2025 Annual Report
Released
Released
Announcement PDF
VERTEX MINERALS LIMITED AND CONTROLLED ENTITIES
ABN 68 650 116 153
ANNUAL REPORT
FOR THE YEAR ENDED
30 JUNE 2025
VERTEX MINERALS LIMITED AND CONTROLLED ENTITIES
ABN 68 650 116 153
Contents
Page
Corporate directory
Chairman’s report
Review of operations
Corporate Governance Statement
Directors’ report
Auditor’s independence declaration
Consolidated statement of profit or loss and other comprehensive
income
Consolidated statement of financial position
Consolidated statement of changes in equity
Consolidated statement of cash flows
Notes to the consolidated financial statements
Consolidated Entity Disclosure Statement
Directors’ declaration
Independent auditor’s report
Additional ASX information
Schedule of tenements
1
2
4
20
24
44
45
46
47
48
50
91
95
96
101
105
VERTEX MINERALS LIMITED AND CONTROLLED ENTITIES
ABN 68 650 116 153
Corporate Directory
Directors
Roger Jackson
Executive Chairman
Tully Richards
Executive Director
Declan Franzmann
Non-Executive Director
Company Secretary
Ian Morgan
Principal and Registered Office
6 Bowen Street
HILL END NSW 2850
Telephone: +61 2 7229 4849
Email: info@vertexminerals.com.au
Website: www.vertexminerals.com
Auditors
William Buck
Level 20
181 William Street
Melbourne VIC 3000
Bankers
National Australia Bank
Securities Exchange Listing
Australian Securities Exchange
Home Exchange: Perth, Western Australia
Code: VTX
Share Registry
Automic Group
Level 5, 191 St Georges Terrace
Perth WA 6000
Telephone: 1300 288 664
1
VERTEX MINERALS LIMITED AND CONTROLLED ENTITIES
ABN 68 650 116 153
Dear Fellow Shareholders,
It is my privilege to present the Annual Report of Vertex Minerals Limited (Vertex) for the
year ended 30 June 2025.
The past 12 months have been a defining period for the Company, with significant progress
made across our gold portfolio and the transition into production in August 2025. This
milestone positions Vertex to deliver on its long-standing strategy of becoming a profitable
and sustainable Australian gold producer.
When we began the 2025 financial year, our focus was clear - to bring the Hill End Gold Project
into production, while at the same time maintaining a disciplined approach to funding,
exploration and governance. Careful planning, steady execution and strong shareholder
support throughout the year has enabled Vertex to reach its first gold pour in August 2025 a turning point that has transformed the Company into a revenue-generating business.
The journey was not without challenge. Market volatility, persistent inflation and tight labour
conditions created headwinds across the sector. Even so, mine planning and engineering at
Hill End were finalised, permitting requirements were satisfied and site works progressed to
schedule. Each of these steps brought Vertex closer to its goal of establishing sustainable
production.
Alongside development, we progressed exploration at the Hill End Gold Project, where work
focused on confirming the continuity of gold mineralisation within near-term mine plan
zones, supporting confidence in upcoming production. During the year, Vertex advanced
exploration planning and underground drill preparation at Hill End, while also maintaining
activity at the Hargraves project, which remains a key contributor to the Mineral Resource
base. In addition, the Company continued evaluating adjacent tenements for future growth
opportunities. These exploration initiatives reinforce the long-term potential of the Hill End
portfolio and underpin our strategy to establish a sustainable gold operation beyond the
initial mine life.
The Company also strengthened its financial position during the year. A series of capital
raisings - through placements, a share purchase plan and convertible notes were all well
supported by both existing shareholders and new investors. This demand allowed Vertex to
increase the size of its programs and ensured that sufficient funding was secured for mine
development and exploration. Encouragingly, a number of convertible note holders elected
to convert their holdings ahead of the expiry date, which is a clear signal of confidence in the
Company’s prospects.
2
VERTEX MINERALS LIMITED
ABN 68 650 116 153
Chairman’s Report (continued)
For shareholders, the commencement of production in August 2025 represents more than a
symbolic milestone. It marks the emergence of Vertex as a company capable of generating
cashflow, reinvesting in growth and creating long-term value. Looking ahead, our focus will
be on delivering reliable production, extending mine life through exploration, and applying
capital to maximise returns. At the same time, we remain committed to the communities in
which we operate, to maintaining the highest standards of governance and to conducting our
business responsibly.
