Vertex Agrees Share Placement for Acquisition of
Processing Plant
to Reduce Development Time
for the Reward Gold Mine
ASX ANNOUNCEMENT 2ND FEBRUARY 2024
HIGHLIGHTS:
•
Vertex has acquired a Gekko gravity gold plant located at the Morningstar Gold Mine in
Victoria. The Gekko plant is a modular design that can be easily transported.
•
Placement to raise $0.8M before costs.
•
The acquisition is expected to reduce the Project capital expenditure by around $4 million.
•
The acquisition will reduce the time required to develop the project and is anticipated to bring
gold production forward by up to 5 months.
•
The Gekko plant is ideally suited to the free milling, high-grade Reward ore.
•
The Gekko plant has substantially higher throughput capacity relative to the existing plant at
Hill End and the potential to be upgraded further.
•
The higher throughput is an important step to increase gold production, drive down unit costs
($/tonne processed), and improve the economics of mining at Hill End.
•
The Reward Gold Mine PFS is being updated to incorporate the lower capex of the Gekko
plant.
•
Vertex has purchased the Gekko plant for AUD $620,000 plus GST.
•
The Reward gold mine is well-placed for a simple start-up:
ü The existing gravity processing plant is located adjacent to the Reward Mine portal.
ü Existing mine development extends into the resource, so only stripping and
refurbishment of the access is required.
ü Second means of egress is already established.
ü Some underground fleet and utility services are already in place.
ü Permitted Mining licence and DA in place for plant, stockpiles, and the Reward
underground mine.
ü Permitted tailings dam has capacity to allow immediate commencement of operations.
•
Recent trial processing of stockpiled material adjacent to the gold plant established that the
average feed grade was 2 g/t. Trial processing was suspended in December 2023 due to plant
reliability. It is the Company’s opinion that the stockpiled material will have a favourable
economic benefit when processed at a higher rate. It is planned to process these stockpiles as
the first feed to the new plant, to establish early cashflows while developing the high-grade
stopes in the Reward Mine.
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
Vertex Minerals Limited (ASX:VTX) (“Vertex” or the “Company”) is pleased to announce that it has secured a
Gekko gold gravity processing plant to be used for future onsite processing of gold ore at its Hill End Gold Project.
Benefits of the new plant include.
• Substantially higher throughput and potential to be further upgraded.
• PLC operated sequenced Stop/Start capability
• Requires 2 operators - keeping operating costs down.
• Full monitoring, including density, mass flows, and sampling.
• Rigid gold security.
• Can be monitored remotely.
• Gekko Systems supported.
• Full spare parts support.
• Ergonomic design.
• State of the Art safety systems.
• Lower power usage.
• Circa $4-5m saving on a new build.
• Moves gold production forward up to 5 months compared to the new build contemplated in the PFS.
• Provides the opportunity to process stockpiles economically while we develop the underground.
Gekko are world leaders in the manufacture of gold processing plants and machinery with their plants boasting
small footprints and low environmental impact. An added attraction to Vertex is that the Australian-made Gekko
plant is modular providing for scalability and ease of modification.
Figure 1 The Morning Star Gekko Modular Gravity Gold plant looking west.
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
Figure 2 The Morningstar Gekko Modular Gravity Gold plant looking north.
Share Placement
To fund the initial acquisition cost of the plant, the Company has agreed a share and option placement (Placement)
to raise up to $0.8M before costs. CPS Capital has been appointed as Lead Manager for the Placement.
Under the terms of Placement, the Company has agreed to place up to 10,000,000 new fully paid ordinary shares
(Placement Shares) at $0.08 per Share using the Company’s placement capacity under Listing Rule 7.1. Subject to
shareholder approval, the Company will also issue new options (Placement Options), on a 1:1 basis to placement
participants. The Placement Options will have an exercise price of $0.25 per share and an expiry date of 17 July
2026. Also subject to Shareholder Approval and completion of the Placement, CPS Capital will be entitled to receive
3,000,000 options on the same terms as the Placement Options.
