Next High-Grade Gold Producer - Presentation AGC 2024
Released
Released
Announcement PDF
VERTEX MINERALS LIMITED
REWARD GOLD MINE
Next High-Grade gold producer
August 27, 2024, | ASX: VTX
1
Disclosure and forward looking statements
Disclaimer
This presentation contains forward-looking statements which are identified by words such as ‘anticipates’, ‘forecasts’, ‘may’, ‘will’, ‘could’, ‘believes’, ‘estimates’, ‘targets’, ‘expects’, ‘plan’
or ‘intends’ and other similar words that involve risks and uncertainties. Indications of, and guidelines or outlook on, future earnings, distributions or financial position or performance and
targets, estimates and assumptions in respect of production, prices, operating costs, results, capital expenditures, reserves and resources are also forward-looking statements. These
statements are based on an assessment of present economic and operating conditions, and on a number of assumptions and estimates regarding future eventsand actions that, while
considered reasonable as at the date of this announcement and are expected to take place, are inherently subject to significant technical, business, economic, competitive, political and
social uncertainties and contingencies. Such forward-looking statements are not guarantees of future performance and involve known and unknown risks, uncertainties, assumptions and
other important factors, many of which are beyond the control of the Company, the directors and management. We cannot and do not give any assurance that the results , performance or
achievements expressed or implied by the forward-looking statements contained in this announcement will actually occur and readers are cautioned not to place undue reliance on these
forward-looking statements.
These forward-looking statements are subject to various risk factors that could cause actual events or results to differ materially from the events or results
*
estimated, expressed or anticipated in these statements.
JORC COMPLIANCE STATEMENTS
Where statements in this announcement refer to exploration results which previously been reported, the Company confirms that it is not aware of any new information or data that
materially affects the information included in the original announcements, and in the case of estimates of Mineral Resources, that all material assumptions and technical parameters
*
underpinning the estimates in the relevant market announcements continue to apply and have not materially changed. The Company confirms that the form and context in which the
Competent Persons’ findings are presented have not materially modified from the original market announcements.
• For further details of the current resource at Reward, refer ASX Announcement dated 26 June 2023
• For further details of the resource at Hargraves and Red Hill and historical recoveries, refer to the IGR in the Company’s listing prospectus dated 21 October 2021 and released
on ASX on 12 January 2022.
• For further details of the Fosters Exploration Target, refer ASX Announcement dated 29 August 2023
• For further details of the PFS at Hill End refer ASX Announcement dated 26 February 2024
22
Disclosure and forward looking statement's
Competent Persons Statement
The information in this report that relates to Mineral Resources is based on information compiled by Mr. Roger Jackson, a Director and Shareholder
of the Company, who is a 25+ year Fellow of the Australasian Institute of Mining and Metallurgy (FAusIMM), Fellow of the Australasian Institute of
Geoscientists and a Member of Australian Institute of Company Directors. Mr. Jackson has sufficient experience which is relevant to the style of
mineralisation and type of deposits under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in
the 2012 Edition of the “Australasian Code for Reporting of Exploration results, Mineral Resources and Ore Reserves”. Mr. Jackson consents to the
inclusion of the* data contained in relevant resource reports used for this announcement as well as the matters, form and context in which the
relevant data appears.
Disclaimer
This presentation
contains forward-looking statements which are identified by words such as ‘anticipates’, ‘forecasts’, ‘may’, ‘will’, ‘could’, ‘believes’,
*
‘estimates’, ‘targets’, ‘expects’, ‘plan’ or ‘intends’ and other similar words that involve risks and uncertainties. Indications of, and guidelines or
outlook on, future earnings, distributions or financial position or performance and targets, estimates and assumptions in respect of production,
prices, operating costs, results, capital expenditures, reserves and resources are also forward-looking statements. These statements are based on an
assessment of present economic and operating conditions, and on a number of assumptions and estimates regarding future eventsand actions that,
while considered reasonable as at the date of this announcement and are expected to take place, are inherently subject to significant technical,
business, economic, competitive, political and social uncertainties and contingencies. Such forward-looking statements are not guarantees of future
performance and involve known and unknown risks, uncertainties, assumptions and other important factors, many of which are beyond the control
of the Company, the directors and management. We cannot and do not give any assurance that the results , performance or achievements
expressed or implied by the forward-looking statements contained in this announcement will actually occur and readers are cautioned not to place
undueproposed
reliance
onpending
these forward-looking statements. These forward-looking statements are subject to various risk factors that could cause actual
*Excluding
issues
shareholder approval
events or results to differ materially from the events or results estimated, expressed or anticipated in these statements.
