Australian Gold Conference Presentation
Released
Released
Announcement PDF
ASX: VTX
Reward Gold Mine
Australian High-Grade Gold Producer | 100% Owned | Hill End, NSW, Australia
15 October 2026
Vertex Minerals Limited
Disclaimer
The information contained in this presentation has been provided by Vertex Minerals Ltd (“Company”) and is for informational purposes only. It is not investment or financial product
advice and does not take into account the objectives, financial situation or needs of any particular person. Unless otherwise specified, data in this presentation is based on the
Company’s management estimates. This presentation includes forward-looking statements regarding plans, strategies, production schedules and expected performance. Forward-
looking statements are subject to significant uncertainties and contingencies, many outside the Company’s control, and actual results may vary materially. Readers are cautioned not
to place undue reliance on forward-looking statements, and the Company assumes no obligation to update this information.
Mineral Resource Statement & JORC Compliance
Information in this presentation is extracted from reports lodged as market announcements and available at www.vertexminerals.com.au. The Company confirms it is not aware of any
new information that materially affects the information included in the original market announcements, and that all material assumptions and technical parameters underpinning the
estimates continue to apply and have not materially changed. The form and context in which the Competent Persons’ findings are presented have not been materially modified from
the original announcements.
ASX: VTX 2
Production Targets, Competent Persons and Listing Rule Statements
Monthly ounce figures described in this presentation as ramp-up targets or longer-term production objectives are forward looking, are subject to approvals and are not based on an
Ore Reserve estimate. Full Competent Person, Exploration Target and ASX Listing Rule 5.23.2 statements appear on slide 16.
Where It Began — Home of the Holtermann Nugget
• 1851 — Gold rush reaches Hill End and Tambaroora
• 1872 — Beyers & Holtermann’s Star of Hope mine on Hawkins Hill
yields the Holtermann Nugget: 286kg, the largest specimen of reef
gold ever found
• Hawkins Hill — directly above Reward, produced 435koz at 309 g/t
• >3,500 historic workings — most worked by hand, only to the water
table (~20m)
• Today — 150 years on, Vertex is mining the same reefs at depth with
a modern mechanised fleet
Holtermann Nugget — 286kg
Discovered at Hill End in 1872 — the largest specimen of reef gold ever found.
ASX: VTX 3
Hawkins Hill and Holtermann figures are historical production records — not JORC estimates and not indicative of results at Reward. See slide 16.
Why Reward Is Unique — Free, Coarse, High-Grade Gold
Free Gold
Up to 91% recovered by gravity alone
— no cyanide, no chemicals
Coarse & Clean
Gold liberated at 650 micron, so no
ball mill is required; negligible
sulphides, no PAF, re use water
Sorts Perfectly
No gold in the country rock — ore
sorting gives 79% mass rejection and
a 337% grade uplift
Very High Grade
Indicated Mineral Resource grade of
21.17 g/t Au
Plant at the Portal
Gravity plant beside the mine
entrance; Fosters only a few hundred
metres away
Proven Pedigree
Beneath Hawkins Hill (435koz at 309 g/t)
— home of the Holtermann Nugget
ASX: VTX 4
Grade per VTX ASX announcement 2 Sept 2026; ore sorting per 11 Sept 2024. Hawkins Hill figures are historical, not JORC. See slide 16
Unique Gold, Recovered by Gravity Alone
Up to 91% gravity recovery — no cyanide, no ball mill, no tails dam. Plant and ore sorter built and running for under $9m
Gekko gravity processing plant, commissioned on site at Reward. TOMRA ore sorter — laser sorting ahead of the mill.
Reward Gold Mine ore sorts perfectly, with 79% mass reduction and a 337.20% increase in grade in the 8mm to 50mm range.
Refer to VTX ASX announcement 11 September 2024.
ASX: VTX 5
Refer to compliance statements, slide 16.
Low-Impact, Sustainable Gold Mining
No Chemicals, Gravity
Only
• Free gold recovered by gravity —
no cyanide or chemicals
• Minimal grinding — no ball mill
required
• Fine gold recovered down to 20
micron
• No tailings dam required —
benign, dry-stacked tails
Less Waste, Less Energy
• TOMRA ore sorter rejects waste
before processing — lower energy
use and CO₂
• Rejected waste returned
underground as stope fill
• Low water usage
• Benign tails with potential for
commercial sand
Monitored &
Community-Minded
• All blasting carried out
underground
• Real-time blast vibration and noise
monitoring, readable by staff on an
app
• Dust and noise monitored in and
around Hill End
• Latest blasting technology and
modern detonators
• A major local employer in Hill End
ASX: VTX 6
Ore sorting results per VTX ASX announcement 11 September 2024. See compliance statements, slide 16.
