Ore Production Update, Reward Gold Mine
Released
Released
Announcement PDF
1
ASX ANNOUNCEMENT 7TH
MAY 2026 ASX:VTX
ORE PRODUCTION UPDATE,
REWARD GOLD MINE
Operational Milestones
✓ Strong emphasis on development throughout April with 78 metres of advance
development achieved and an additional 42 metres of development rehabilitation
completed during the month.
✓ 53 oz of gold sold in April, with approximately another 32 oz of gold on hand and
available for sale.
✓ Vertex has placed an order, with construction commencing on a Muki LHBP from
Resemin, a narrow vein long hole rig. This machine will allow accurate blast hole
drilling to support production activities using the new smaller drive sizes. (Figure 2)
✓ The second Aramine loader has arrived onsite at the Reward Gold Mine and is now
underground and fully operational with Teleremotes (Figure 3).
✓ The second Bird underground truck is under construction. The second truck will
remove a critical production bottleneck.
✓ Decline 3 flatback lift two has commenced (Figure 1), with ore to commence
processing in early May.
✓ Two new air-leg stopes, targeting our high grade Paxtons Reef on the 671 and 677
levels have commenced.
✓ Scheduling improvements continues to be implemented to improve the number of
production mining fronts in our LOM. Accessing from Decline 2 will allow a centre
retreat mining sequence from the 600 level and set up for mining below the current
known resource.
✓ DA modification to change work hours and blasting time, which has been limiting
underground work hours, has been progressing.
2
Vertex Minerals Limited (ASX: VTX) (“Company”) is pleased to announce that it has
progressed with underground development, whilst remaining on track to
commence mining the first long hole in October 2026.
The emphasis remains on prompt rehabilitation of the declines to get to the lower
levels, so long hole stope mining can commence from bottom up.
April 2026 has seen lower production of gold compared with March, which was
expected and in line with the current mine plan, as all ore processed throughout the
month came from development ore with no airleg or jumbo flatback stopes online
throughout the month.
The current restrictions around both work hours and blasting times have been
identified as significant factors in limiting available underground working hours. DA
modifications to change the working and blast hours for the Reward Gold Mine are
currently assessed by Bathurst Regional Council.
Going forward, the Company expects to see the benefits from the establishment of
multiple mining areas and development levels for underground mining production.
Figure 1 Decline 3 Flat Back Lift 2 and Decline 1 & 2 Mining Faces as at 30 April.
3
Figure 2 Muki Production Drilling Rig
Figure 3 Second Aramine Loader arrival on site
4
This announcement has been approved by the Board.
Further Information:
Roger Jackson, Executive Chairman
roger@vertexminerals.com.au
Jim Simpson, Executive Director Operations
jim.simpson@vertexminerals.com.au
Tully Richards, Executive Director Geology
and Exploration
tully@vertexminerals.com.au
Follow Vertex Minerals on LinkedIn
Vertex Minerals Limited
ASX Code: VTX
ABN: 68 650 116 153
5
Vertex Flagship Project
✓ Commenced gold processing in new Gekko gravity gold plant
✓ 100% owned mining operation
✓ No hedge
✓ High grade gold resource and reserve 225 ozs at 16.7g/t + more
✓ Inherited AU$25 million of underground development at Reward
✓ 1.8m Au ozs historic mining
✓ Reward sits just under the historic Hawkins Hill mine - 435kozs at 309 g/t Au
✓ Production has commenced on stockpiles.
✓ Underground development underway
✓ Up to 95% recovery by gravity processes only
✓ Big gold system – 25km + strike
Mineral Resource Estimate (MRE) for the Reward gold deposit at Hill End now stands at 419,000t
at 16.72g/t Au for 225,200oz Au1
:
Classification Cut-off Tonnes Au (g/t) Ounces
Indicated 4 141,000 15.54 70,500
Inferred 4 278,000 17.28 154,700
Total 4 419,000 16.72 225,200
Global Mineral Resource estimate for the Hill End & Hargraves Gold Project
Hill End Project Mineral Resource Estimate
Deposit Classification Tonnes Grade Contained
(kt) Au (g/t) Au (koz)
Reward Gold Mine
Indicated 141 15.5 71
Inferred 278 17.3 155
Sub Total 419 16.7 225
Hargraves Project
Indicated 1,109 2.7 97
Inferred 1,210 2.1 80
Sub Total 2,319 2.4 178
Red Hill Project
Indicated 413 1.4 19
Inferred 1,063 1.8 61
Sub Total 1,476 1.7 80
Project Total
Indicated 1,663 8.9 187
Inferred 2,551 8.6 296
Grand Total 4,214 8.7 482
1
(VTX ASX Announcement 21 June 2023).
6
FORWARD LOOKING STATEMENTS AND IMPORTANT NOTICE
This report contains forecasts, projections and forward-looking information. Although the
Company believes that its expectations, estimates and forecast outcomes are based on reasonable
assumptions it can give no assurance that these will be achieved. Expectations and estimates and
projections and information provided by the Company are not a guarantee of future performance
and involve unknown risks and uncertainties, many of which are out of Vertex Minerals’ control.
Actual results and developments will almost certainly differ materially from those expressed or
implied. Vertex Minerals has not audited or investigated the accuracy or completeness of the
information, statements and opinions contained in this announcement. To the maximum extent
permitted by applicable laws, Vertex Minerals makes no representation and can give no assurance,
guarantee or warranty, express or implied, as to, and takes no responsibility and assumes no
liability for the authenticity, validity, accuracy, suitability or completeness of, or any errors in or
omission from, any information, statement or opinion contained in this report and without
prejudice, to the generality of the foregoing, the achievement or accuracy of any forecasts,
projections or other forward looking information contained or referred to in this report. Investors
should make and rely upon their own enquiries before deciding to acquire or deal in the
Company’s securities.
JORC COMPLIANCE STATEMENTS
Where statements in this announcement refer to exploration results which previously been
reported, the Company confirms that it is not aware of any new information or data that materially
affects the information included in the original announcements, and in the case of estimates of
Mineral Resources, that all material assumptions and technical parameters underpinning the
estimates in the relevant market announcements continue to apply and have not materially
changed. The Company confirms that the form and context in which the Competent Persons’
findings are presented have not materially modified from the original market announcements.
COMPETENT PERSON’S STATEMENT
The information in this report that relates to Exploration Results and Exploration Targets is based
on information compiled by Mr. Roger Jackson, a Director and Shareholder of the Company, who
is a 25+ year Fellow of the Australasian Institute of Mining and Metallurgy (FAusIMM), Fellow of
the Australian Institute of Geoscientists (FAIG) and a Member of Australian Institute of Company
Directors. Mr Jackson is the Executive Chairman and a full-time employee of Vertex Minerals
Limited (“Company”), and a shareholder of the Company. Mr. Jackson has sufficient experience
which is relevant to the style of mineralisation and type of deposits under consideration and to
the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition
of the “Australasian Code for Reporting of Exploration results, Mineral Resources and Ore
Reserves”. Mr. Jackson consents to the inclusion of the data contained inrelevantresourcereports
used for this announcement as well as the matters, form and context in which the relevant data
appear.
Share your feedback