Replacement - Further Near-Plant High-Grade Targets
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
8 December 2023
REPLACEMENT ANNOUNCEMENT
Further Near-Plant High-Grade Gold Targets at Hill End
On 5 December 2023 Vertex Minerals Limited (ASX: VTX, Company) released an announcement
entitled “FURTHER NEAR PLANT HIGH GRADE GOLD TARGETS AT HILL END”
(Announcement).
The Company is now releasing a replacement version of the announcement (Replacement
Announcement) incorporating the following amendments:
1. Removal of non JORC-compliant historical geological information relating to the
South Star Lode
The original Announcement contained references to historical (1977) reports containing
interpretations of vein thickness and grade, however these reports do not contain all the
information necessary to enable this information to be reported in accordance with the
JORC Code and accordingly investors should not reply on the previously reported
information, which has been removed in the Replacement Announcement.
2. Additional technical information in relation to LiDAR data in JORC Table 1; and
3. Incorporation of an additional disclaimer statement concerning visual results.
Authorised for release by Alex Neuling, Company Secretary.
Vertex Minerals Limited
ASX Code: VTX
ABN: 68 650 116 153
Unit 38, 460 Stirling Hwy
Peppermint Grove
WA 6011
FURTHER NEAR PLANT HIGH GRADE GOLD TARGETS AT HILL
END:
ASX ANNOUCEMENT 8TH DECEMBER 2023 (REPLACEMENT TO ANNOUNCEMENT
DATED 5TH DECEMBER 2023)
HIGHLIGHTS:
•
Further high-grade gold targets identified south of Vertex’s Hill End Gold Plant and Reward
Resource
•
Ground truthing LiDAR data reveals further workings around the South Star group of mines
(refer to Figure 1)
•
Multiple parallel gold bearing quartz veins at South Star strike >800m. (refer to Figure 1)
•
Historically, South Star reported most production was from the west-dipping veins on the
western limb of the Hill End Anticline
•
South Star lies 1.5km south of the Hill End Gold Plant and has the potential to provide future
feed
•
No drilling has been carried out at South Star and only limited sampling has been completed.
•
The Vertex team are planning diamond drill programs at;
1. South Star,
2. Fosters Exploration Target and
3. Below the Reward Resource (see drill collar locations on Figure 1.)
*The above aim to build upon the existing Reward Resource
•
The Reward Gold Mine PFS expected to be finalised in December 2023
•
The Reward gold mine is well-placed for a simple start-up:
✓ The existing gravity processing plant is located adjacent to the underground mine
access point
✓ Mine access point extends into the resource, so only stripping and refurbishment
development is required
✓ Second egress in place with ladder way and motorised Alimak conveyance
✓ Some underground fleet and utility services are already in place
✓ Hill End gravity gold processing plant refurbishment near completion
✓ Permitted Mining licence and DA in place for Plant, Stockpiles, and the Reward
underground mine.
Vertex Minerals Limited (ASX:VTX) (“Vertex” or the “Company”) is pleased to advise further near mine
high grade gold targets have been recognised just south of the Gravity process plant and Reward Gold
Mine, Hill End NSW at the South Star group of gold mines.
Executive Director, Tully Richards commented:
“Vertex is pleased to announce further exploration and resource development opportunities as
its Reward Resource PFS comes closer to completion. Ground truthing of the company’s LiDAR
dataset, around the South Star group of gold mines, as covered by ML’s, has revealed greater
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
latitude for further ‘near mine’ resource growth. An extensive mapping and sampling program is
being planned for summer and drill program planning is underway.”
Figure 1 Showing in long section the location of the South Star lode relative to the Hill End Gold plant
and the High-grade Reward Gold Resource.
*
For further details of the current resource at Reward, refer ASX Announcement dated 26 June 2023
* For further details of the Fosters Exploration Target, refer ASX Announcement dated 29 August 2023
*Hawkins Hill was mined in the 1870s
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
Figure 2 Location of the South Star Lode relative to the Hill End Project and photo locations
(figures 3, 4,5)
The South Star
The South Star prospect area is located on the Hill End Anticline about 2-km south of Hawkins Hill and
immediately north of the Turon River. Linear arrays of old mine workings are present on both flanks
of the anticline and one or more saddle reefs outcrop along the axis. Most reported historical
production has come from laminated bedding-parallel quartz veins on the west limb of the anticline,
with reports that some occurrences are sets of multiple veins over minable widths.
