QUARTERLY ACTIVITIES REPORT
FOR THE PERIOD ENDED 31 MARCH 2024
HIGHLIGHTS FOR QUARTER
•
•
•
Updated PFS published for the high-grade Reward Gold Mine
Purchase of the Morningstar Gravity Gold Plant
Partially underwritten entitlements issue to raise approximately $3.68 million.
PFS HIGHLIGHTS: at AUD $3000 /oz
Project Life
2 years
of minerals processing activities
Gold Production
49,890 ounces
Gross Revenue
$150 million
Capital Expenditure
$17 million
Pre-production
AISC
$1,833 per ounce
Total Employment
70
Full time employees
Free Cashflow
$41 million
pre tax
NPV at 7%
$33.3 million
pre tax
IRR
110%
pre tax
All dollars are Australian Dollars ($) unless stated otherwise.
Key Parameters
•
Life of mine pre-tax cash of $41 million at $3,000/oz gold price.
•
6-month payback from commencement of gold production
•
Average monthly gold production of 2,169 oz over 23 months with 92% gold recovery.
•
26,000 oz of gold produced per year on an annualised basis.
•
Mine design based on mechanised mining methods. Long hole open stoping with
remotely operated loaders was selected as the primary stoping method.
•
Planned processing of 181kt of material at a head grade of 9.3 g/t for 49,890 ounces of
gold recovered.
•
$17m of capital required prior to production. Savings achieved in purchase of Morning
Star Plant and through deferment of discretionary expenditures where possible.
Vertex Minerals Ltd Quarterly Activities Report – March 2024
•
Owner operator with a focus on grade not tonnes.
•
Only 2 operators required to run the plant on any shift.
Maiden Ore Reserve
•
Probable Ore Reserve of 130kt at 9.7 g/t Au, containing 40,900 ounces of gold.
•
Reserve represents 75% of LOM metal production.
Mineral Resource
•
Production schedules and financial estimates are based on Indicated Mineral
Resources (~75% of Au) and Inferred Mineral Resources (~25% of Au).
•
Combined Mineral Resource Estimate (MRE) for the Reward gold deposit at Hill End
stands at 419,000 tonnes at 16.72g/t Au for 225,200oz Au (VTX Announcement 21 June
2023)
Table 1 – Reward Resource Estimate
Classification
Cut-off
Tonnes
Au (g/t)
Ounces
Indicated
4
141,000
15.54
70,500
Inferred
4
278,000
17.28
154,700
Total
4
419,000
16.72
225,200
•
The best platforms for further exploration drilling are from the underground mine due
to the rugged terrain of the area (see Figure 1). The proposed development provides
access to explore down dip and along strike.
•
Mine development provides the best opportunity to efficiently diamond drill, to add to
the resource base (size and confidence category), and potentially extend life of mine.
(refer Table 3)
Mineral Processing
The major changes between the new build PFS plant and the re-engineered acquired plant
are listed below:
• Flowsheet changes,
ü 3 stage crushing instead of 2 stages.
ü Slightly lower nominal throughput rate
ü Smaller but multiple Gold Centrifuges
ü Smaller regrind Mill (ML1500 instead of ML3000)
ü InLine Pressure Jig instead of Spirals
•
•
Water and Power Demand changes
ü Raw Water demand dropped to 10 m3/h from 35 m3/h
ü Installed power has reduced from 688 kW to 365 kW.
CAPEX changes
Page 2 of 18
Vertex Minerals Ltd Quarterly Activities Report – March 2024
•
•
•
ü Lower Capex
ü Refurbishment and re-use of various fixed plant from both the Reward
and Morningstar Plants
OPEX Changes
ü Power consumption and maintenance requirements have been changed to
suit the new flowsheet and throughput.
Reduced Build Time
Gold recovery of 92% achieved using gravity separation techniques. No
requirement for the use of cyanide or other chemicals.
Cautionary Statement
•
The production target and forecast financial information referred to in this announcement comprise Indicated Mineral Resources
(~75%) and Inferred Mineral Resources (~25%). There is a lower level of geological confidence associated with the Inferred Mineral
Resource and there is no certainty that further exploration work will result in an upgrade to an Indicated Mineral Resource or that
the production target will be achieved.
•
The study documented in this announcement is considered to have a +/-25% PFS level of accuracy.