None of this progress would have been possible without the efforts of our people. Their
commitment under challenging conditions has been critical in positioning Vertex where it is
today. On behalf of the Board, I thank them sincerely. I also acknowledge our shareholders,
whose support and patience have been essential in guiding the Company from explorer to
producer.
The year’s achievements provide a strong platform for the future. With production now
underway, exploration delivering encouraging results and a clear strategy in place, I am
confident that Vertex is well positioned to take further steps toward becoming a leading
Australian gold producer.
Roger Jackson
Executive Chairman
3
VERTEX MINERALS LIMITED
ABN 68 650 116 153
Review of Operations
Exploration and Production
Vertex Minerals Limited holds a portfolio of high-grade gold projects in New South Wales and Western
Australia, anchored by the flagship Hill End Gold Project. Together with the nearby Hargraves Gold
Project, located 35 kilometres to the north, these assets form a district-scale position within the highly
prospective Hill End - Hargraves corridor, which has historically produced more than four million
ounces of gold.
The Company’s priority during the year ended 30 June 2025 was advancing Hill End from development
into production. This work culminated in the achievement of first gold in August 2025, marking Vertex’s
successful transition from explorer to producer. Hargraves provides additional exploration potential
and the opportunity to establish a long-term satellite ore source, complementing production at Hill End
and supporting the Company’s vision of building a sustainable gold hub in the district.
Image 1: Vertex Minerals Key Projects
4
VERTEX MINERALS LIMITED
ABN 68 650 116 153
Review of Operations (continued)
Hill End Gold Project
Background
The Hill End Gold Project is located in the Central Tablelands of New South Wales, approximately 50
kilometres south of Mudgee, within the highly prospective Eastern Lachlan Fold Belt. Vertex holds 155
km² of tenure across five exploration licences, one gold lease (GL 5846) and ten mining leases (ML 49,
50, 315, 316, 317, 913, 914, 915, 1116 and 1541).
The district has a rich gold mining history, with more than four million ounces historically produced.
Vertex’s ground position spans the Hill End corridor and includes several historic high-grade mines. The
cornerstone of the Company’s development strategy is the Reward Gold Mine, a high-grade
underground deposit accessed via the existing 640 Level portal.
The Reward Gold Mine benefits from substantial existing infrastructure - a permitted processing plant
site, established portal, ventilation and services, permitted residue storage, and road access. Together,
these features provide a strong platform for Vertex’s transition from explorer to producer.
Image 2: Map of the Hill End Project Area
5
VERTEX MINERALS LIMITED
ABN 68 650 116 153
Review of Operations (continued)
Stockpile Processing
In August 2024, Vertex commenced trial processing of surface stockpiles adjacent to the Hill End
processing plant. The bulk trial, which was completed in December 2024, involved refurbishment of
the processing plant, recruitment of a small operations team, and implementation of an updated Safety
Management Plan.
A total of 23 ounces of gold were produced and sold to ABC Refinery in Sydney. More importantly, the
trial provided valuable data on throughput, recovery and grade variability of the stockpiles. The
reconciled average feed grade during the program was approximately 3 g/t Au, confirming the
suitability of gravity processing for this material. The trial successfully demonstrated that the stockpiles
could provide an initial source of production feed while underground development advanced and gave
the Company operational experience ahead of full commissioning.
Reward Pre-Feasibility Study
In January 2025, Vertex completed the Pre-Feasibility Study (PFS) for the Reward Gold Mine. The study
evaluated mining and processing scenarios for the high-grade Reward lode system and confirmed the
technical and economic viability of a staged development.
Following the February 2025 acquisition of the Morning Star Gekko gravity gold plant (discussed further
below), the PFS was updated to reflect the increased throughput and recovery potential offered by the
new facility. The updated results, released to market on 26 February 2025, highlighted Reward as a
robust, high-grade project capable of supporting near-term production. The PFS served as the
foundation for the Board’s decision to advance into mine development and positioned Reward as the
Company’s flagship operation.
Processing Plant Acquisition
In February 2025, Vertex acquired the Gekko gravity concentration plant from the Morning Star Gold
Mine in Victoria for $620,000 plus GST.
