QUARTERLY ACTIVITIES REPORT
FOR THE PERIOD ENDED 31 March 2025
HIGHLIGHTS FOR QUARTER
• Commissioning of the Reward Gold Mine Gravity plant commenced, with the processing
of gold ore through the gravity gold plant undertaken throughout the quarter.
• Focus during the quarter was on moving the business to be operationally ready for
underground mining at the Reward gold mine
• Acquisition of key equipment, to be incorporated into underground fleet at the Reward
Gold Mine:
• Epiroc Boomer TD1, specifically designed for high-speed drilling in narrow vein mining
in cross sections up to 23m2.
• Aramine L350D Loader, remote-operated to enable long-hole stoping which requires
the loader to operate in unsupported ground
• Reward gravity gold plant stepped up processing over the quarter capacity with
expectations of lifting the throughput each week going forward.
• Feed grade material sampled from the stockpiles are averaging 2.40 g/t which is
consistent with previous test work and bulk sampling
• Some small parcels of gold sold over the quarter
• Key operational personnel onboarded at the Reward Gold Mine, along with the
appointment of experienced mining executive Sean Richardson as an Independent NonExecutive Director
• Installation and commissioning of TOMRA laser ore sorter and pre-concentrator at the Hill
End gravity gold plant.
• Vertex Gold plant operators trained to operate and maintain the Tomra sorter by the
Tomra technician who are based nearby in Sydney.
• Additional on-site training for Vertex staff to operate the plant by Gekko technicians
• Successful completion of US listing and commencement of trade in Vertex securities on
the OTCQB Market under the ticker VTXXF.
• Post quarter-end, the VTX Technical Services team identified a fully developed stope block
which will be incorporated into the mine production start-up
Vertex Minerals Executive Chairman, Roger Jackson, commented: “The March quarter was
another busy period of activity for Vertex, highlighted by the processing of first ore through
our newly installed gravity gold plant, alongside extensive preparations to ramp up mining
activity at the Reward gold mine. As we head into the June quarter, Vertex remains on track
to achieve our stated objective to develop into a significant Australian gold producer.”
Vertex Minerals Ltd Quarterly Activities Report – March 2025
“The team’s hard work was rewarded post quarter-end, with confirmation the plant
processed ore to a gold concentrate with visible gold evident in concentrate. The work carried
out to-date shows that Vertex is positioned with well-established on-site downstream
processing operations to complement the planned expansion of our mining operations. With
an experienced on-site field team now in place, we look forward to providing further updates
on what’s shaping up as an exciting year ahead with gold prices globally remaining extremely
favourable to emerging producers.”
Vertex Minerals (ASX:VTX)) (‘Vertex’ or the ‘Company’), is pleased to provide a summary of
its activities for the quarter ended 31 March 2025.
Operational highlights during the period included:
REWARD GRAVITY GOLD COMMISSIONING
• Vertex’s gravity gold plant was electrically, mechanically and operationally commissioned
in the quarter.
• The plant was commissioned using low grade stockpile material
• The plant has needed low-cost modifications to handle the abundance of fine material in
these old stockpiles. Fines are a consequence of surface stockpile weathering over time.
This issue is only isolated to the surface stockpile material which is in the weathered zone.
The Reward underground ores will be fresh rock and will contain less fines and have
significantly greater gold grades than the surface stockpiles.
• Fine-tuning components of the gravity plant that were set for the future Reward hard rock
feed include.
• Reducing the clearance in the jaw crusher.
• Dampeners over the sorting screen.
• Increasing the gold concentrate resident time in the Falcon concentrator.
• Increasing recycling load in the regrind mill.
• Adjusting water flows for different circuits in the plant.
• Reducing throughput of fines on the sand line.
ORE SORTER
Vertex believe ore sorting technology can positively impact the sustainability and profitability
of Vertex’s operations at Reward by:
•
Gravity processing significantly higher -grade ore post sorting, and less feed tonnes,
resulting in reduced.
ü plant running time
ü operator hours
ü energy & water consumption, leading to,
ü lower operating costs and
ü reduced carbon footprint.