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
Review of existing published and in-house reports and geologic and mineral deposit maps suggests
styles of mineralisation similar to that at Hawkins Hill-Reward. There is significant untested potential
for Reward-type bedding-parallel fold limb vein set high-grade Au targets in the South Star area, with
the caveat that the coincidence of Indicator-type feeder structures and significant bedding-parallel
vein set are present. Additionally, the potential for Hargraves and Germantown-type saddle reef
mineralisation has not been adequately investigated.
Historical information
Gold mineralisation was discovered in the 1860s by the Thomas Wythes party but there was little
production until the claims were acquired by the South Star Gold Mining Company in 1871 and Lewis’
crusher installed on the Turon River in September 1872. By that time the South Star Mine underlay
shafts on the west limb veins extended to 51.8-m. Most reported production was from the W-dipping
veins of South Star line on the west flank of the Hill End Anticline.
Figure 3 Layback shaft, at surface, on the Brand and fletcher lode (Quartz) in the South Star
area. Host rock Turbidites and Greywackes. These quartz veins have not been sampled or assayed
by Vertex. No mineralisation being reported.
Figure 4 South Star lode showing two quartz veins, in Turbidities and Greywackes. These quartz
veins have not been sampled or assayed by Vertex. No mineralisation being reported.
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
Figure 5 South Star lode showing a quartz vein at surface at around 30cm thick, hosted in Turbidites. These
quartz veins have not been sampled or assayed by Vertex. No mineralisation being reported.
Cautionary Statement – Visual Estimates
Visual estimates of mineral abundance should never be considered a proxy or substitute for laboratory analyses
where concentrations or grades are the factor of principal economic interest. Visual estimates also potentially
provide no information regarding impurities or deleterious physical properties relevant to valuations.
This announcement has been approved by the Board of Vertex Minerals Limited.
Further Information:
Roger Jackson, Executive Chairman
Tully Richards, Technical Director
roger@vertexminerals.com.au
tully@vertexminerals.com.au
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
ABOUT VERTEX MINERALS LIMITED
Vertex Minerals Limited (ASX: VTX) is an Australian based gold exploration company developing its advanced Hill
End gold projects located in the highly prospective Eastern Lachlan Fold Belt of Central West NSW. Other Company
assets include the Pride of Elvire gold project and Taylor Rock gold/nickel/lithium project both located in the
Eastern Goldfields of WA. The focus of Vertex Minerals is to advance the commercial production of gold from
its NSW projects embracing an ethical and environmentally sustainable approach:
•
•
•
•
•
Gravity Separation: The deportment of gold at the Hill End Project allows high recovery to a concentrate
produced using gravity separation techniques.
Direct Smelting: The use of direct smelting of a gold concentrate that eliminates the need to use cyanide as
a solvent.
Contrast in Density: These separation techniques take advantage of the contrast in density of gold (ρ=19.3)
relative to quartz (ρ=2.65).
Renewable Energy Potential: The unique landscape and infrastructure makes Hill End ideal for the
establishment of renewable sources of power. The Crudine Ridge Windfarm is only 30km from the project
site and Vertex plans to examine a pumped hydro-electricity scheme as an integral part of any proposed
development. The topography and existing mine workings including shafts and adits make the establishment
of a pumped hydro scheme achievable at modest expense.
Benign Tailings: The tailings will essentially be quartz with little to no sulphide minerals.
HARGRAVES GOLD PROJECT (NSW)
•
•
•
Hargraves Gold project is located approximately 2 5 km south of the town of Mudgee.
The goldfield is 4 x 10 km with numerous mineralised structures with little modern exploration.
An updated mineral resource in accordance with JORC 2012 Code was completed by SRK Consulting
(Australasia) Pty Ltd (SRK) – total of 2.3Mt at 2.38g/t Au for 177koz Au.
HILL END GOLD PROJECT (NSW)
•
Consists of 10 mining leases and three Exploration Licences located in the core of the Hill End Trough on the
eastern Lachlan Fold Belt.