The modular plant is designed for easy relocation and installation and offers a step change in processing
capability compared to the existing 30ktpa facility. With a throughput capacity of up to 16 tonnes per
hour, the plant is expected to quadruple current processing rates while delivering higher recoveries
and lower operating costs. Key benefits include a high level of automation, modern safety systems,
remote monitoring capability and reduced staffing requirements, which together will materially
improve operating efficiency. Installation of the plant at Hill End commenced during the June 2025
quarter, with commissioning completed in July 2025.
6
VERTEX MINERALS LIMITED
ABN 68 650 116 153
Review of Operations (continued)
Ore Sorting
In March 2025, Vertex completed the installation of a TOMRA COM XRT ore sorter at the Hill End
processing site. The sorter was commissioned during the June 2025 quarter alongside refurbishment
of the processing facility, ensuring it would be fully integrated into operations ahead of the scheduled
production start in August 2025.
The ore sorter uses X-ray transmission technology to separate mineralised quartz from barren host
rock, significantly upgrading the grade of ore fed to the plant. By rejecting waste material at an early
stage, the system increases the average head grade to the mill, reduces overall tonnage processed, and
lowers operating costs.
Operational benefits of the machinery include improved grade control - ensuring high-quality material
is processed and reduced energy and water usage.
Mine Development
Parallel to the processing upgrade, underground development activities at Reward progressed during
the June 2025 quarter. The existing 640 Level was stripped and refurbished, ground support and
ventilation upgrades were installed, and services including power and water reticulation were
reinstated. Vertex also mobilised key items of underground fleet and equipment to site, laying the
groundwork for the commencement of stoping activities.
By the end of the financial year, the Reward Mine was largely prepared for the planned production
start in August 2025, with the processing plant installation running in parallel.
7
VERTEX MINERALS LIMITED
ABN 68 650 116 153
Review of Operations (continued)
Table 1. Hill End and Hargreaves Project Resource.
Note that the above figures have been appropriately rounded.
Hargraves Gold Project
Background
The Hargraves Project is located approximately 35 kilometres north of Hill End in the Central Tablelands
of New South Wales, within the highly prospective Eastern Lachlan Fold Belt. The project comprises
two granted exploration licences (EL 6996 and EL 9485) covering the historical Hargraves Goldfield. The
area has a rich mining history, with more than 1.4 million ounces of gold historically produced from
reef and alluvial workings.
Hargraves hosts a JORC-compliant Mineral Resource of 2.3 million tonnes at 2.4 g/t Au for 178,000
ounces (Table 1). Its proximity to Hill End positions Hargraves as a logical potential satellite ore source,
supporting the Company’s strategy of developing Hill End as a centralised processing hub.
Geological Review
During the September and December 2024 quarters, Vertex completed a detailed review of historic
datasets and modern exploration data for Hargraves. The objective was to refine the geological model
and identify high-priority zones of near-surface mineralisation that could be tested with targeted
8
VERTEX MINERALS LIMITED
ABN 68 650 116 153
Review of Operations (continued)
drilling. This work confirmed the potential for shallow extensions to historically mined reefs and
provided the framework for planning future exploration and development work.
Mine Planning Studies
In the March 2025 quarter, Vertex undertook conceptual mine planning studies to evaluate the
potential for near-surface ore at Hargraves to be mined and transported to Hill End for processing. The
studies assessed pit designs, haulage routes, and operating cost parameters to determine whether
Hargraves could provide supplementary ore feed.
While further drilling and feasibility work is required, the studies confirmed that Hargraves could play
a strategic role in extending the overall life of the Hill End project.
Next Steps
During the June 2025 quarter, Vertex continued to assess the outcomes of the geological review and
mine planning studies completed earlier in the financial year. This work is being used to refine and
prioritise targets for a potential drilling program at Hargraves. The proposed program will focus on
testing shallow extensions to historically mined reefs and near-surface mineralisation that could
provide supplementary ore feed to Hill End.
The Company will progress this planning during the 2026 financial year, with the objective of defining
additional JORC-compliant ounces and evaluating Hargraves’ potential role as a satellite ore source to
extend the life of the Hill End production hub.