•
The Pre- Feasibility Study referred to in this announcement is based on a JORC Mineral resources Estimate (Refer ASX Release:
Vertex Reward Gold Resource Upgrade estimate 21 June 2023) the Ore Reserves and Mineral resource estimate underpinning the
PFS have been prepared by Competent Persons in accordance with the 2012 JORC Code.
•
The Company advises that the Probable Ore Reserve provides 76% of the total milled tonnage and 75% of the total contained gold
metal. The production target referred to is based on Mineral Resource estimates which are classified as Indicated (76.6%) and
Inferred (23.4%)
•
The Pre-Feasibility Study is based on the material assumptions outlined below. These include assumptions about the availability
of funding. While Vertex considers all of the material assumptions to be based on reasonable grounds, there is no certainty that
they will prove to be correct or that the range of outcomes indicated by the Pre-Feasibility Study will be achieved. To achieve the
range of outcomes indicated in the Pre-feasibility Study, funding in the order of $22 million will likely be required. Investors should
note that there is no certainty that Vertex will be able to raise that amount of funding when needed. It is also possible that such
funding may only be available on terms that may be dilutive to or otherwise affect the value of Vertex’s existing shares. Given the
uncertainties involved, investors should not make any investment decisions based solely on the results of the Pre-Feasibility Study.
Page 3 of 18
Vertex Minerals Ltd Quarterly Activities Report – March 2024
PURCHASE OF GEKKO GRAVITY GOLD PLANT:
•
Vertex acquired the Gekko Gravity Gold plant located at the Morningstar Gold Mine
Victoria.
•
Vertex will replace the existing 30ktpa gravity plant with the purchase of a Gekko
gravity concentration processing plant with potential to process up to 20 tph with
some minor additions.
•
The Gekko plant is ideally suited to the free milling high grade Reward gold ore
which has a unique high level of gravity gold concentration.
•
The acquisition moves the planned gold bar production forward 6 months.
•
The acquisition for the whole plant which is designed to be unbolted and reinstated
for AUD $620,000 plus GST
•
Vertex can confirm the average feed grade to the trial processing of the stockpiles
at the Hill End Gravity gold plant was 2 g/t. The processing was suspended before
Christmas with the view that the stockpiles will have a greater economic outcome
when processed through a higher throughput plant. The stockpiles will provide the
first feed to the new plant prior to the high-grade feed from Reward coming online.
The plant was only run on limited days.
•
Planned plant throughput of 110 ktpa is optimised to match underground
production schedule.
•
Capital expenditure to procure, refurbish, transport and re-build the processing
plant of $3.6 million.
Benefits of the new plant include.
• New plant will be able to treat up 120ktpa – existing plant 30ktpa
• Fully Automated
• Only requires 2 operators- thus much lower operating costs.
• Full monitoring, including density, flows, mass and sampling.
• Rigid gold security
• Can be monitored remotely.
• Gekko Systems backed.
• Full spare parts support
• Ergonomic design
• State of the Art safety systems
• Lower power usage
• Circa $5m saving on a new build.
• Moves gold production forward 6 months compared to the new build in the PFS
• Provides the opportunity to process stockpiles economically while we develop the
underground.
Page 4 of 18
Vertex Minerals Ltd Quarterly Activities Report – March 2024
Gekko are world leaders in the manufacture of gold processing plants and machinery with
their plants boasting small footprints and low environmental impact. An added attraction to
Vertex is that the Australian-made Gekko plant is modular, providing for scalability and ease
of modification.
RIGHTS ISSUE:
•
On 19 March 2024, Vertex announced that the Company is undertaking an
underwritten non-renounceable entitlements issue (Entitlement Offer) to raise
approximately $3.68 million.
•
As announced - $0.7 million of acceptances under the Entitlement Offer had already
been committed by substantial shareholders in the form of convertible short-term
loan funding, with a further $1.80 million being fully underwritten by CPS Capital.
•
Funds raised from the Entitlement Offer will primarily be used to fund the
mobilisation, refurbishment, and installation of the recently purchased Gekko
Gravity gold plant and advance steps to production of gold from the Reward highgrade underground gold mine.
•
Under the Entitlement offer, three (3) shares will be offered for every five (5) shares
owned on the record date at a cost of $0.08 per share (“Rights Issue”). One (1) free
attaching option (Attaching Option) will be issued for every 3 shares subscribed for.
The Attaching Options will have an exercise price of 15c per share and an expiry of
17 July 2027.
•
The Entitlement Offer closes at 5pm (WST) on 1 May 2024.