•
Gravity Gold Plant
•
•
PFS underway for the Reward Gold Mine
24km of continuous gold lode with gold recovery rate to gravity at +90%. Pride of Elvire Gold Project (WA)
•
Tenements surround the Mt. Elvire homestead approximately 210km north of Southern Cross in
Western Australia
The project has seen historical drilling with encouraging gold results achieved.
•
TAYLOR ROCK PROJECT (WA)
•
•
Located 80km WSW of Norseman in the Southern Goldfields region of Western Australia.
The project has both Gold and Nickel potential, interesting historical intercepts have recorded
encouraging mineralisation.
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
HILL END GLOBAL RESOURCE
Deposit
Reward Gold Mine1
Hill End Project Mineral Resource Estimate
Classification
Tonnes
Grade
(kt)
Au (g/t)
Contained
Au (koz)
Indicated
Inferred
141
278
419
15.5
17.3
16.7
71
155
225
Indicated
Inferred
1,109
1,210
2,319
2.7
2.1
2.4
97
80
178
Indicated
Inferred
413
1,063
1,476
1.4
1.8
1.7
19
61
80
Indicated
Inferred
1,663
2,551
4,214
3.5
3.6
3.6
187
296
483
Sub Total
Hargraves Project2
Sub Total
Red Hill Project
Sub Total
Project Total
Grand Total
FOSTERS EXPLORATION TARGET3
Deposit
Range
Fosters below Reward Gold Mine Lower
Range
Upper
Range
Tonn
es
(kt)
524
Au (g/t)
Ounces Au
(koz)
12.5
211
524
19
320
Cautionary Statement
The Exploration Target is conceptual in nature as there has been insufficient exploration to define a
Mineral Resource. It is uncertain if further exploration will result in the determination of a Mineral
Resource under the “Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves, the JORC Code” (JORC 2012). The Exploration Target is not being reported as part of
any Mineral Resource or Ore Reserve.
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
COMPETENT PERSONS STATEMENT
The information in this report that relates to Exploration Results and Exploration Targets is based
on information compiled by Mr. Roger Jackson, a Director and Shareholder of the Company, who is
a 25+ year Fellow of the Australasian Institute of Mining and Metallurgy (FAusIMM), Fellow of the
Australian Institute of Geoscientists (FAIG) and a Member of Australian Institute of Company
Directors. Mr. Jackson has sufficient experience which is relevant to the style of mineralisation and
type of deposits under consideration and to the activity which he is undertaking to qualify as a
Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of
Exploration results, Mineral Resources and Ore Reserves”. Mr. Jackson consents to the inclusion of
the data contained in relevant resource reports used for this announcement as well as the matters,
form and context in which the relevant data appear.
FORWARD LOOKING STATEMENTS AND IMPORTANT NOTICE
This report contains forecasts, projections and forward-looking information. Although the Company
believes that its expectations, estimates and forecast outcomes are based on reasonable
assumptions it can give no assurance that these will be achieved. Expectations and estimates and
projections and information provided by the Company are not a guarantee of future performance
and involve unknown risks and uncertainties, many of which are out of Vertex Minerals’ control.
Actual results and developments will almost certainly differ materially from those expressed or
implied. Vertex Minerals has not audited or investigated the accuracy or completeness of the
information, statements and opinions contained in this announcement. To the maximum extent
permitted by applicable laws, Vertex Minerals makes no representation and can give no assurance,
guarantee or warranty, express or implied, as to, and takes no responsibility and assumes no liability
for the authenticity, validity, accuracy, suitability or completeness of, or any errors in or omission
from, any information, statement or opinion contained in this report and without prejudice, to the
generality of the foregoing, the achievement or accuracy of any forecasts, projections or other
forward looking information contained or referred to in this report. Investors should make and rely
upon their own enquiries before deciding to acquire or deal in the Company’s securities.
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
JORC COMPLIANCE STATEMENTS
Where statements in this announcement make reference to exploration results which previously
been reported, the Company confirms that it is not aware of any new information or data that
materially affects the information included in the original announcements, and in the case of
estimates of Mineral Resources, that all material assumptions and technical parameters
underpinning the estimates in the relevant market announcements continue to apply and have not
materially changed. The Company confirms that the form and context in which the Competent
Persons’ findings are presented have not materially modified from the original market
announcements.
