Reward Gold Mine Production Update
Released
Released
Announcement PDF
ASX:VTX
ASX ANNOUNCEMENT 25 AUGUST 2025
ORE PRODUCTION UPDATE - FROM REWARD
UNDERGROUND GOLD MINE
Moving to high grade gold production
Operational Milestones
✓ Vertex is today pleased to announce first freshly blasted ore sourced from the first
two stoping blocks at the Reward Underground Mine.
✓ Ore is from development stripping (making ore drives larger for machine access) in
preparation for mechanised stoping operations.
✓ Reward ore will be processed via the Gravity Only gold processing plant located at
the entry to the mine.
✓ The material will start replacing feed from the low-grade surface ore stockpile, with
the aim of achieving 100% feed from higher grade underground ore sources over
the next few weeks.
✓ The underground electrical transformer is energised and 1,000 Volt power
reticulated underground.
✓ The Primary Ventilation Fan was commissioned on Thursday 21 August, giving
excitement to the Vertex Mining Team. Powered ventilation in the mine means
mining can start in earnest.
✓ 1550 Decline is dewatered, with first ore blasted.
✓ Vertex aims to have developed multiple mining fronts, with over around 400m of
strike, to achieve continuous feed to the plant.
Figure 1 – Long Section of stoping areas of initial focus.
1
Vertex Minerals is pleased to announce the commencement of development of the first two stope
blocks at the Reward Mine. Since commissioning the ventilation fan on Thursday 21 August, a total
of 500 tonnes of ore has been blasted and bogged to the Amalgamated portal for processing.
Underground broken stocks include 200 tonnes at 5.4g/t from the 1325 strip, while the remaining
300 tonnes is pending assay grades but from 1438 stope area and 1555 decline strip.
The Company is spreading initial production areas around 400 metres of strike length to provide
operational flexibility. Significant effort is underway setting up the 1720 stopes to the northern end
of the mine, primarily accessed from the 1555 Decline. The Company is focussed on initially mining
high grade ore, primarily from the Mica 1 and Mica 2 Veins. M1 and M2 are parallel veins and around
2m apart.
The Company is employing multiple mining methods to diversify risk and maximise head grade These
include airleg gallery and shrink stoping, jumbo cut and fill stoping and narrow vein longhole open
stoping.
Figure 2 – Jumbo bolting drill cuddy on Lady Belmore Vein.
2
Figure 3 - 110kW primary ventilation starting for the first time on 21 August.
Figure 4 – Truck being loaded with ore and hauled to processing plant.
3
This announcement has been approved by the Executive Chairman.
Further Information:
Roger Jackson, Executive Chairman
roger@vertexminerals.com.au
Tully Richards, Technical Director
tully@vertexminerals.com.au
Follow Vertex Minerals on LinkedIn
Vertex Minerals Limited
ASX Code: VTX
ABN: 68 650 116 153
Vertex Flagship project
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
Commenced gold processing in new Gekko gravity gold plant
100% owned mining operation
No hedge - no secured debt – fully funded
High grade gold resource and reserve 225 ozs at 16.7g/t + more
Inherited AU$25 million of underground development at Reward
1.8m Au ozs historic mining
Reward sits just under the historic Hawkins Hill mine - 435kozs at 309 g/t Au
Production has commenced on stockpiles.
Underground development is well underway.
Underground high-grade gold production commencing in weeks
Up to 95% recovery by gravity processes only
Big gold system – 25km + strike
4
Mineral Resource Estimate (MRE) for the Reward gold deposit at Hill End now stands at
419,000t at 16.72g/t Au for 225,200oz Au1:
Classification
Cut-off
Tonnes
Au (g/t)
Ounces
Indicated
4
141,000
15.54
70,500
Inferred
4
278,000
17.28
154,700
Total
4
419,000
16.72
225,200
Global Mineral Resource estimate for the Hill End & Hargraves Gold Project
Hill End Project Mineral Resource Estimate
Deposit
Classification
Tonnes
(kt)
Grade
Au (g/t)
Contained
Au (koz)
Reward Gold Mine
Indicated
Inferred
Sub Total
141
278
15.5
17.3
71
155
419
16.7
225
1,109
1,210
2.7
2.1
97
80
2,319
2.4
178
413
1,063
1.4
1.8
19
61
1,476
1.7
80
1,663
2,551
8.9
8.6
187
296
4,214
8.7
482
Hargraves Project
Indicated
Inferred
Sub Total
Red Hill Project
Indicated
Inferred
Sub Total
Project Total
Indicated
Inferred
Grand Total
COMPETENT PERSON’S STATEMENT
The information in this report that relates to Exploration Results and Exploration Targets is based on
information compiled by Mr. Roger Jackson, a Director and Shareholder of the Company, who is a 25+ year
Fellow of the Australasian Institute of Mining and Metallurgy (FAusIMM), Fellow of the Australian Institute of
Geoscientists (FAIG) and a Member of Australian Institute of Company Directors. Mr Jackson is the Executive
Chairman and a full-time employee of Vertex Minerals Limited (“Company”), and a shareholder of the
Company. Mr. Jackson has sufficient experience which is relevant to the style of mineralisation and type of
deposits under consideration and to the activity which he is undertaking to qualify as a Competent Person as
defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration results, Mineral Resources
and Ore Reserves”. Mr. Jackson consents to the inclusion of the data contained in relevant resource reports
used for this announcement as well as the matters, form and context in which the relevant data appear.
FORWARD LOOKING STATEMENTS AND IMPORTANT NOTICE
This report contains forecasts, projections and forward-looking information. Although the Company believes
that its expectations, estimates and forecast outcomes are based on reasonable assumptions it can give no
1
VTX ASX Announcement 21 June 2023.
5
assurance that these will be achieved. Expectations and estimates and projections and information provided
by the Company are not a guarantee of future performance and involve unknown risks and uncertainties, many
of which are out of Vertex Minerals’ control.
Actual results and developments will almost certainly differ materially from those expressed or implied.
Vertex Minerals has not audited or investigated the accuracy or completeness of the information, statements
and opinions contained in this announcement. To the maximum extent permitted by applicable laws, Vertex
Minerals makes no representation and can give no assurance, guarantee or warranty, express or implied, as
to, and takes no responsibility and assumes no liability for the authenticity, validity, accuracy, suitability or
completeness of, or any errors in or omission from, any information, statement or opinion contained in this
report and without prejudice, to the generality of the foregoing, the achievement or accuracy of any forecasts,
projections or other forward looking information contained or referred to in this report. Investors should
make and rely upon their own enquiries before deciding to acquire or deal in the Company’s securities.
JORC COMPLIANCE STATEMENTS
Where statements in this announcement refer to exploration results which previously been reported, the
Company confirms that it is not aware of any new information or data that materially affects the information
included in the original announcements, and in the case of estimates of Mineral Resources, that all material
assumptions and technical parameters underpinning the estimates in the relevant market announcements
continue to apply and have not materially changed. The Company confirms that the form and context in which
the Competent Persons’ findings are presented have not materially modified from the original market
announcements.
6