Executive Chairman, Roger Jackson commented: “This is an opportunistic purchase for Vertex, given we were
planning to build a similar but new gravity gold plant for processing the high-grade Reward ore this year, as set out
in our recently published PFS. This acquisition will save us at least 4 million dollars and get us producing gold bars
up to 5 months earlier. The refurbished Gekko plant will be able to treat substantially higher throughput and is
upgradeable. The plant is fully automated and will only require 2 operators on any one shift. It has state-of-theart safety and security systems installed. Being a Gekko plant we have engaged Gekko to refurbish and install the
plant at the existing Hill End plant site. This plant will be matched up to our existing gold room, with our recently
purchased Wilfley table and the feed end of the existing plant. Further, we have in place a water reticulation
system, power generation, offices, Change Rooms, workshop, Crib room, access roads, security and communication
systems, and tails facilities. We will now need to update, for the better, our PFS where we will see the capital cost
come down and free cash flow increase. The plant will be ready for feeding during the development of the Reward
underground mine, so we can treat our stockpiled material to provide early cash flows. This will be a
transformational year for Vertex.”
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
About Gekko
Gekko was founded in 1996 and started out producing In-Line Pressure Jigs for continuous gravity separation. The
growing demand for energy-efficient devices spurred Gekko to re-invent and advance traditional processing
flowsheets. Innovative modular designs, elegant systems and smart manufacturing launched Gekko as a world
technical leader in gold processing and low-energy mining solutions. Offering significant cost benefits and a low
environmental footprint; Gekko process designers customise self-contained high recovery plants for minimal startup capital, using high-quality components and in-house expertise. These flexible modular plants are engineered to
deliver super-efficient, environmentally friendly recoveries, by combining Gekko's gravity pre-concentration,
flotation, and intensive leach technologies.
Figure 3 Proposed refurbished flow sheet of the new plant.
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
Figure 4 - Long section the location of the feed sources for the Gekko gold plant.
This announcement has been approved by the Board of Vertex Minerals Limited.
Further Information:
Roger Jackson, Executive Chairman
roger@vertexminerals.com.au
Tully Richards, Technical Director
tully@vertexminerals.com.au
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
ABOUT VERTEX MINERALS LIMITED
Vertex Minerals Limited (ASX: VTX) is an Australian-based gold mining and exploration company
developing its advanced Hill End gold projects located in the highly prospective Eastern Lachlan Fold
Belt of Central West NSW. Other Company assets include the Pride of Elvire gold project and Taylor
Rock gold/nickel/lithium project both located in the Eastern Goldfields of WA. The focus of Vertex
Minerals is to advance the commercial production of gold from its NSW projects embracing an ethical
and environmentally sustainable approach:
•
•
•
•
•
Gravity Separation: The deportment of gold at the Hill End Project allows high recovery to a
concentrate produced using gravity separation techniques.
Direct Smelting: The use of direct smelting of a gold concentrate eliminates the need to use
cyanide as a solvent.
Contrast in Density: These separation techniques take advantage of the contrast in density of
gold (ρ=19.3) relative to quartz (ρ=2.65).
Benign Tailings: The tailings will essentially be quartz with little to no sulphide minerals.
Recycled Water: The water can be fully recycled and is clean due to having no metals in the ore.
HARGRAVES GOLD PROJECT (NSW)
•
•
•
Hargraves Gold project is located approximately 2 5 km south of the town of Mudgee.
The goldfield is 4 x 10 km with numerous mineralised structures with little modern exploration.
An updated mineral resource in accordance with JORC 2012 Code was completed by SRK
Consulting (Australasia) Pty Ltd (SRK) – a total of 2.3Mt at 2.38g/t Au for 177koz Au.
HILL END GOLD PROJECT (NSW)
•
Consists of 10 mining leases and three Exploration Licenses located in the core of the Hill End
Trough on the eastern Lachlan Fold Belt.
•
Gravity Gold Plant
•
•
PFS completed for the Reward Gold Mine
24km of continuous gold lode with gold recovery rate to gravity at +90%.
PRIDE OF ELVIRE GOLD PROJECT (WA)
•
Tenements surround the Mt. Elvire homestead approximately 210km north of Southern
Cross in Western Australia
•
The project has seen historical drilling with encouraging gold results achieved.
TAYLOR ROCK PROJECT (WA)
•
•
Located 80km WSW of Norseman in the Southern Goldfields region of Western Australia.
The project has both Gold and Nickel potential, interesting historical intercepts have
recorded encouraging mineralisation.