Further - Tailings material (sand) can be significantly reduced in volume, leading to
further ESG benefits and cost savings
Page 2 of 19
Vertex Minerals Ltd Quarterly Activities Report – March 2025
Rock
WASTE
Quartz
and
GOLD
Figure 1 Laser Sorter- sorts the quartz with gold from the rock with no gold
KEY PERSONNEL ONBOARDED
During the quarter, Vertex prioritized the onboarding of skilled operational staff to advance
its mining and gold processing operations.
Alan Mills, Commercial Manager. Alan is a qualified chartered accountant with over 15 years’
experience. He has worked for both multinational and ASX listed mining organisations such
as Glencore, Aeris Resources, Newmont Corporation and Mitsui & Co. and held both sitebased and corporate office based senior commercial, financial and management accounting
positions. Alan holds a Bachelor of Commerce (Accounting) from Griffith University and is a
member of Chartered Accountants Australia and New Zealand.
Carl Clark, Senior Mining Geologist: Carl has 30+ years as a geologist in Australia and overseas
and cut his teeth in the WA goldfields. "Vertex holds one of the premier gold resources in
NSW at Hill End. I'm excited to be part of the team reawakening this Australian gold mining
icon,” Clark said.
Thomas Cowan, Senior Mining Engineer. Thomas holds a B. Eng (mining) from University of
Wollongong, Grad. Dip of mine Ventilation and a NSW Underground Supervisors
certificate. He is experienced in mine planning, drill and blast and ventilation in both
underground coal and base metals. Tom most recently worked at Tritton copper mine owned
and operated by Aeris Resources.
Casey Robinson, Environmental Advisor: Casey graduated from the University of Wollongong
in November 2024 with a Degree in Environmental Engineering, before Starting at Vertex as
Environmental Advisor in December.
Page 3 of 19
Vertex Minerals Ltd Quarterly Activities Report – March 2025
Dennis Fernandez, Underground Shift Supervisor: +30 year underground mining veteran ,
with 14 years of airleg experience. Dennis has his NSW and Western Australia supervisor
ticket and was most recently at Tritton Operations.
Julian Geldard, Senior Mining Geologist: With nearly a decade of experience in mining and
exploration in various commodities, Julian has a high focus on narrow vein gold within the
Lachlan fold belt. He has recently worked at Ballarat Goldfields and Woods Point Mine.
Mick Irwin, Safety and Training Superintendent: Started with Vertex Minerals in early
January 2025 after more than 20 years in the underground coal mining industry.
Figure 2 Mine Engineer Tom Cowan investigating mine-ready high-grade stopes in old development areas
NEW UNDERGROUND LOADER ORDERED
VTX placed an order for an Aramine L350D Loader to be incorporated into the underground
fleet at the Reward Gold Mine. The loader is specifically designed for small size gold mining.
For its size it is very powerful with a 4t carrying and loading capacity. It is also a very
comfortable and safe machine to operate, as it has its cabin in the centre of the machine.
The L350D loader will be utilised for production work in the Reward Mine. It will be fitted with
remotes so that the machine can be operated from a remote location. This enables Vertex to
undertake long hole stoping which requires the loader to operate in unsupported ground.
Page 4 of 19
Vertex Minerals Ltd Quarterly Activities Report – March 2025
NEW PLANT LOADER ARRIVED
Figure 3: Aramine L350D purchased by Vertex (similar to picture)
Figure 4: Aramine L350D purchased by Vertex (similar to picture)
Figure 4: Arrival of the JCB426 at the Reward Gold Mine to be used feeding the plant.
MOVING THE HIGH-GRADE REWARD GOLD MINE TO MINE READINESS
Mining
Drill Consumables
• Robit has been engaged to supply and service consumables for our Jumbo and airleg
drills. Airleg consumables have been obtained to begin rehabilitation and widening
works to the initial section of the Amalgamated Adit.
Ground support
• Split Set Mining Systems has been selected to supply ground support to the Reward
Gold Mine, the first delivery has been received for mine rehabilitation works.