Other Projects
Taylor Rock Project
Background
The Taylor Rock Project (E63/2058) lies on the southeastern margin of the Lake Johnston Greenstone
Belt in Western Australia, approximately 190 km southwest of Kalgoorlie. The geological setting is
highly prospective, with historic drilling identifying pegmatite swarms that may host lithium-bearing
spodumene, as well as nickel sulphide potential from past exploration campaigns by Norilsk Nickel.
9
VERTEX MINERALS LIMITED
ABN 68 650 116 153
Review of Operations (continued)
Image 3: Map of the Taylor Rock Project
Project Strategy
Vertex views Taylor Rock as an early-stage, multi-commodity opportunity, with potential across
lithium, nickel and gold. The tenement provides exposure to critical minerals within a proven geological
province and aligns with the Company’s strategy of maintaining a pipeline of exploration assets at
varying stages of development.
Next Steps
During the 2025 financial year, Vertex reviewed historical exploration datasets and assessed the most
prospective target areas of the project.
In the 2026 financial year, the Company intends to complete further desktop studies and determine
the most effective next phase of exploration, including the potential for soil sampling to test lithium
pegmatites and follow-up work on historic nickel intersections. Field programs will be advanced once
approvals and access arrangements are in place and subject to broader corporate priorities.
Pride of Elvire Project
Background
The Pride of Elvire Project (E77/2651, ~51 km²) is located in the Mt. Elvire greenstone belt in Western
Australia, approximately 210 km north of Southern Cross. The project area is historically known for
10
VERTEX MINERALS LIMITED
ABN 68 650 116 153
Review of Operations (continued)
small-scale gold mining, and previous explorers have undertaken stream, soil and rock chip sampling,
as well as RAB and RC drilling.
Image 4: Map of the Pride of Elvire Project
Project Strategy
Vertex considers Pride of Elvire to be an early-stage gold exploration asset with the potential to host a
maiden JORC gold resource. The project provides additional gold exposure within the Company’s
portfolio, complementing the more advanced Hill End and Hargraves assets.
Next Steps
No exploration work was undertaken at Pride of Elvire during the 2025 financial year. However, the
Company continued its review of historical exploration results and prioritised areas for follow-up. For
11
VERTEX MINERALS LIMITED
ABN 68 650 116 153
Review of Operations (continued)
the 2026 financial year, Vertex plans to refine this work into a staged exploration program, initially
focused on validating historical anomalies through sampling and geological mapping.
Subject to funding and portfolio priorities, this would ultimately position the project for a maiden
drilling program.
Annual Report of Mineral Resources And Exploration Results
The Statement of Mineral Resources and Exploration Results presented in this Report has been
prepared in accordance with the Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves 2012 Edition (the JORC Code 2012). Vertex is not aware of any new
information or data that materially affects the information included in this Report and confirms that all
of the material assumptions and technical parameters underpinning the Mineral Resource estimates
and Exploration Results in the relevant market announcement(s) continue to apply and have not
materially changed.
Mineral Resources and Ore Reserves - Corporate Governance Statement
Set out below is the following in relation to the Company’s Mineral Resources and Ore Reserves:
Hill End and Hargreaves And Red Hill Mineral Resource Estimates
The following tables show the Mineral Resource estimates of the Hill End and Hargraves projects in
accordance with the JORC Code (2012) as at 30 June 2025. The Company confirms that it is not aware
of any new information or data that materially affects the information included in the Mineral Resource
estimates first announced on 3 January 2024.
Deposit
Reward
Hargreaves
Red Hill
Total
Hill End and Hargreaves and Red Hill Project Mineral Resource Estimate 1,2
Classification
Cut-Off
Tonnes
Au (g/t)
Indicated
3.0
141
15.5
Inferred
3.0
278
17.3
Indicated
1.0
1,109
2.7
Inferred
1.0
110
2.1
Indicated
1.0
413
1.4
Inferred
1.0
1,063
1.8
4,214
3.6
Ounces
71,000
155,000
97,000
80,000
19,000
61,000
483,000
Table 2. Hill End and Hargreaves and Red Hill Project Mineral Resource Estimates
Notes to Table 2
1
Figures have been appropriately rounded.
2
The Reward Mineral Resource is reported at a cut-off grade of 3.0 g/t Au. The Hargraves and Red Hill Mineral Resources
are reported at a cut-off grade of 1.0 g/t Au.