•
Shareholders with queries regarding their holdings, eligibility for the Offer and
receipt of their Offer acceptance documentation (including requests to receive
documents electronically) are encouraged in the first instance to contact the
Company’s share registry service provider, Automic Group by telephone on 1300
288 664 (within Australia) or +61 (0) 2 9698 5414 (International) or by email at
hello@automicgroup.com.au.
•
For any queries regarding the Company and the Offers, please contact Harley
McKinnirey Head of Investor Relations at Vested Equities on 07 55 555 015.
Page 5 of 18
Vertex Minerals Ltd Quarterly Activities Report – March 2024
The Reward gold mine is well placed for a simple start–up:
•
The new processing plant will be constructed adjacent to the underground mine portal
(640 Level) and the Company plans to increase throughput up to 110 ktpa.
•
The 640 Level extends into the resource and stripping and refurbishment of this
development is required.
•
Second egress in place with existing ladder way from 640 Level to surface.
•
Some underground fleet and utility services are already owned by Vertex.
•
Mining Licence and DA in place for the processing plant, stockpile processing and the
underground mining.
Permitted residue storage has the capacity for the commencement of operations.
•
•
The New plant will be utilising the existing services and infrastructure:
ü Gold Room
ü Water systems
ü Power generation
ü Offices
ü Change Rooms
ü Workshop
ü Storeroom
ü Crib Room
ü Jaw Crusher
ü Access Roads
ü Security System
Table 2: Global Mineral Resource estimate for the Hill End & Hargraves Gold Project
Deposit
Hill End Project Mineral Resource Estimate
Classification
Tonnes
Grade
(kt)
Au (g/t)
Contained
Au (koz)
Indicated
141
15.5
71
Inferred
278
17.3
155
419
16.7
225
Indicated
1,109
2.7
97
Inferred
1,210
2.1
80
2,319
2.4
178
Indicated
413
1.4
19
Inferred
1,063
1.8
61
Reward Gold Mine
Sub Total
Hargraves Project
Sub Total
Red Hill Project
Page 6 of 18
Vertex Minerals Ltd Quarterly Activities Report – March 2024
Sub Total
1,476
1.7
80
Indicated
1,663
3.5
187
Inferred
2,551
3.6
296
4,214
3.6
483
Project Total
Grand Total
1
Stockpile results referred to in ASX Announcement 27th of April 2023
2
VTX ASX announcement 3rd of January 2024
3
VTX ASX announcement 4th of December 2023
4
VTX ASX announcement 29th of August 2023
5
VTX ASX announcement 5th of July 2023
Page 7 of 18
Vertex Minerals Ltd Quarterly Activities Report – March 2024
Figure 1 Showing Reward Resource, Fosters Exploration target and the South Star lodes. All of
which can potentially provide feed to the Hill End Gravity plant.
Cautionary Statement
The Exploration Target is conceptual in nature as there has been insufficient exploration to define a Mineral Resource. It is
uncertain if further exploration will result in the determination of a Mineral Resource under the “Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves, the JORC Code” (JORC 2012). The Exploration Target
is not being reported as part of any Mineral Resource or Ore Reserve.
STRATEGIC FOCUS
Clear Strategy set for Hill End:
1. To install a circa 120ktpa Gravity Gold plant in Q1/2 2024
2. To commence gold production from from existing stockpiles
3. Initiate mining development in the high-grade Reward Mine in 2024
4. To be Australia’s most prominent high grade gold miner
5. To drill and add high grade gold to the global Hill End gold inventory, from
the large-scale gold system/s within the Hill End Corridor.
6. To take the existing resources and near surface mineralisation to production
utilising gravity gold recovery methods.
7. Earn a robust Safety, Environmental, Social and Governance (ESG) reputation.
8. Build shareholder value.
Page 8 of 18
Vertex Minerals Ltd Quarterly Activities Report – March 2024
Figure 2 Hill End Underground Mine Infrastructure
Page 9 of 18
Vertex Minerals Ltd Quarterly Activities Report – March 2024
Figure 3 Location of the Hill End Tenements in NSW
ENVIRONMENTAL AND SUSTAINABLE MINING
•
•
•
•
•
•
•
•
•
•
Gravity Recoverable Gold
Low Capex and Low Operating cost
Minimal grind 200 to 500 micron
Potential renewable energy – Wind – pump storage
Benign tails – potential commercial sand
Benign waste
Low water usage
Re usable water
No chemicals – no cyanide
23 fine gold
Page 10 of 18
Vertex Minerals Ltd Quarterly Activities Report – March 2024
CORPORATE & FINANCIAL
As at 31 March, 2024, the Company held A$461,116 in cash.