Our Plan: Mechanise, Ramp Up, Expand
Foundations
Early 2025
• Re-install refurbished Gekko
Gravity Plant
PHASE 1
Production Kick-
off
Late 2025
• Finish conversion from historic
airleg mine to a mechanised
mine
• Commence development
mining at Reward Gold Mine
• Start at reduced throughput,
ramp up with ore sorting
• Commissioned ore sorter,
targeting 100% recovery
PHASE 2
Growth
2026 →
• Aggressive development and
stope ramp-up
• Ramping to 500, then 1,000oz
per month over 12 months and
better
• Moving from one shift to two
shifts
• Mechanised Stoping to 1.4m
and developing narrower drives
PHASE 3
Mine Expansion
2027 →
• Aggressive underground
drilling to add gold inventory
• Developing the mine in the
upper high-grade levels
• Expanding the underground
workings
PHASE 4
$25m preproduction cost
ASX: VTX 7
Phase ounce figures are forward looking objectives subject to approvals and are not based on an Ore Reserve estimate. See slide 16.
Delivered: Mechanised Fleet, Now Longhole Stoping
MODERN MINING FLEET
ASX: VTX 8
Remote Control loading
Ramping Up Now — Double Shift and 24/7 Blasting
24/7 underground operations approved — Bathurst Regional Council, 20 August 2026
Effective hours lift from 9 to 22 per day
More stope firings
Lower unit operating costs
Greater grade selectivity
Double shift — now
Moving from one shift to two, then
continuous
24/7 blasting
Every face fires when it’s ready — a
continuous drill, charge, fire, bog cycle
No new equipment
Unlocks capacity already funded and
installed
Source: VTX ASX announcements 20 August 2026 (Development Consent Modification approved) and 24 August 2026 (24/7 Underground Operations to Lift Development and Stoping Rates).
Statements regarding expected productivity, cost, ore supply and production outcomes are forward looking, are based on the Company's current mine plan and operating assumptions, are not production targets and are not based on
an Ore Reserve estimate. All blasting authorised under the modification is carried out underground. Refer to the compliance statements at the end of this presentation.
ASX: VTX 9
Production Builds Toward 1,000oz per Month and beyond
Following the last 6 months of development and rehabilitation of the Reward declines, stope mining ramps up and production builds to 1,000oz per month +
MINE TODAY MINE NOVEMBER ’26 MINE IN 6 YEARS
ASX: VTX 10
Mine design images are indicative and derived from the Company's current mine plan. The 1,000oz per month figures are forward looking objectives, are subject to approvals and are not based on an Ore Reserve estimate. Refer to the
compliance statements on slide 16.
Underground Drilling Starts 2027 — Building Gold Ounces
• 2027 — a continuous underground drilling program commences
from within the Reward mine
• Build the inventory — add gold ounces to the Mineral Resource
and upgrade Inferred ounces to Indicated, building toward a
maiden Ore Reserve
• Stay ahead of mining — keep resource growth ahead of the
mining front as production ramps up
• Targeted — three priority drill target areas defined by the 2026
resource model
• Efficient — drilling from existing underground development, close
to the targets and the plant
ASX: VTX 11
Drilling plans are forward looking. The Fosters Exploration Target is conceptual in nature. Refer VTX ASX announcement 2 September 2026 and slide 16.
1 Depth extensions
Below the existing Reward Mineral Resource
2
Hawkins Hill remnants
Ultra-high-grade material in and around the historic
Hawkins Hill mine, directly above Reward
3 Fosters, along strike
211–321koz Exploration Target ~400m south
Drilling Out Fosters — Right Next to the Plant – on the Mining Lease
211–321koz
Exploration Target: 524kt at 12.5–19
g/t Au
• A few hundred metres down strike
from the Hill End gravity plant
• Existing Fosters adit and drive — no
new approvals needed to drill
• Inside existing Mining Licences and
Development Consent
• Goal: convert significant target
ounces to Mineral Resource ounces
• South Star Lodes — undrilled high-
grade target on the same corridor
The Exploration Target is conceptual in nature
— there has been insufficient exploration to
define a Mineral Resource, and it is uncertain if
further exploration will result in one under the
JORC Code (2012). It is not being reported as
part of any Mineral Resource or Ore Reserve.
Reward Gold Mine long section — Fosters Exploration Target. Refer to VTX ASX
announcements 5 July 2023 and 29 August 2023.
ASX: VTX 12
And We Have Only Scratched the Surface over the greater tenement
• 50km of prospective strike — source of the
largest reef gold specimen ever found,
discovered at Hill End
• LiDAR survey completed — >3,000 surficial
gold workings identified across various lines
of lode
• Most historic lodes mined only to the water
table — around 60ft (<20m) depth
• Only ~0.5 miles (800m) of strike drilled to
date, and only down a few hundred metres
LiDAR-based structural map — Hill End Project mining and
exploration licences, historic workings.