12
VERTEX MINERALS LIMITED
ABN 68 650 116 153
Review of Operations (continued)
Summary of the results of the annual review of Mineral Resource and Ore Reserves
As at 30 June 2025, the Company holds Ore Reserves and Mineral Resources within the Hill End Gold
Project tenements, including the Reward and Hargraves deposits. During the year, the Company
reviewed its Mineral Resource and Ore Reserve estimates. No changes were made to the Mineral
Resource estimates, which remain current. Following completion of the Updated Pre-Feasibility Study
announced on 26 February 2024, the Company declared its maiden Ore Reserve at Reward, which also
remains current at 30 June 2025.
Ore Reserves
• Reward Deposit: Probable Ore Reserve of 130,722 tonnes at 9.74 g/t Au for 40,936 ounces of
gold.
Mineral Resources
• Reward Gold Mine: 419,000 tonnes at 16.7 g/t Au for 225,000 ounces (71,000 ounces Indicated
and 155,000 ounces Inferred).
• Combined Hill End and Hargraves: 4.2 million tonnes at 3.6 g/t Au for 483,000 ounces.
Comparison of Mineral Resources and Ore Reserves holdings against that from the previous year
No new Exploration Results or Exploration Targets were reported during the year ended 30 June 2025.
The Ore Reserve estimate at Reward and the Mineral Resource estimates at Reward, Hargraves and
Red Hill remain unchanged from those reported by the Company on 26 February 2024. The Company
confirms that all material assumptions and technical parameters underpinning those estimates
continue to apply and have not materially changed. A summary of the JORC Table 1 information for
these estimates is included in the original announcements.
Basis of mineral resources and exploration results and competent person sign-off
The information in this report that relates to Mineral Resources is based on information compiled or
reviewed by the Competent Persons named in the original announcement of 3 January 2024. Each
Competent Person has sufficient experience that is relevant to the style of mineralisation and type of
deposit under consideration and to the activity being undertaken to qualify as a Competent Person as
defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves (JORC Code).
The Company has provided each Competent Person with an advanced copy of the draft Annual Report
to review and confirm that they agree with the form and context in which the Mineral Resource
information is presented.
Cautionary Statement
Mineral Resources are not Ore Reserves and do not have demonstrated economic viability. The
estimates reported herein are based on information available at the time of compilation and no
13
VERTEX MINERALS LIMITED
ABN 68 650 116 153
Review of Operations (continued)
assurance can be given that future exploration or development will result in the estimation of Ore
Reserves.
Competent Persons
Reward Mineral Resource Estimate
The information in this report that relates to the Reward Mineral Resource estimate is based on
information compiled by Mr. Troy Lowien, who is a full-time employee of Groundwork Plus. Mr. Lowien
is a member of the Australasian Institute of Mining and Metallurgy (FAusIMM), and has sufficient
experience which is relevant to the style of mineralisation and type of deposits under consideration
and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012
Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves. Mr. Lowien consents to the inclusion of the data contained in relevant resource reports used
for this announcement as well as the matters, form and context in which the relevant data appears.
Hargreaves and Red Hill Resource Estimates
The information in this report that relates to Exploration Results, Exploration Targets and the Hargraves
and Red Hill Resource Estimates is based on information compiled by Mr. Roger Jackson. Mr. Jackson
is a Director and Shareholder of the Company, who is a Fellow of the Australasian Institute of Mining
and Metallurgy (FAusIMM), Fellow of the Australasian Institute of Geoscientists and a Member of
Australian Institute of Company Directors. Mr. Jackson has sufficient experience which is relevant to
the style of mineralisation and type of deposits under consideration and to the activity which he is
undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code
for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr. Jackson consents to the
inclusion of the data contained in relevant resource reports used for this announcement as well as the
matters, form and context in which the relevant data appears.
JORC Compliance Statements
This report contains references to Mineral Resource estimates, which have been extracted from
previous ASX announcements as set above made by Peak Resources Ltd (ASX:PUA) the parent company
of VTX prior to the Company’s separate listing in 2022. For full details of Exploration Results that have
been previously announced, refer to those announcements.