Vertex’s expenditure during the Quarter was as follows:
Item
A$ (‘000s)
Cash Balance at beginning of Quarter
551
Sale of gold
18
Administration and Corporate Costs
(280)
Exploration and Evaluation
(297)1
Acquisition of property, plant and equipment
(655)
Proceeds from issue of shares (net of costs)
732
Proceeds for borrowings
410
Repayment of borrowings
(18)
Cash Balance at End of Quarter
$461
During the quarter, the Company made payments of $123,100 to related parties in relation to
Directors’ fees and consulting fees for both technical and management services.
1
Exploration & Evaluatoin expenditure during the quarter related primarily to Technical Studies for the
Reward Gold Mine, Tenement rents and holding costs and site costs.
Page 11 of 18
Vertex Minerals Ltd Quarterly Activities Report – March 2024
Appendix 1 – Additional ASX Information
Listing Rule 5.3.4 Use of funds
VTX was admitted to trading on the ASX on 12 January 2022. The 31 March 2024 quarter is included
in a period covered by a Use of Funds statement in a prospectus lodged with ASX under Listing Rule
1.a, condition 3. A comparison of the Company’s expenditure against the estimated Use of Funds
statement is set out below as required under Listing Rule 5.3.4.
Expenditure item
Exploration at the
projects
Cash reimbursement to
project vendors
Note
1
Expenses of the offer
2
Administration costs
1
Department of Regional
NSW – bonds transfer
Working capital
3
Use of
Funds
(2 years)
$
Actual to 31 March
2024
(excluding GST)
$
Variance
$
2,420,000
3,093,004
673,004
617,759
617,759
-
650,000
795,065
145,065
1,060,000
1,871,955
811,955
185,000
887,241
5,820,000
185,000
243,998
6,806,782
(643,243)
986,782
Note:
1. The Use of Funds statement covers a 2-year period whereas current actual expenditure
covers the period since incorporation. Expenditure items are budgeted to be incurred over
the full 2 year period with expenditure on exploration at the projects only occurring post
listing.
2. Legal fees, shareholder engagement and administration fees were higher than anticipated in
the offer.
3. VTX has concentrated exploration activities to date at the projects included in the
prospectus.
Page 12 of 18
Vertex Minerals Ltd Quarterly Activities Report – March 2024
TENEMENT INFORMATION (LISTING RULE 5.3.3)
Tenements acquired or disposed during the Quarter
N/A
Mining tenements held at the end of the Quarter
Tenement
Project
Status
Area
LOCATION
EL 5868
EL 6996
EL 8289
EL 9247
EL 9413
EL 9434
Hill End
Hargraves
Hill End
Hill End
Hill End
Hill End
Current
Current
Current
Current
Current
Current
16 Units
6 Units
1 Unit
2 Units
1 Unit
30 Units
NSW
NSW
NSW
NSW
NSW
NSW
EL 9485
Hill End
Current
1 Unit
NSW
EL 9564
Hill End
Current
2 Unites
NSW
GL 5846
ML 49
ML 50
Hill End
Hill End
Hill End
Current
Renewal Pending
Renewal Pending
2.044 ha
1.618 ha
3.02 ha
NSW
NSW
NSW
ML 315
ML 316
ML 317
ML 913
Hill End
Hill End
Hill End
Hill End
Renewal Pending
Renewal Pending
Renewal Pending
Current
6.671 ha
8.846 ha
7 ha
22 ha
NSW
NSW
NSW
NSW
ML 914
ML 915
ML 1116
ML 1541
EPL 12008
E77/2651
E 63/2058
E63/2400
EPL 12008
Hill End
Hill End
Hill End
Hill End
Hill End
Pride of Elvire
Taylors Rock
Lake Johnstone
Hill End
Current
Current
Current
Current
Issued
Current
Current
Application
Issued
21.69 ha
13.27 ha
15.71 ha
279.2 ha
51km2
57km2
96km2
-
NSW
NSW
NSW
NSW
WA
WA
WA
-
Interests may be held directly by the Company, a subsidiary, or contractually.