1 For further details of the current resource at Reward, refer ASX Announcement dated 26 June 2023
2 For further details of the resource at Hargraves and Red Hill, refer to the IGR in the Company’s listing prospectus dated
21 October 2021 and released on ASX on 12 January 2022.
3 For further details of the Fosters Exploration Target, refer ASX Announcement dated 29 August 2023
Sources of information and maps include:
•
Geological Survey of NSW Department of Mines survey report GS 1975/279, “Appraisal of geological work involved
in mapping in the South Star area, Hill End” by Bowman, Holmes and Baker in October 1975.
•
Geological Survey of NSW Department of Mines survey report GS 1977/045, “The South Star line of reefs, Hill End,
NSW” by Weber and Baker in March 1977. Good detailed information on the South Star line of lode.
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
APPENDIX 1. SOUTH STAR – JORC CODE TABLE 1, CHECKLIST OF ASSESSMENT AND REPORTING CRITERIA
Section 1: Sampling Techniques and Data
CRITERIA
JORC Code Explanation
Commentary
SAMPLING
TECHNIQUES
•
•
Nature and quality of sampling (e.g., cut
channels,
random
chips,
or
specific
specialised industry standard measurement tools
appropriate to the minerals under investigation, such as
down hole gamma sondes, or handheld XRF instruments,
etc). These examples should not be taken as limiting the
broad meaning of sampling.
•
•
•
•
•
•
•
Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or systems
used.
•
•
•
•
No sampling has been carried out. This Table 1 refers
to an aerial Lidar survey.
LiDAR data was collected across 162 km2 area in
NSW.
Project design vertical accuracy was 0.10m on clear
ground at one sigma, with at least four points
emitted per square metre, with up to eight returns
per emitted point.
LiDAR data was georeferenced using base station
data.
The flying height for aerial data acquisition was
approximately 1000m above ground.
Project datum isGDA94.
No new Drilling or Geochemical sampling results are
presented here.
Data classification is ICSM Level 2 (ground, nonground, vegetation and structures, etc).
Data classification was manually checked and edited
against georeferenced digital orthophotography
and/or intensity imagery acquired as part of this
project.
Elevation data will be gathered as WGS ellipsoidal
heights and was adjusted to orthometric heights by
applying a correction to every data point using the
relevant geoid model.
LiDAR data was delivered in industry-standard LAS
formats, plus a 0.5m ground grid in ASCII Format and
GeoTIFF.
•
Aspects of the determination of mineralisation
that are Material to the Public Report. In cases
where ‘industry standard’ work has been done this would
be relatively simple (e.g., ‘reverse circulation drilling was
used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other
cases, more explanation may be required, such as where
there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g.,
submarine nodules) may warrant disclosure of detailed
information.
•
DRILLING
TECHNIQUES
Drill type (e.g., core, reverse circulation, openhole hammer, rotary air blast, auger, Bangka,
sonic, etc) and details (e.g., core diameter, triple or
standard tube, depth of diamond tails, face-sampling bit,
or other type, whether core is oriented and if so, by what
method, etc).
DRILL SAMPLE
RECOVERY
•
Method of recording and assessing core and chip
sample recoveries and results assessed.
•
No drilling is being reported on.
•
Not Applicable. No drilling data is being reported
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
•
•
Not Applicable. No drilling data is being reported
•
•
Not Applicable. No drilling data is being reported
Measures taken to maximise sample recovery and
ensure representative nature of the
samples.
Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential loss/gain of
fine/coarse material.
CRITERIA
JORC Code Explanation
Commentary
LOGGING
•
•
•
Whether logging is qualitative or quantitative in •
nature. Core (or costean, channel, etc) .
photography.
Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical studies.
•
SUB-SAMPLING
TECHNIQUES AND
SAMPLE
PREPARATION
•
•
Not Applicable. No drilling data is being reported
Not Applicable. No drilling data is being reported
•
Not Applicable. No drilling data is being reported
•
Not Applicable. No drilling data is being reported
•
Not Applicable. No drilling data is being reported
For all sample types, the nature, quality, and
appropriateness of the sample preparation
technique.
•
Not Applicable. No drilling data is being reported
Quality control procedures adopted for all subsampling stages to maximise representivity of
samples.
