Ore Production Update - 24hrs 7days Underground Operations
Released
Released
Announcement PDF
ASX:VTX
1
ASX ANNOUNCEMENT 25TH
AUGUST 2026
ORE PRODUCTION UPDATE,
24/7 UNDERGROUND OPERATIONS TO LIFT DEVELOPMENT
AND STOPING RATES AT REWARD GOLD MINE
Operational Milestones
✓ Vertex has received approval for the Reward Gold mine to conduct continuous 24-
hour underground operations, following Bathurst Regional Council’s decision to
approve the Company’s development consent modification (DA Modification”)
(ASX:VTX announcement 20 August 2026).
✓ Vertex is now applying for a variation to its Environmental Protection License (“EPL”)
to align with the DA Modification approval. It is estimated that EPL approval could
take two to four weeks.
✓ The DA Modification permits underground blasting at any time within the approved
blasting limits, removing the fixed firing windows that have governed the mining
cycle at Reward since operations re-commenced.
✓ The major effect is that available working hours change from 9 hours per day
currently, to 22 hours per day in the future.
✓ The existing mining fleet will be better utilized, so that the operation does not need
further equipment to complete its ramp up and further growth next year.
✓ Better utilization of equipment will reduce operating costs.
✓ 59 oz of gold was sold in July 2026, with another 32 oz of gold on hand and available
for sale.
✓ Muki Jumbo rails have been fitted to the existing Epiroc T1D and Atlas Copco H104
Jumbo Drills. This will allow smaller sizes, reducing dilution by more than 20% for
the same cut length.
✓ 37m of advanced development was achieved during July 2026 and an additional 20m
of development rehabilitation completed with each Jumbo offline throughout the
month for fitting of Muki rails.
✓ Development metres and stope firings per month are expected to increase, building
ore inventory and stope availability ahead of the plant.
✓ The second Bird underground truck arrived in Australia and, once fire suppression
and lagging is fitted, will be available for use onsite by early September 2026.
✓ First panel was fired from Vertex’s trial long hole open stope at Decline 3 at the end of
July 2026 (ASX:VTX Announcement 3 August 2026), with ore beginning to be processed
during August 2026. Additional firing will continue throughout August 2026.
*Statements regarding expected productivity, cost and production outcomes are forward looking and are based on the Company’s
current mine plan and operating assumptions. They are not production targets and do not constitute a Mineral Resource or Ore
Reserve estimate. Refer to the Forward Looking Statements notice at the end of this announcement.
ASX:VTX
2
Vertex Minerals Limited (ASX: VTX) (“Vertex” or “the Company”) is pleased to provide further
detail on the operational benefits expected from the DA Modification approved by Bathurst
Regional Council, NSW, announced to the market on 20 August 2026. The DA Modification
approves 24-hour underground operations and blasting at the Reward Gold Mine and clarifies site-
wide operational hours.
The constraint that has been removed
The underground mining cycle at Reward runs in sequence: bog, ground support, drill, charge, fire
re-enter, then advance. Under the previous consent, firing was confined to 9am to 3pm six days a
week, with no firing on Sundays or public holidays.
With blasting now permitted at any time, the time to complete the cycle increases from 9 hours
per day to 11 hours per day. Ventilation clearance and re-entry can be scheduled across shift
changes and crib breaks, rather than consuming the core of a working shift. The practical effect is
a greater number of completed cycles per face per week, achieved without additional equipment.
All blasting under the DA Modification is carried out underground. Ground vibration at any
dwelling or sensitive receiver does not exceed: 10.0 mm/sec (peak particle velocity) at any time,
and 5.0 mm/sec (peak particle velocity) for more than 5% of the total number of blasts over any
period of 12months between the hours of 9:00am to 6:00pm, 7 days per week. Ground vibration
at any dwelling or sensitive receiver does not exceed 2.0 mm/s (peak particle velocity) between
the hours of 6:00pm to 9:00am, 7 days a week.
Development and stoping rates
Development metres are the primary driver of production ore at any mine. Every additional metre
of ore drive opens further stoping positions on the Mica lenses and shortens the interval between
establishing a level and delivering ore to the plant. More frequent firing and cycle completion
translates directly into more advances.
The benefit extends to long hole stoping. As announced on 3 August 2026, the Company
successfully fired the first production rings of its trial long hole open stope at Decline 3, targeting
the high-grade Mica 1 lens at a mining width of approximately 1.4m. Under continuous operations,
production rings can be fired progressively as they are charged, and bogging with the Company’s
remote-controlled Aramine loaders can continue through the night rather than pausing between
shifts.
Equipment utilisation and unit costs
A significant proportion of the cost base at Reward is fixed — the underground fleet, ventilation
and dewatering infrastructure, the refurbished Gekko gravity plant and the ore sorter are all
funded whether or not the mine is producing at any given hour. Extending operations to 24 hours
a day spreads those costs across a materially larger tonnage.