Farm-in or Farm-out Agreements entered into during the Quarter
N/A
Beneficial Percentage Interests Held in Farm-in or Farm-out agreements at the end of the Quarter
N/A
Page 13 of 18
Vertex Minerals Ltd Quarterly Activities Report – March 2024
Page 14 of 18
Vertex Minerals Ltd Quarterly Activities Report – March 2024
ABOUT VERTEX
Hill End NSW:
• 14km of Continuous gold lode
• Gold recovers to gravity at +90%
• Most of the line of lode only mined to the water table
• The Hill End Gold project consists of 10 mining leases & 4 Exploration licenses located in the
core of the Hill End Trough on the eastern Lachlan Fold Belt.
• The area was first recognised as a gold centre in 1851 with a number of mining operations
established over the following 50 years
• Modern exploration has not been completed and a program of multi-element and alteration
mapping has been planned to better map out the zones of high-grade mineralisation.
• Recent completion of a full geological review of the Hill End Gold Project and an updated
geological model - expected to underpin a new exploration campaign
• Largest Gold Specimen ever to be found globally found at Hill End
• Gravity Plant on site
• Fully permitted Gravity processing licence
Reward Gold Mine: 2.0g/t reporting cutoff grade
Hargraves: 0.8 g/t reporting cutoff grade (ASX Announcement 29 May 2020).
Red Hill: 0.5 g/t per block, ordinary kriging grade interpolation, classified mineral Resources Limited to 160mRL below surface.
(ASX Announcement November 2015)
Hargraves NSW:
• Hargraves Gold project is located approximately 25km south of the town of Mudgee.
• The goldfield is 4 x 10 km with numerous mineralised structures with little modern
exploration.
• An updated mineral resource in accordance with JORC 2012 Code was completed by SRK
Consulting (Australasia) Pty Ltd (SRK).
• The Board will prioritise the development of this project by updating PFS, permitting and
further drilling to increase resources.
Page 15 of 18
Vertex Minerals Ltd Quarterly Activities Report – March 2024
Taylor Rock WA:
•
•
§
§
§
§
§
The Taylor Rock Project is located 80km WSW of Norseman in the Southern Goldfields region
of Western Australia
The project has both Gold and Nickel potential, interesting historical intercepts include:
12NLJC0005: 2m @ 0.795% Ni from 202m
12NLJC004: 2m @ 0.636% Ni from 250m
10NLJC0132: 37m @ 0.477% Ni from 205m
ü Including 1m @ 1.02% Ni from 212m
ü 1m @ 0.835%Ni from 206m
ü 1m @ 0.822% Ni from 209m
ü 1m @ 0.766% Ni from 205m
LJPR0084: 3m @ 0.649%Ni from 15m
LJPA0145:
ü 1m @45.4g/t Au from 44m
ü 3m @ 9.84g/t Au from 42m
Pride of Elvire WA:
• The tenements surround the Mt. Elvire homestead approximately 210km north of Southern
Cross in Western Australia.
• Encouraging historical gold results include:
Significant Historical Intercepts from Drilling for Gold:
§
§
§
§
ME 30: 10m @ 23.2g/t Au from 17m
ME 22: 2.45m @ 9.29g/t Au from 0m
ME 31: 1m @ 144g/t Au from 15m
ME 21: 2.14m @ 1.77g/t Au from 0m
Significant Historical Rock chip results:
•
•
•
•
•
•
•
•
6754220mN, 757460mE: 215.3g/t Au
6754220mN, 757460mE: 179.7g/t Au
6759560mN, 757500mE: 43g/t Au
6759700mN, 757300mE: 30g/t Au
6756500mN, 757120mE: 24.4g/t Au
6759560mN, 757500mE: 14.5g/t Au
6756500mN, 757120mE: 5.42g/t Au
6756500mN, 757120mE: 3.33g/t Au
To learn more, please visit: www.vertexminerals.com
Stay up to date with the latest news by connecting with VTX on LinkedIn and Twitter.
Page 16 of 18
Vertex Minerals Ltd Quarterly Activities Report – March 2024
Competent Persons Statement
The information in this report that relates to the Reward Mineral Resource estimate is based on information
compiled by Mr. Troy Lowien, who is a full-time employee of Groundwork Plus. Mr. Lowien is a member of the
Australasian Institute of Mining and Metallurgy (FAusIMM), and has sufficient experience which is relevant to
the style of mineralisation and type of deposits under consideration and to the activity which he is undertaking
to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of
Exploration results, Mineral Resources and Ore Reserves”. Mr. Lowien consents to the inclusion of the data
contained in relevant resource reports used for this announcement as well as the matters, form and context in
which the relevant data appears.