•
Not Applicable. No drilling data is being reported
The total length and percentage of the relevant
intersections logged.
If core, whether cut or sawn and whether
quarter, half or all core taken.
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
.
dry.
•
•
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
•
Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field
duplicate/second-half sampling.
•
QUALITY OF ASSAY
DATA AND
LABORATORY TESTS
CRITERIA
Whether sample sizes are appropriate to the grain
size of the material being sampled.
•
The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or total.
•
Not Applicable. No drilling data is being reported
•
No samples have been submitted for assaying yet
No drilling data is being reported
Commentary
•
•
•
•
•
•
Nature of quality control procedures adopted (e.g.,
standards, blanks, duplicates, external laboratory
checks) and whether acceptable
levels of accuracy (i.e., lack of bias) and precision have
been established.
The verification of significant intersections by
either independent or alternative company
personnel.
• The use of twinned holes.
•
LOCATION OF DATA
POINTS
Not Applicable. No drilling data is being reported
JORC Code Explanation
For
geophysical
tools,
spectrometers,
handheld
XRF
instruments,
etc,
the
parameters used in determining the analysis including
instrument make and model, reading times, calibrations
factors applied and their
derivation, etc.
VERIFICATION OF
SAMPLING AND
ASSAYING
•
•
•
No geophysical tools, spectrometers, or
handheld XRF instruments have been used to date
to determine chemical composition at a semiquantitative level of accuracy.
No samples have been dispatched to date.
No drilling data is being reported
•
It has not been possible to independently verify
significant intersections to date.
There has been no use of twinned holes to date.
Documentation of primary data, data entry •
Not Applicable.
procedures, data verification, data storage . No drilling data is being reported
(physical and electronic) protocols.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to locate drill
holes (collar and down-hole surveys),
trenches, mine workings and other locations used in
Mineral Resource estimation.
•
•
•
•
No adjustments to assay data have been made.
Surface workings around the South Star group of
mines (ie shafts, adits, mine dumps and associated
mining related infrastructure) were picked up during
a LiDAR survey completed in August 2022.
LiDAR data was collected in GDA2020 – MGAz55, by
Aerometrex Ltd using a fixed wing aircraft flying at 1000m.
Data was collected at a resolution of 10 points per
square metre and 10cm vertical accuracy.
Survey control required prior to processing said
LiDAR was completed by Precision Exploration
Services.
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
CRITERIA
JORC Code Explanation
Commentary
•
DATA SPACING AND
DISTRIBUTION
•
Specification of the grid system used.
•
•
Quality and adequacy of topographic control.
•
•
Data spacing for reporting of Exploration
Results.
•
ORIENTATION OF
DATA IN RELATION
TO GEOLOGICAL
STRUCTURE
Whether the data spacing and distribution is
sufficient to establish the degree of geological and
grade continuity appropriate for the
Mineral Resource and Ore Reserve estimation
procedure(s) and classifications applied.
•
•
•
•
•
•
SAMPLE SECURITY
•
•
Whether sample compositing has been
applied.
Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the
deposit type.
If the relationship between the drilling orientation
and the orientation of key mineralised structures
is considered to have introduced a sampling bias,
this should be assessed and reported if material.
The measures taken to ensure sample
security.
Processing of the resulting survey-controlled LiDAR
data was completed by GeoCloud Analytics. Out puts
included a 0.5m resolution DEM from which surface
workings could be recognized and highlighted.
GDA2020 – MGAz55
Surveyed static base points, levelling swatches tied
into available Trig Stations (for vertical control) and
level and frequency control pickups followed by RTK
processing ensured a very high quality data set
The spacing of LiDAR data collected was 10 points
per square metre..
There are no Mineral Resources or Ore Reserves.
At the scale and resolution of the features being
identified and resolved, the data spacing is more
than adequate.
No sample compositing required with this style of
data.
Not Applicable, no sample compositing was carried
out on site.
•
•
•
•
•
LiDAR data at the high resolution collected results
in an unbiased representation of geological and
cultural features.
LiDAR data represents the surface area of the area
regions surveyed, with X,Y and Z data reported for
across topography of a predefined areas.
No new drilling reported
LiDAR survey areas are completely independent of
mineralisation or structural style and are therefore
considered unbiased.