Page 5 of 19
Vertex Minerals Ltd Quarterly Activities Report – March 2025
General mining
• Split Set Mining Systems are also the main supplier of general mining consumables.
• Rehabilitation works have begun
• Mine dewatering system is being installed and declines are being dewatered
• Service holes have been drilled to bypass the mine portal
• Johnex has been selected for mine explosive supply
• Application for Vertex Minerals Explosives Magazine licence has been submitted to
the Resources Regulator
Machinery
• First Jumbo will arrive in May
• Initial secondary ventilation fans are arriving in early May
• Underground work basket is being fabricated and will be on site in mid May
• ANFO charge basket has been ordered and is being fabricated
Mine planning
• The mine ventilation network has been finalised and primary fan installed
• Initial airleg stopes have been identified and designed
• Initial production areas along the Mica vein sets has been finalised
• Capital development designs are being finalised to access both the Reward Ore
Zone and Central Broad Zone
• Diamond drill platforms have been identified and designed
Geology
Geology Information systems:
• The mine ventilation network has been finalised and primary fan installed
• Initial airleg stopes have been identified and designed
• Short listing of drill hole database management system.
• Construction of folders and spreadsheets for reporting of production and grade
control.
• Collating and organization of historical data.
• Short listing and set up of 3D software. Vulcan selected.
Underground
• Sampling of underground and surface stockpiles. Sampling of old headings. Sampling
of Mill tails stream.
• Metallurgical test work for appropriate assay method selection.
• Purchase of consumables.
• LM90 diamond drill sent to Orange for some retrofits
Resource
• Review of Resource models and consultants reports.
• Identification and design of grade control diamond drilling for Resource infill where
required.
• Design of Resource extension drilling beneath the 600rl and North of the mine
workings.
Page 6 of 19
Vertex Minerals Ltd Quarterly Activities Report – March 2025
Environment
• Acoem engaged for acquisition of environmental monitoring equipment. Dynamate semi-
portable Blast Monitoring units installed and operational, ES-405 Particulate Profiler and
Smart Noise Monitor to arrive early May.
• Revised Rehabilitation Management Plan for operational status from care and
maintenance.
• Updated Forward Plan, Annual Rehab Report and Rehab Cost Estimate completed for
Resources Regulator.
Commercial
• Completion of the selection and negotiation phase of the ERP (Enterprise Resource
Planning) software implementation project, resulting in the selection of Pulse Mining
Systems ERP. Discovery phase to be completed during April.
• Selection and commencement of implementation of The Access Group’s Definitiv – Payroll
and Workforce Management Software, to increase the efficiencies and productivity
around workforce management and payroll.
• Increased focus by the Commercial team on analytical reporting, improved financial
analysis and business improvement projects. Strong emphasis on business partnering and
supporting operational teams as the mine moves towards the production phase.
• Continued onboarding of new suppliers with key mining consumables suppliers providing
solutions tailored to the unique Reward Gold Mine site. Continued preference for
suppliers within the local region.
• Logistical partnership formalised with WPE Freight Services to support the significant
transport requirements of the mine development phase and ongoing supply needs of the
site.
Safety & Training
• Continual implementation of INX Software to ensure high visibility of employees,
contractors and visitors to site, as well as the introduction of a real time incident and injury
reporting system.
• Introduction ChemAlert to track, identify and maintain stock levels of chemicals on site.
This system also gives employees immediate access to Material Safety Data Sheets.
• Ongoing review and implementation of underground operating procedure and training
documentation with Access Mining.
• The purchase of additional MSA 30/100 self-rescuers and miners cap lamps to increase the
number of workers underground
Page 7 of 19
Vertex Minerals Ltd Quarterly Activities Report – March 2025
Figure 5 PFS Mine schedule at Reward
Figure 6 Vertex Technical team have found mine-ready stopes in the upper workings
Page 8 of 19
Vertex Minerals Ltd Quarterly Activities Report – March 2025
Figure 7 Ore ready to be mined
THE REWARD GOLD MINE IS WELL PLACED FOR A SIMPLE START UP
• The new processing plant has been constructed adjacent to the underground mine portal (640
Level) opening into the Amalgamated adit
• The 640 Level Adit extends into the resource which will be mined
• Second egress in place with existing ladder way from 640 Level to surface.
