satisfied through the issue of up to
3,500,000 unlisted options or cash.
Apart from the above, no matters or circumstances have arisen since the end of the financial
year which significantly affected or could significantly affect the operations of the Group, the
results of those operations or the state of affairs of the Group in future financial years.
Annual Report of Mineral Resources and Exploration Results
The Statement of Mineral Resources and Exploration Results presented in this Report has
been prepared in accordance with the Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves 2012 Edition (the JORC Code 2012). Vertex is not aware
of any new information or data that materially affects the information included in this Report
and confirms that all the material assumptions and technical parameters underpinning the
Mineral Resource estimates and Exploration Results in the relevant market announcement(s)
continue to apply and have not materially changed.
Mineral Resources and Ore Reserves - Corporate Governance Statement
Set out below is the following in relation to the Company’s Mineral Resources and Ore
Reserves:
VERTEX MINERALS LTD
ABN 68 650 116 153
Directors’ Report (continued)
20
Hill End and Hargraves And Red Hill Mineral Resource Estimates
The following tables show the Mineral Resource estimates of the Hill End and Hargraves
projects in accordance with the JORC Code (2012) as at 31 December 2025. The Company
confirms that it is not aware of any new information or data that materially affects the
information included in the Mineral Resource estimates announced on 21 June 2023.
Hill End and Hargreaves and Red Hill Project Mineral Resource Estimate 1,2, 3
Deposit Classification Cut-Off Tonnes (,000) Au (g/t) Ounces
Reward Indicated 3.0 141 15.5 71,000
Inferred 3.0 278 17.3 155,000
Hargraves Indicated 1.0 1,109 2.7 97,000
Inferred 1.0 110 2.1 80,000
Red Hill Indicated 1.0 413 1.4 19,000
Inferred 1.0 1,063 1.8 61,000
Total 4,214 3.6 483,000
Table 1. Hill End and Hargreaves and Red Hill Project Mineral Resource Estimates
Notes to Table 1
1. 1
Figures have been appropriately rounded.
2. 2
The Reward Mineral Resource is reported at a cut-off grade of 3.0 g/t Au. The Hargraves and Red Hill
Mineral Resources are reported at a cut-off grade of 1.0 g/t Au.
3. Refer VTX ASX Announcement 21 June 2023
Summary of the results of the annual review of Mineral Resource and Ore Reserves
As at 31 December 2025, the Group holds Ore Reserves and Mineral Resources within the Hill
End Gold Project tenements, including the Reward and Hargraves deposits. During the 2025
Half Year, the Company reviewed its Mineral Resource and Ore Reserve estimates. No
changes were made to the Mineral Resource estimates, which remain current. Following
completion of the Updated Pre-Feasibility Study announced on 26 February 2024, the
Company declared its maiden Ore Reserve at Reward, which also remains current at 31
December 2025.
Ore Reserves
• Reward Deposit: Probable Ore Reserve of 130,722 tonnes at 9.74 g/t Au for 40,936
ounces of gold.
Mineral Resources
• Reward Gold Mine: 419,000 tonnes at 16.7 g/t Au for 225,000 ounces (71,000 ounces
Indicated and 155,000 ounces Inferred).
• Combined Hill End and Hargraves: 4.2 million tonnes at 3.6 g/t Au for 483,000 ounces.
VERTEX MINERALS LTD
ABN 68 650 116 153
Directors’ Report (continued)
21
Comparison of Mineral Resources and Ore Reserves holdings against that from the previous
year
No new Exploration Results or Exploration Targets were reported during the 2025 Half Year.
The Ore Reserve estimate at Reward and the Mineral Resource estimates at Reward,
Hargraves and Red Hill remain unchanged from those reported by the Company on 26
February 2024. The Company confirms that all material assumptions and technical
parameters underpinning those estimates continue to apply and have not materially changed.
A summary of the JORC Table 1 information for these estimates is included in the original
announcement.
Basis of mineral resources and exploration results and competent person sign-off
The information in this report that relates to Mineral Resources is based on information
compiled or reviewed by the Competent Persons named in the original announcement of 21
Jun
Share your feedback
Discover