There is no material changes to the Resources quoted in this presentation
33
VERTEX
Flagship Project for Vertex - Reward High Grade Gold Mine, Hill End
Located Just North of Bathurst – 40km from Cadia
High Grade Gold Resource and Reserve
1.8m ozs historic mining
Reward sits just under the Hawkins Hill Mine
Moving to Production in early 2025
95% recovery by gravity only
4
VERTEX STRATEGY
STRATEGIC FOCUS
Clear Strategy set for Hill End
1. To re install a refurbished circa 110ktpa Gekko Gravity Gold plant in 2024
2. To commence gold production from existing stockpiles in early 2025
3. Commence mining development in the high-grade Reward Mine in late
2024
4. To commence at a reduced throughput, but with ore sorting and ramp up
5. To be Australia’s most prominent high grade gold miner
6. To drill and add high-grade gold to the global Hill End gold inventory, from
the large-scale gold system/s within the Hill End Corridor.
7. To take the existing resources and near surface mineralisation to
production utilising gravity gold recovery methods.
8. Earn a robust Safety , Environmental, Social and Governance (ESG)
reputation.
9. Build shareholder value
5
STEPS TO PRODUCTION
1.
2.
3.
4.
5.
6.
7.
8.
Acquire Morningstar Gekko gravity gold plant (Complete)
Equity raise x 2 (Complete)
Plant refurbishment and installation (In progress)
Commence underground development (In progress)
Debt funding (In progress)
Stockpile processing
Development ore processing
Reward high-grade gold ore processing
6
Recently acquired Morningstar Gecko Gravity Gold Plant
Acquired Gold plant to be refurbished and reinstated at Hill End as a 110ktpa Gravity Gold plant to process the high-grade Reward Ore.
7
Gekko Plant to be instated at Hill End with an ore sorter
New Plant flowsheet
The New plant will be located at the old plant site
(above).
Utilising the existing
• Gold Room
• Water systems
• Power generation
• Offices
• Change Rooms
• Workshop
• Storeroom
• Crib Room
• Jaw Crusher
• Access Roads
• Security System
8
BENEFITS OF NEW PLANT WITH SORTER
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
New plant will be able to treat up 110ktpa – existing plant 30ktpa
Fully Automated
Only requires 2 operators- thus much lower operating costs
Full monitoring, including density, flows, mass and sampling
Rigid gold security
Can be monitored remotely
Gekko systems backed
Full spare parts support
Ergonomic design
State of the Art safety systems
Lower power usage
Circa $4m saving on a new build
Sorter doubles grade , reduces throughput by 50%, plant only needs to operate 50%
50% less water use
Less power
½ tails material
Provides the opportunity to process stockpiles economically while we develop the underground
9
HILL-END GOLD PRODUCTION FINANCIALS from PFS does not include stockpile processing
Note: based on Indicated Resource only – This is a JORC rule. (The model uses 50kozs of the 225kozs at 16.7 g/t)
First 6 months day shift only at a reduced input.
Key Parameters (Refer ASX Announcement dated 26 February 2024)
·
Life of mine pre-tax cash of $41 million at $3,000/oz gold price.
·
6-month payback1
·
Average monthly gold production of 2,169 oz over 23 months with 92% gold recovery.
·
26,000 oz of gold produced per year on an annualised basis.
·
Mine design based on mechanised mining methods. Long hole open stoping with remotely operated loaders was selected as the primary stoping method.
·
Planned processing of 181kt of material at a head grade of 9.3 g/t for 49,890 ounces of gold recovered.