• Some underground fleet and utility services are already owned by Vertex.
• Mining Licence and DA in place for the processing plant, stockpile processing and the
underground mining, with a ramp up requiring further consent.
Page 9 of 19
Vertex Minerals Ltd Quarterly Activities Report – March 2025
Figure 8: Automation programming technician testing the Reward gravity plant systems from control room
Figure 9: Hill End Gravity Gold plant simplified flow sheet
STRATEGIC FOCUS
Clear Strategy set for Hill End:
1. To re install a refurbished circa 110ktpa Gekko Gravity Gold plant in 2024
2. To commence gold production from existing stockpiles in early 2025
3. To commence mining development in the high-grade Reward Mine in late 2024
4. To commence at a reduced throughput, but with ore sorting and ramp up
5. To be Australia’s most prominent high grade gold miner
6. To drill and add high grade gold to the global Hill End gold inventory, from the large-scale
gold system/s within the Hill End Corridor.
7. To take the existing resources and near surface mineralisation to production utilising
gravity gold recovery methods.
8. Earn a robust Safety, Environmental, Social and Governance (ESG) reputation.
9. Build shareholder value
Page 10 of 19
Vertex Minerals Ltd Quarterly Activities Report – March 2025
ENVIRONMENTAL AND SUSTAINABLE MINING
•
•
•
•
•
•
•
•
•
•
•
Gravity Recoverable Gold
Low Capex and Low Operating cost
Minimal grind 200 to 500 micron
Potential renewable energy – Wind – pump storage
Benign tails – potential commercial sand
No Tails dam just dry stacked and rehabilitated
Benign waste
Low water usage
Re usable water
No chemicals – no cyanide
23 fine gold
Figure 10 Reward gravity gold Falcon concentrators
Page 11 of 19
Vertex Minerals Ltd Quarterly Activities Report – March 2025
Figure 11: Ore sorting circuit
Figure 12: Reward gold gravity plant looking back over the crushing circuit
Page 12 of 19
Vertex Minerals Ltd Quarterly Activities Report – March 2025
Figure 13: Reward gravity gold plant looking over the 2 jaw crushers and the impact crusher
Figure 16 Hill End Gold system sits within the Lachlan Fold Belt
Page 13 of 19
Vertex Minerals Ltd Quarterly Activities Report – March 2025
CORPORATE & FINANCIAL
As at 31 March 2025, the Company held A$1,405,876 in cash. Vertex’s expenditure during the
Quarter was as follows:
Item
A$ (‘000s)
Cash Balance at beginning of Quarter
902
Receipts from customers
28
Mine Development
(168)
Production Costs
(545)
Interest and costs of finance
(73)
Administration and Corporate Costs
(638)
Exploration and Evaluation
(259)
Property, plant and equipment
(4,430)
Convertible debt funding received, net of costs
6,249
Conversion of options
38
Costs of equity raising
(77)
Net proceeds from borrowings
379
Cash Balance at End of Quarter
$1,405
During the quarter, the Company made payments of $325,000 to related parties in relation
to Directors’ fees and consulting fees for both technical and management services.
TENEMENT INFORMATION (LISTING RULE 5.3.3)
No tenements were acquired or disposed during the Quarter
Mining tenements held at the end of the Quarter
Tenement
Project
Status
Area
LOCATION
EL 5868
EL 6996
EL 8289
EL 9247
EL 9413
GL 5846
Hill End
Hargraves
Hill End
Hill End
Hill End
Hill End
Renewal Pending
Renewal Pending
Current
Current
Current
Current
16 Units
6 Units
1 Unit
2 Units
1 Unit
2.044 ha
NSW
NSW
NSW
NSW
NSW
NSW
ML 49
ML 50
ML 315
ML 316
ML 317
ML 913
ML 914
Hill End
Hill End
Hill End
Hill End
Hill End
Hill End
Hill End
Current
Current
Current
Current
Current
Renewal Pending
Renewal Pending
1.618 ha
3.02 ha
6.671 ha
8.846 ha
7 ha
22 ha
21.69 ha
NSW
NSW
NSW
NSW
NSW
NSW
NSW
Page 14 of 19
Vertex Minerals Ltd Quarterly Activities Report – March 2025
ML 915
ML 1116
ML 1541
ELA 6466
EPL 12008
E77/2651
E 63/2058
ELA 6466
EPL 12008
Hill End
Hill End
Hill End
Hill End South
Hill End
Pride of Elvire
Taylors Rock
Hill End South
Hill End
Renewal Pending
Current
Current
Application Pending
Issued
Current
Current
Application Pending
Issued
13.27 ha
15.71 ha
279.2 ha
30 Units
51km2
57km2
30 Units
-
NSW
NSW
NSW
NSW
WA
WA
-
Interests may be held directly by the Company, a subsidiary, or contractually.