The information in this report that relates to Exploration Results, Exploration Targets and the Hargraves and Red
Hill Resource Estimates is based on information compiled by Mr. Roger Jackson. Mr. Jackson is a Director and
Shareholder of the Company, who is a Fellow of the Australasian Institute of Mining and Metallurgy (FAusIMM),
Fellow of the Australasian Institute of Geoscientists and a Member of Australian Institute of Company Directors.
Mr. Jackson has sufficient experience which is relevant to the style of mineralisation and type of deposits under
consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012
Edition of the “Australasian Code for Reporting of Exploration results, Mineral Resources and Ore Reserves”. Mr.
Jackson consents to the inclusion of the data contained in relevant resource reports used for this announcement
as well as the matters, form and context in which the relevant data appears.
JORC Compliance Statements
This website contains references to Mineral Resource estimates, which have been extracted from previous ASX
announcements as set out above made by Peak Resources Ltd (ASX:PUA), the parent company of VTX prior to
the Company’s separate listing in 2022. For full details of Exploration Results in this release that have been
previously announced, refer to those announcements.
The Company confirms that it is not aware of any new information or data that materially affects the information
included in the said announcements, and in the case of estimates of Mineral Resources, that all material
assumptions and technical parameters underpinning the estimates in the relevant market announcements
continue to apply and have not materially changed. The Company confirms that the form and context in which
the Competent Persons’ findings are presented have not materially modified from the original market
announcements.
Page 17 of 18
Vertex Minerals Ltd Quarterly Activities Report – March 2024
Forward Looking Statements and Important Notice
This report contains forecasts, projections and forward-looking information. Although the Company believes that
its expectations, estimates and forecast outcomes are based on reasonable assumptions it can give no assurance
that these will be achieved. Expectations and estimates and projections and information provided by the
Company are not a guarantee of future performance and involve unknown risks and uncertainties, many of which
are out of Vertex Minerals’ control.
Actual results and developments will almost certainly differ materially from those expressed or implied. Vertex
Minerals has not audited or investigated the accuracy or completeness of the information, statements and
opinions contained in this announcement. To the maximum extent permitted by applicable laws, Vertex Minerals
makes no representation and can give no assurance, guarantee or warranty, express or implied, as to, and takes
no responsibility and assumes no liability for the authenticity, validity, accuracy, suitability or completeness of,
or any errors in or omission from, any information, statement or opinion contained in this report and without
prejudice, to the generality of the foregoing, the achievement or accuracy of any forecasts, projections or other
forward looking information contained or referred to in this report.
Investors should make and rely upon their own enquiries before deciding to acquire or deal in the Company’s
securities.
On behalf of the Directors
Roger Jackson
Executive Chairman
30 April 2024
Page 18 of 18
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Vertex Minerals Ltd
ABN
Quarter ended (“current quarter”)
68 650 116 153
31 March 2024
Consolidated statement of cash flows
Current quarter
$A’000
Year to date (9
months)
$A’000
18
72
(71)
(130)
(b) development
-
-
(c) production
-
-
(d) staff costs
-
-
(280)
(680)
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
(a) exploration & evaluation
(e) administration and corporate costs
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
-
-
1.5
Interest and other costs of finance paid
(3)
(8)
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(336)
(746)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
(655)
(1,431)
(d) exploration & evaluation
(226)
(790)
(e) investments
-
-
(f)
-
-
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date (9
months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(881)
(2,221)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
800
2,468
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
(68)
(208)
3.5
Proceeds from borrowings
410
607
3.6
Repayment of borrowings
(15)
(35)
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
1,127
2,832
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
551
596
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(336)
(746)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(881)
(2,221)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
1,127
2,832
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
Current quarter
$A’000
Year to date (9
months)
$A’000
4.5
Effect of movement in exchange rates on
cash held
-
-
4.6
Cash and cash equivalents at end of
period
461
461
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
461
551
5.2
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
461
551
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
72
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
51
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
6.1 Payment of director fees in accordance with disclosed consulting agreements
6.2 Payment to directors of additional consulting fees associated with exploration and
evaluation activities on terms consistent with the disclosed consulting agreements.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarter
Share your feedback
Discover