·
$17m of capital required prior to production. Savings achieved in purchase of Morning Star Plant and through deferment of discretionary expenditures
where possible.
·
Owner operator with a focus on grade not tonnes.
·
Only 2 operators required to run the plant on any shift.
10
PROCESSING WILL COMMENCE WITH STOCKPILES
· There is an estimated 50kt of stockpile
alongside the Hill End Gravity Gold Plant
· When the new plant is commissioned, Vertex
will process these stockpiles while the
development is undertaken at the Reward
underground.
12
REWARD UNDERGROUND GOLD MINE
•
The Reward gold mine is well-placed for a simple start-up:
The existing gravity processing plant is located adjacent to the underground mine access
point/Adit – new plant to be located on this footprint
Mine access point extends into the resource, so little development is required. The existing
2.4m by 2.4m adit will only require minor rehabilitation.
Second egress in place with ladder way and motorised Alimak conveyance.
Some underground fleet and utility services already in place.
Permitted Mining licence and DA in place for Plant, Stockpiles and the Reward underground
mine.
A modification to the consent is required to increase throughput but the mine and tails are
permitted.
12
2009-2010 Underground Development
with declines developed to first production for Vertex Circa $25m spent on development
Legend
2008 and Prior Development
2009 Development
2009 Development Rises
2009 & 2010 Development
2009 & 2010 Development Rises
14
Vertex is planning to acquire its own underground diamond rig
• The diamond rig will be
utilised to target
the ultra high-grade vein
system that runs down
plunge of Reward
to bring the Reward
Resource into Indicated225 kozs @16.7 grams*
The Fosters Exploration
Target
Vertex plan to run the mine
and drilling rig as an owner
operator
Refer to slide 15 for details of the total Reward Resource, including split between categories.
14
ROBUST AND PRIMED TO GROW GOLD INVENTORY
Reward Gold Mine: 2.0g/t reporting cutoff grade
Hargraves: 0.8 g/t reporting cutoff grade (ASX Announcement 29 May 2020).
Red Hill: 0.5 g/t per block, ordinary kriging grade interpolation, classified mineral Resources Limited to 160mRL below surface. (ASX Announcement November 2015)
19
Scratching the surface
Large Tenement Holding and Multiple Targets
• 34km of prospective strike that was the source of the largest Gold specimen
ever to be found globally - discovered at Hill End
• Most lodes only mined to the water table (60 feet)
• Modern exploration has not been completed and a program of multielement and alteration mapping is planned to better map out the zones of
high-grade mineralisation
• Recent completion of a full geological
6.6% review of the Hill End Gold Project
and an updated geological and structural model to underpin future
exploration campaigns
• Lidar survey completed with 3500+ surficial gold workings identified over
the line of lode
6.2%
16
High grade historical mineralisation at Hill End Mine
Historic Hill End Underground Workings
Hill End historical workings, outline of stopped areas (black) and face sample locations (purple)
18
Environmental and Sustainable Mining Objectives
Environmentally Responsible and Sustainable Gold Miner
• Gravity Recoverable Gold
• Low Capex and Low Operating cost
• Minimal grind 200 to 650 micron
• Benign tails – potential commercial sand
• Benign waste
• Low water usage
• Re usable water
• No chemicals – no cyanide
• 23 fine gold
• Minimum tails to productivity
• No tails dam required – dry stack
19
VERTEX SUMMARY
• 100% ownership of Hill End gold production and exploration assets in HILL END NSW with historical gold
production more than 1.8 million oz gold from within our tenements
• Only 40 odd kms from Australia's largest gold mine - Cadia
• Planned high-grade gold production under the famous Hawkins Hill Mine
• Robust base case model for 2025 Gold production commencement
• Blue chip exploration ground in the Lachlan Fold Belt
• Old timers mined the full 30km length of Hill End tenements for 3500+ workings – And they only
scratched the surface. This is a BIG system
• Talented and dedicated operations team
• Proven Board & Management
20
CONTACT US
ACN - 650 116 153