Farm-in or Farm-out Agreements entered into during the Quarter
N/A
Beneficial Percentage Interests Held in Farm-in or Farm-out agreements at the end of the Quarter
N/A
Page 15 of 19
Vertex Minerals Ltd Quarterly Activities Report – March 2025
Page 16 of 19
Vertex Minerals Ltd Quarterly Activities Report – March 2025
ABOUT VERTEX
Hill End NSW:
• 14km of Continuous gold lode
• Gold recovers to gravity at +90%
• Most of the line of lode only mined to the water table
• The Hill End Gold project consists of 10 mining leases & 4 Exploration licenses located in the
core of the Hill End Trough on the eastern Lachlan Fold Belt.
• The area was first recognised as a gold centre in 1851 with a number of mining operations
established over the following 50 years
• Modern exploration has not been completed and a program of multi-element and alteration
mapping has been planned to better map out the zones of high-grade mineralisation.
• Recent completion of a full geological review of the Hill End Gold Project and an updated
geological model - expected to underpin a new exploration campaign
• Largest Gold Specimen ever to be found globally found at Hill End
• Gravity Plant on site
• Fully permitted Gravity processing licence
Reward Gold Mine: 2.0g/t reporting cutoff grade
Hargraves: 0.8 g/t reporting cutoff grade (ASX
Announcement 29 May 2020).
Red Hill: 0.5 g/t per block, ordinary kriging grade interpolation,
classified mineral Resources Limited to 160mRL below surface.
(ASX Announcement November 2015
Hargraves NSW:
• Hargraves Gold project is located approximately 25km south of the town of Mudgee.
• The goldfield is 4 x 10 km with numerous mineralised structures with little modern
exploration.
• An updated mineral resource in accordance with JORC 2012 Code was completed by SRK
Consulting (Australasia) Pty Ltd (SRK).
• The Board will prioritise the development of this project by updating PFS, permitting and
further drilling to increase resources.
Page 17 of 19
Vertex Minerals Ltd Quarterly Activities Report – March 2025
To learn more, please visit: www.vertexminerals.com
Stay up to date with the latest news by connecting with VTX on LinkedIn.
Follow Vertex Minerals on LinkedIn
Competent Persons Statement
The information in this report that relates to the Reward Mineral Resource estimate is based on information
compiled by Mr. Troy Lowien, who is a full-time employee of Groundwork Plus. Mr. Lowien is a member of the
Australasian Institute of Mining and Metallurgy (FAusIMM), and has sufficient experience which is relevant to
the style of mineralisation and type of deposits under consideration and to the activity which he is undertaking
to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of
Exploration results, Mineral Resources and Ore Reserves”. Mr. Lowien consents to the inclusion of the data
contained in relevant resource reports used for this announcement as well as the matters, form and context in
which the relevant data appears.
The information in this report that relates to Exploration Results, Exploration Targets and the Hargraves and Red
Hill Resource Estimates is based on information compiled by Mr. Roger Jackson. Mr. Jackson is a Director and
Shareholder of the Company, who is a Fellow of the Australasian Institute of Mining and Metallurgy (FAusIMM),
Fellow of the Australasian Institute of Geoscientists and a Member of Australian Institute of Company Directors.