The same applies to recent and forthcoming capital investment. Modified rail sets have been fitted
to both the Company’s Jumbo Rigs, allowing smaller drive dimensions and an expected reduction
ASX:VTX
3
in dilution of more than 20% for an equivalent cut length. The Company’s dedicated Resemin Muki
long hole production drill rig — a low-profile machine suited to the narrow, confined drives typical
of the Reward workings — is confirmed for construction in mid-September 2026 ahead of shipping
to Australia. Both will be working into a mine operating around the clock, improving the return on
that investment from the outset.
Ore supply to the plant
Restriction of ore to the plant produces an uneven, batch-driven pattern of ore delivery to the
ROM pad. Continuous underground operations are expected to smooth that supply, giving the ore
sorter and the Gekko gravity circuit a more consistent feed and allowing the plant to be scheduled
with greater confidence.
Workforce and community
All blasting authorised under the DA Modification is carried out underground. The move to
extended operations will support additional roles at site across mining, maintenance, and
technical services.
Vertex is currently recruiting for an additional 20 roles to support the commencement of
nightshift, which will be predominantly recruited from the local Bathurst region.
Vertex is pleased to announce that it has progressed with underground development, whilst
remaining on track to commence bringing the mine into full production in October 2026.
The rehabbing and stripping in Decline 2 was completed during July 2026 and fresh development
has begun in the area. The main areas of focus are a capital decline to access the bottom of the
mine and a stoping platform along the Mica package.
The link drive along the Paxtons vein on the 640 level was completed, this allows conventional
bogging of the high-grade ore from the south 677 airleg stoping block, which is scheduled to be
trucked from the mine towards the end of August 2026.
A crosscut off the star of peace ore drive was developed. This will be used as a stockpile for
future stoping activities and a potential exploration platform.
Airleg activities in the northern part of the 677 level have been focusing on defining the North
Paxtons stoping block. The lower drill drive has been completed after breaking through into
historic workings on the 677 level. The upper drill drive on the 683 level is 10m away from
breakthrough into historic workings. This stoping block is scheduled for mining in mid-late
September 2026. See Figure 1.
ASX:VTX
4
Figure 1 Reward Gold Mine Main Development Areas
Figure 2 677 Level Main Airleg Stoping Area
ASX:VTX
5
Figure 3 Decline 3 Stoping Area
Figure 4 Decline 3 Long Hole Stope
ASX:VTX
6
Vertex Executive Director Operations, Jim Simpson, commented:
“The restrictive hours of work and blasting times have been the biggest impediment on this mine.
This approval, together with the move to mechanised long hole stoping and the arrival of the Muki
booms, gives us three key elements to bring the mine into production.”
This announcement has been approved for release to the ASX by Directors of Vertex Minerals
Limited.
FURTHER INFORMATION
Telephone +61 2 7229 4849
or by email at info@vertexminerals.com.au
Bruce McInnes, Executive Chairman
Roger Jackson, Executive Director
Jim Simpson, Executive Director Operations
Tully Richards, Director
COMPETENT PERSON’S STATEMENT
The information in this announcement that relates to mining and production results is based on information compiled
by Mr. Roger Jackson, a Director and Shareholder of the Company, who is a 25+ year Fellow of the Australasian
Institute of Mining and Metallurgy (FAusIMM), Fellow of the Australian Institute of Geoscientists (FAIG) and a Member
of the Australian Institute of Company Directors. Mr Jackson is the Executive Director and a full-time employee of
Vertex Minerals Limited (“Company”), and a shareholder of the Company. Mr. Jackson has sufficient experience which
is relevant to the style of mineralisation and type of deposit under consideration, and to the activity which he is
undertaking, to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves”. Mr. Jackson consents to the inclusion of the matters,
form and context in which the relevant data appear in this announcement.
FORWARD LOOKING STATEMENTS AND IMPORTANT NOTICE
This announcement contains forecasts, projections and forward-looking information, including in relation to the
Company’s mining methods, rostering, equipment delivery, development rates, operating costs and production plans.
Although the Company believes that its expectations, estimates and forecast outcomes are based on reasonable
assumptions, it can give no assurance that these will be achieved. Expectations, estimates, projections and
information provided by the Company are not a guarantee of future performance and involve unknown risks and
uncertainties, many of which are out of Vertex Minerals’ control. The statements in this announcement regarding
expected productivity, cost and ore supply outcomes are not production targets and are not based on an Ore Reserve
estimate.
Actual results and developments will almost certainly differ materially from those expressed or implied. Vertex
Minerals has not audited or investigated the accuracy or completeness of the information, statements and opinions
contained in this announcement. To the maximum extent permitted by applicable laws, Vertex Minerals makes no
representation and can give no assurance, guarantee or warranty, express or implied, as to, and takes no responsibility
and assumes no liability for, the authenticity, validity, accuracy, suitability or completeness of, or any errors in or
omission from, any information, statement or opinion contained in this announcement, including as to the
achievement or accuracy of any forecasts, projections or other forward-looking information contained or referred to
in this announcement. Investors should make and rely upon their own enquiries before deciding to acquire or deal in
the Company’s securities.