LiDAR data is confidential, and only accessed by
Vertex representatives, and GeoCloud Analytics Ltd.
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
CRITERIA
JORC Code Explanation
Commentary
AUDITS OR REVIEWS
•
• Airborne LiDAR survey included field test points of
survey areas located in accessible areas.
• LiDAR test points were used to test and validate the
achieved accuracy of the LiDAR. •Results of test
point comparisons and achieved accuracy reported
in the project metadata.
• LiDAR data was georeferenced using CORS base
station data.
• Feld survey work and data validation was undertaken
by Vertex.
The results of any audits or
reviews of sampling techniques
and data.
Section 2: Reporting of Exploration Results
CRITERIA
JORC Code explanation
Commentary
MINERAL
TENEMENT AND
LAND TENURE
STATUS
•
•
•
EXPLORATION DONE
BY OTHER PARTIES
•
GEOLOGY
•
Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or
national park and environmental settings.
The security of the tenure held at the time of
reporting along with any known impediments
to obtaining a licence to operate in the area.
Acknowledgment and appraisal of exploration by
other parties.
Deposit type, geological setting, and style of
mineralisation.
•
•
•
The Project tenements are 100% held by Vertex
Minerals Limited.
All tenements are in good standing.
Geological Survey of NSW report GS1977/045 by C.R.
Weber and C.J. Baker provides a good summary of
exploration by other parties on “THE SOUTH STAR LINE
OF GOLD REEFS, HILL END NSW”
The below ‘South Star summary of geology’ is quoted
from, Geological Survey of NSW report GS1977/045 by
C.R. Weber and C.J. Baker “THE SOUTH STAR LINE OF
GOLD REEFS, HILL END NSW”
“Surface and underground geological investigations
along (parts of) the South Star Line of Gold Reefs, Hill
End, have shown the auriferous quartz veins in the area
are mostly parallel to bedding and dip westerly at
55degs to 60degs. They are probably epigenetic and
were perhaps formed during diagenesis. The quartz
veins contain gold. The country rocks at South Star are
different to the country rocks at Hawkins Hill, where
rich gold deposits have been found previously. The
South Star quartz veins do not appear to occupy similar
stratigraphic positions as those at Hawkins Hill.
DRILL HOLE
INFORMATION
•
A summary of all information material to the
understanding of the exploration results
including a tabulation of the following information
for all Material drill holes:
− Easting and northing of the drill hole collar.
− Elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole
collar.
− Dip and azimuth of the hole.
− Down hole length and interception depth.
− Hole length.
•
Not Applicable as no drilling has been completed
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
•
If the exclusion of this information is justified on
the basis that the information is not Material
and this exclusion does not detract from the
understanding of the report, the Competent
Person should clearly explain why this is the
case.
DATA AGGREGATION
METHODS
•
CRITERIA
JORC Code explanation
In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g., cutting of
•
•
Not Applicable as no drilling has been completed
No results are being reported. No drilling data is being
reported
Commentary
high grades) and cut-off grades are usually
Material and should be stated.
•
•
RELATIONSHIP
BETWEEN
MINERALISATIO N
WIDTHS AND
INTERCEPT LENGTHS
•
•
•
DIAGRAMS
•
BALANCED
REPORTING
•
OTHER
SUBSTANTIVE
EXPLORATION DATA
•
FURTHER WORK
•
•
No grades are reported
•
No metal equivalents are reported.
•
No local grid has been applied.
•
Not Applicable as no drilling has been completed
•
Not Applicable as no drilling has been completed
Appropriate maps and sections (with scales) and
tabulations of intercepts should be
included for any significant discovery being
reported These should include, but not be limited
to a plan view of drill hole collar
locations and appropriate sectional views.
•
Refer to figures contained within this report.
Where comprehensive reporting of all Exploration
Results is not practicable, representative reporting
of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.
•
Where aggregate intercepts incorporate short
lengths of high grade results and longer lengths of
low grade results, the procedure
used for such aggregation should be stated and
some typical examples of such
aggregations should be shown in detail.
The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
These relationships are particularly important
in the reporting of Exploration Results.
If the geometry of the mineralisation with respect
to the drill hole angle is known, its nature should
be reported.
If it is not known and only the down hole
lengths are reported, there should be a clear
statement to this effect
Share your feedback