Mr. Jackson has sufficient experience which is relevant to the style of mineralisation and type of deposits under
consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012
Edition of the “Australasian Code for Reporting of Exploration results, Mineral Resources and Ore Reserves”. Mr.
Jackson consents to the inclusion of the data contained in relevant resource reports used for this announcement
as well as the matters, form and context in which the relevant data appears.
JORC Compliance Statements
This website contains references to Mineral Resource estimates, which have been extracted from previous ASX
announcements as set out above made by Peak Resources Ltd (ASX:PUA), the parent company of VTX prior to
the Company’s separate listing in 2022. For full details of Exploration Results in this release that have been
previously announced, refer to those announcements.
The Company confirms that it is not aware of any new information or data that materially affects the information
included in the said announcements, and in the case of estimates of Mineral Resources, that all material
assumptions and technical parameters underpinning the estimates in the relevant market announcements
continue to apply and have not materially changed. The Company confirms that the form and context in which
the Competent Persons’ findings are presented have not materially modified from the original market
announcements.
Forward Looking Statements and Important Notice
This report contains forecasts, projections and forward-looking information. Although the Company believes that
its expectations, estimates and forecast outcomes are based on reasonable assumptions it can give no assurance
that these will be achieved. Expectations and estimates and projections and information provided by the
Company are not a guarantee of future performance and involve unknown risks and uncertainties, many of which
are out of Vertex Minerals’ control.
Actual results and developments will almost certainly differ materially from those expressed or implied. Vertex
Minerals has not audited or investigated the accuracy or completeness of the information, statements and
opinions contained in this announcement. To the maximum extent permitted by applicable laws, Vertex Minerals
makes no representation and can give no assurance, guarantee or warranty, express or implied, as to, and takes
no responsibility and assumes no liability for the authenticity, validity, accuracy, suitability or completeness of,
or any errors in or omission from, any information, statement or opinion contained in this report and without
prejudice, to the generality of the foregoing, the achievement or accuracy of any forecasts, projections or other
forward looking information contained or referred to in this report.
Page 18 of 19
Vertex Minerals Ltd Quarterly Activities Report – March 2025
Investors should make and rely upon their own enquiries before deciding to acquire or deal in the Company’s
securities.
On behalf of the Directors
Roger Jackson
Executive Chairman
30 April 2025
Page 19 of 19
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Vertex Minerals Ltd
ABN
Quarter ended (“current quarter”)
68 650 116 153
31 March 2025
Consolidated statement of cash flows
Current quarter
$A’000
Year to date (9
months)
$A’000
28
38
-
(146)
(b) development
(168)
(168)
(c) production
(545)
(545)
(d) staff costs
-
-
(638)
(1,887)
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
(a) exploration & evaluation
(e) administration and corporate costs
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
-
-
1.5
Interest and other costs of finance paid
(73)
(136)
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(1,396)
(2,844)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(4,430)
(9,354)
(259)
(676)
(e) investments
-
-
(f)
-
-
(c) property, plant and equipment
(d) exploration & evaluation
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date (9
months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
14
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(4,689)
(10,016)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
4,874
3.2
Proceeds from issue of convertible debt
securities
6,658
7,777
3.3
Proceeds from exercise of options
38
38
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
(77)
(402)
3.5
Proceeds from borrowings
475
565
3.6
Repayment of borrowings
(95)
(227)
3.7
Transaction costs related to loans and
borrowings
(409)
(468)
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
6,590
12,157
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
902
2,110
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(1,396)
(2,843)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(4,689)
(10,015)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
6,590
12,157
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
Current quarter
$A’000
Year to date (9
months)
$A’000
4.5
Effect of movement in exchange rates on
cash held
(1)
(1)
4.6
Cash and cash equivalents at end of
period
1,406
1,406
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
1,406
902
5.2
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
1,406
902
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
166
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
158
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
6.1 Payment of director fees in accordance with disclosed consulting agreements
6.2 Payment to directors of additional consulting fees associated with exploration and
evaluation activities on terms consistent with the disclosed consulting agreements.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7,562
7,562
7.1
Loan facilities
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or
Share your feedback
Discover