ASX: VTX 13
Historic workings, LiDAR and strike-length data are exploration information only — no Mineral Resource is
implied. See slide 16.
In Summary — Why Vertex, Why Now
100%
Owned & unhedged gold producer
16.68 g/t
146.9koz Mineral Resource — Indicated
grade 21.17 g/t Au
91%
Historic Gravity recovery — no cyanide, no
ball mill, no tails dam
>$50M
Inherited underground development
already in place
~50km
Strike length, >3,500 historic workings
1,000oz/mo ++
Longer-term production target, approvals
permitting
ASX: VTX 14
Resource per VTX ASX announcement 2 Sept 2026. Ounce targets and drilling plans are forward looking; Exploration Target is conceptual. See slide 16.
Huge potential for gold inventory growth — drilling from 2027, Fosters and ~50km of strike
Sustainable, low-impact gold — no cyanide, no tails dam, waste returned underground, real-time monitoring
Thank You
Roger Jackson
Executive Director
info@vertexminerals.com.au | +61 2 7229 4849
Bowen Street, Hill End NSW | www.vertexminerals.com.au
Vertex Minerals Limited ASX: VTX | OTCMKTS: VTXXF
Bruce McInnes
Executive Chairman
Compliance Statements — JORC Code (2012) and ASX Listing Rules
ASX Listing Rule 5.23.2 — Previously Reported Information
Information in this presentation relating to the Mineral Resource estimate for the Reward Gold Mine,
Exploration Results, Exploration Targets, metallurgical testwork and ore sorting results is extracted from
reports previously lodged as market announcements and available at www.vertexminerals.com.au and on
the ASX platform under code VTX.
Vertex Minerals Limited confirms that it is not aware of any new information or data that materially affects
the information included in those original market announcements, and that all material assumptions and
technical parameters underpinning the estimates in those announcements continue to apply and have not
materially changed. The form and context in which the Competent Persons' findings are presented in this
presentation have not been materially modified from the original market announcements.
Competent Person's Statement — Mining and Production Results
The information in this presentation that relates to mining and production results is based on information
compiled by Mr Roger Jackson, a Director, full-time employee and shareholder of the Company. Mr
Jackson is a Fellow of the Australasian Institute of Mining and Metallurgy (FAusIMM) of more than 25
years' standing, a Fellow of the Australian Institute of Geoscientists (FAIG) and a Member of the Australian
Institute of Company Directors.
Mr Jackson has sufficient experience relevant to the style of mineralisation and type of deposit under
consideration, and to the activity he is undertaking, to qualify as a Competent Person as defined in the
2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves (the JORC Code). Mr Jackson consents to the inclusion in this presentation of the matters based
on his information in the form and context in which they appear.
Exploration Target — Cautionary Statement (JORC Code clause 17)
The Exploration Target referred to in this presentation in respect of Fosters and the South Star Lodes is
conceptual in nature. There has been insufficient exploration to define a Mineral Resource at these
targets, and it is uncertain whether further exploration will result in the determination of a Mineral
Resource. The Exploration Target is not being reported as part of any Mineral Resource or Ore Reserve
estimate.
Production Targets, Forecasts and Forward Looking Statements
The monthly ounce figures described in this presentation as ramp-up targets or longer-term production
objectives, and statements regarding development rates, stoping rates, rostering, equipment delivery,
operating costs and ore supply, are forward looking. They are based on the Company's current mine plan,
operating assumptions and approvals status, are subject to change, and are not based on an Ore Reserve
estimate.
Actual results may differ materially. Readers should not place undue reliance on forward looking
statements. The Company assumes no obligation to update them other than as required by law. Material
assumptions underpinning any production target reported by the Company are disclosed in the relevant
ASX announcement.
Source Announcements (ASX: VTX)
2 September 2026 — Updated Mineral Resource Estimate | 11 September 2024 — Ore Sorting
Testwork Results | 5 July 2023 and 29 August 2023 — Fosters Exploration Target | 14 July 2026 —
Reward Gold Mine Operational Update | 3 August 2026 — First Longhole Stope Fired | 20 August
2026 — Development Consent Modification Approved | 24 August 2026 — 24/7 Underground
Operations
ASX: VTX 16
Mineral resource statement
The resource estimates are classified in accordance with the Australasian Code for Reporting of
Identified Mineral Resources and Ore Reserves (JORC, 2012). The Reward estimate was
completed by Andrew Hawker of HGS Australia. Mr Hawker is an independent consultant to
Vertex Minerals Limited. Mr Hawker has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration and to the activity being undertaken to
qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Hawker consents to
the inclusion in the report of the matters based on his information in the form and context in
which it appears. The Reward Mineral Resource is classified as Indicated and Inferred. The
classification was considered appropriate based on drill hole spacing, sample intervals,
geological interpretation and representativeness of all available assay and density data. The
classification reflects the low confidence in short range grade estimations in the model.
Share your feedback