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
HILL END GLOBAL RESOURCE
Deposit
Reward Gold Mine1
Hill End Project Mineral Resource
Estimate
Classification
Tonnes
Grade
(kt)
Au (g/t)
Contained
Au (koz)
Indicated
Inferred
141
278
419
15.5
17.3
16.7
71
155
225
Indicated
Inferred
1,109
1,210
2,319
2.7
2.1
2.4
97
80
178
Indicated
Inferred
413
1,063
1,476
1.4
1.8
1.7
19
61
80
Indicated
Inferred
1,663
2,551
4,214
3.5
3.6
3.6
187
296
483
Sub Total
Hargraves Project2
Sub Total
Red Hill Project
Sub Total
Project Total
Grand Total
FOSTERS EXPLORATION TARGET3
Deposit
Fosters below Reward Gold Mine
Range
Lower Range
Upper Range
Tonnes
(kt)
524
524
Au
(g/t)
12.5
19
Ounces Au (koz)
211
320
Cautionary Statement
The Exploration Target is conceptual in nature as there has been insufficient exploration to define a
Mineral Resource. It is uncertain if further exploration will result in the determination of a Mineral
Resource under the “Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves, the JORC Code” (JORC 2012). The Exploration Target is not being reported as part of
any Mineral Resource or Ore Reserve.
COMPETENT PERSONS STATEMENT
The information in this report that relates to Exploration Results and Exploration Targets is based on
information compiled by Mr. Roger Jackson, a Director and Shareholder of the Company, who is a
25+ year Fellow of the Australasian Institute of Mining and Metallurgy (FAusIMM), Fellow of the
Australian Institute of Geoscientists (FAIG) and a Member of Australian Institute of Company
Directors. Mr. Jackson has sufficient experience which is relevant to the style of mineralisation and
type of deposits under consideration and to the activity which he is undertaking to qualify as a
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of
Exploration results, Mineral Resources and Ore Reserves”. Mr. Jackson consents to the inclusion of
the data contained in relevant resource reports used for this announcement as well as the matters,
form and context in which the relevant data appear
FORWARD LOOKING STATEMENTS AND IMPORTANT NOTICE
This report contains forecasts, projections and forward-looking information. Although the Company
believes that its expectations, estimates and forecast outcomes are based on reasonable
assumptions it can give no assurance that these will be achieved. Expectations and estimates and
projections and information provided by the Company are not a guarantee of future performance and
involve unknown risks and uncertainties, many of which are out of Vertex Minerals’ control.
Actual results and developments will almost certainly differ materially from those expressed or
implied. Vertex Minerals has not audited or investigated the accuracy or completeness of the
information, statements and opinions contained in this announcement. To the maximum extent
permitted by applicable laws, Vertex Minerals makes no representation and can give no assurance,
guarantee or warranty, express or implied, as to, and takes no responsibility and assumes no liability
for the authenticity, validity, accuracy, suitability or completeness of, or any errors in or omission
from, any information, statement or opinion contained in this report and without prejudice, to the
generality of the foregoing, the achievement or accuracy of any forecasts, projections or other
forward looking information contained or referred to in this report. Investors should make and rely
upon their own enquiries before deciding to acquire or deal in the Company’s securities.
JORC COMPLIANCE STATEMENTS
Where statements in this announcement refer to exploration results which previously been reported,
the Company confirms that it is not aware of any new information or data that materially affects the
information included in the original announcements, and in the case of estimates of Mineral
Resources, that all material assumptions and technical parameters underpinning the estimates in the
relevant market announcements continue to apply and have not materially changed. The Company
confirms that the form and context in which the Competent Persons’ findings are presented have not
materially modified from the original market announcements.
1 For further details of the current resource at Reward, refer ASX Announcement dated 26 June 2023
2 For further details of the resource at Hargraves and Red Hill, refer to the IGR in the Company’s listing
prospectus dated 21 October 2021 and released on ASX on 12 January 2022.
3 For further details of the Fosters Exploration Target, refer ASX Announcement dated 29 August 2023
Sources of information and maps include:
•
Geological Survey of NSW Department of Mines survey report GS 1975/279, “Appraisal of geological work involved
in mapping in the South Star area, Hill End” by Bowman, Holmes and Baker in October 1975.
•
Geological Survey of NSW Department of Mines survey report GS 1977/045, “The South Star line of reefs, Hill End,
NSW” by Weber and Baker in March 1977. Good, detailed information on the South Star line of lode.
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
Share your feedback
Discover