The Company confirms that it is not aware of any new information or data that materially affects the
information included in the said announcements, and in the case of estimates of Mineral Resources,
that all material assumptions and technical parameters underpinning the estimates in the relevant
market announcements continue to apply and have not materially changed. The Company confirms
that the form and context in which the Competent Persons’ findings are presented have not materially
modified from the original market announcements.
14
VERTEX MINERALS LIMITED
ABN 68 650 116 153
Review of Operations (continued)
Corporate Activities
Capital Raising Initiatives
Vertex undertook several significant capital initiatives during the 30 June 2025 financial year to support
the transition of the Hill End Gold Project into production.
•
October 2024 Placement and Convertible Loan
On 9 October 2024, Vertex completed a combined equity placement and convertible loan
package. The placement raised $1.1 million through the issue of 6,875,000 ordinary shares at
$0.16 per share. In addition, the Company secured a further $0.98 million via the issue of
convertible notes on equivalent terms. These notes were subsequently converted into ordinary
shares on 5 December 2024, following shareholder approval obtained at the Company’s Annual
General Meeting held on 29 November 2024.
The package provided Vertex with immediate liquidity to fund refurbishment of the gravity
processing plant, restart site works, and cover general working capital requirements.
•
December 2024 Convertible Notes
On 24 December 2024, the Company announced that it had secured firm commitments for $5.1
million in convertible loan funding. The notes carried a 10% p.a. coupon and were convertible
into equity at $0.17 per share. As at balance date, a portion of these loans had been converted
into ordinary shares of the Company, with the remainder continuing to be held as convertible
loans.
The proceeds were applied to mine development at the Reward underground, procurement of
long-lead items, completion of processing plant refurbishment, and general working capital.
•
January 2025 Convertible Notes
On 30 January 2025, Vertex announced it had secured a further $1.7 million in commitments
under its convertible loan facility, taking the total raised since December 2024 to $6.8 million.
These notes were issued on the same terms as the December 2024 tranche.
As part of the arrangements, Vertex’s largest shareholder, Gleneden Nominees, committed to
make available up to a further $1.0 million in working capital funding.
•
April 2025 Convertible Notes
In April 2025, Vertex received a further $1.0 million in convertible note funding, under the
existing January 2025 facility arrangement.
15
VERTEX MINERALS LIMITED
ABN 68 650 116 153
Review of Operations (continued)
The April tranche was used to maintain development momentum at Hill End, covering site
mobilisation, underground fleet refurbishment, and preparatory works for the installation of
the ore sorter and Gekko plant. With this tranche, Vertex had successfully raised in excess of
$7.8 million through its convertible note program since December 2024.
Importantly, several noteholders chose to convert their holdings early, strengthening the
Company’s equity base and reducing debt obligations ahead of production.
•
May 2025 Capital Raising Offer
On 12 May 2025, Vertex announced a comprehensive funding package designed to complete
the development of the Hill End Gold Project and provide working capital through the transition
into production. The program combined equity and convertible note funding, raising more than
$12.5 million.
A breakdown of the capital raising offer was as follows:
•
Placement: Raised $7.5 million through the issue of 35.7 million shares at $0.21 each, with
one free attaching option (VTXOA) for every three shares subscribed. The placement was
strongly supported by institutional and sophisticated investors and was completed in two
tranches, with the attaching options and Tranche 2 subject to shareholder approval
(received in July 2025).
•
Share Purchase Plan (SPP): To allow existing shareholders to participate on equal terms as
the placement participants, the Company launched an SPP on 26 May 2025 at the same
$0.21 issue price. Demand was strong, with applications totalling $1.6 million, above the
original $1.0 million target, and the offer was closed early on 6 June 2025.
•
Convertible Notes: The Company issued $3.5 million in convertible notes during May 2025
under the terms of its existing facility, supplementing earlier tranches completed in
December 2024, January 2025 and April 2025. The Company’s largest shareholder agreed
to defer settlement of its note subscription until September 2025.
Together, the placement, SPP and convertible notes provided the Company with the balance
sheet strength to complete the installation of the Gekko processing plant, progress
underground development at Reward, and achieve first production at Hill End in August 2025.
OTCQB Listing in the United States
On 31 March 2025, Vertex announced that its shares had commenced trading on the OTCQB Venture
Market in the United States under the ticker “VTXXF”.
This secondary listing broadened the Company’s exposure to North American investors and enhances