Updated Mineral Resource Estimate Reward Gold Mine
Released
Released
Announcement PDF
1
ASX ANNOUNCEMENT ASX: VTX
2 September 2026
UPDATED MINERAL RESOURCE ESTIMATE
REWARD GOLD MINE, HILL END — "Reward Resource Re-estimated at 146,900oz (16.68
g/t Au); Indicated Grade Up 36% to 21.17 g/t Au on Tighter Geological Model"
2023 MRE reassessed with detailed review which defines priority underground drill targets; no material change to the current
mine plan
HIGHLIGHTS
● Updated Mineral Resource Estimate (MRE) for the Reward Gold Mine completed by independent consultants HGS
Australia in accordance with the JORC Code (2012): 274,000 tonnes at 16.68 g/t Au for 146,900 ounces at a 4.0 g/t Au
lower cut-off.
● Indicated Mineral Resource of 80,000 tonnes at 21.17 g/t Au for 54,700 ounces — an increase in Indicated grade of 36%
over the June 2023 Indicated grade of 15.54 g/t Au.
● The proportion of contained ounces classified as Indicated has risen from 31% to 37%, reflecting improved geological
confidence from mine reconciliation, underground mapping and development exposure.
● Overall Resource grade is effectively unchanged at 16.68 g/t Au (June 2023: 16.72 g/t Au), confirming the high-grade
character of the deposit
● Total contained ounces have decreased by 35% from the 225,200 ounces reported in June 2023 (ASX announcement 21
June 2023). The reduction is attributable to two factors, described in detail below:
○ the application of a 200 g/t Au top-cut to a small number of extreme outlier assays, which the Competent Person
considers necessary to avoid over-estimation of grade in a coarse-gold system; and
○ a reduction in the number and size of interpreted lodes following mine reconciliation, underground mapping and
mine development, and recognition of the controlling structures, where certain lodes no longer meet the JORC Code
requirement for reasonable prospects for eventual economic extraction.
● Reported on an uncut basis, the estimate would be 276,000 tonnes at 21.57 g/t Au for 192,000 ounces. The difference
demonstrates the material influence of a small number of very high-grade samples, and the Company has elected to
report the more conservative top-cut estimate.
● There is no material change to the current mine plan, to the underground development schedule, or to the Company's
plan to bring the Reward Gold Mine to full production from October 2026. The lodes currently being developed and
stoped are unaffected.
● The re-interpretation has defined three priority underground drill target areas: depth extensions below the existing
Resource; remnant ultra-high-grade material in and around the historic Hawkins Hill mine directly above Reward; and
along strike to the south at Fosters.
● The Fosters Exploration Target previously reported by the Company (ASX announcement 29 August 2023) is unchanged
by this estimate: 524,000 tonnes at 12.5 g/t Au for 211,000 ounces (lower range) to 524,000 tonnes at 19.0 g/t Au for
321,000 ounces (upper range). Refer to the cautionary statement under “Fosters Exploration Target” below.
● Vertex plans to drill Fosters, which sits down strike to the south of, and below, the Reward Gold Mine. Fosters will be
accessed via the existing Fosters adit, which is only a few hundred metres down strike from the Hill End gravity gold plant.
● Underground diamond drilling is planned to commence in the first quarter of 2027. The move to 24-hour underground
operations approved on 20 August 2026 provides the operational capacity to establish a dedicated underground drilling
team
2
Overview
Vertex Minerals Limited (ASX: VTX) (“Vertex” or “the Company”) advises that it has completed a review of the 2023 Mineral
Resource Estimate for the Reward Gold Mine at its 100%-owned Hill End Gold Project in the Lachlan Fold Belt, NSW. The
estimate was prepared by independent consultants HGS Australia in accordance with the 2012 Edition of the Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code).
The June 2023 estimate was prepared before Vertex recommenced mining at Reward. Since that time the Company has
recommenced mining and has completed extensive underground mapping and face sampling, substantial underground
development that has physically exposed the mineralised structures, and — critically — reconciliation of material actually
mined and processed against the modelled tonnes and grade. This work has materially improved the geological understanding
of the deposit, and the updated estimate reflects that improved understanding rather than any change in the underlying gold
endowment of the Hill End field.
The result is a smaller but better-defined and higher-confidence domained resource, with a significantly higher Indicated
grade and a clearer structural framework from which to target future drilling.
Updated Mineral Resource Estimate
Classification Cut-off (g/t Au) Tonnes Au (g/t) Contained Au (oz)
Indicated 4.0 80,000 21.17 54,700
Inferred 4.0 194,000 14.76 92,200
Total 4.0 274,000 16.68 146,900
Table 1: Reward Gold Mine Mineral Resource Estimate, August 2026 (200 g/t Au top-cut, 4.0 g/t Au lower cut-off). Figures are rounded and may not
sum exactly. Mineral Resources are reported inclusive of any Ore Reserves; the Company has not declared an Ore Reserve for the Reward Gold Mine.
Comparison with the June 2023 estimate
Classification June 2023 (oz) August 2026 (oz) Change (oz) Change (%)
Indicated 70,500 54,700 -15,800 -22%
Inferred 154,700 92,200 -62,500 -40%
Total 225,200 146,900 -78,300 -35%
3
Classification June 2023 (oz) August 2026 (oz) Change (oz) Change (%)
Indicated grade (g/t Au) 15.54 21.17 +5.63 +36%
Total grade (g/t Au) 16.72 16.68 -0.04 0%
Table 2: Comparison of the August 2026 Mineral Resource Estimate with the estimate reported on 21 June 2023. Both estimates are reported at a
4.0 g/t Au lower cut-off.
Reasons for the change
Mine reconciliation
The single most significant change since June 2023 is that waste grades have been included in the block model waste blocks
in the waste outside the vein (0.18m wide) in the minimum mining width of 1m. Reward is now an operating mine. Vertex has
developed through the orebody, stoped from it and processed the material through the Gekko gravity plant, and has been
able to reconcile the tonnes and grade actually delivered against the tonnes and grade the resource model predicted.
Reconciliation of this kind is the most direct test available of a resource model. It measures the model against physical
production rather than against further estimation, and where the two diverge it identifies precisely which lodes and which
areas of the model are not performing as interpreted. That information is not obtainable from drilling alone, and it is the
principal reason the Competent Person has been able to constrain the 2026 interpretation with materially greater confidence
than was possible in 2023.
Re-interpretation of lodes and controlling structures
Vertex has conducted extensive mine reconciliation, underground mapping, underground mine development work and
recognition of the controlling structures
In practical terms, physical access to the orebody has allowed the Company to see the structures directly and help better
domaining. Several lodes interpreted in 2023 have been shown to be narrower, shorter or less continuous than modelled,
and have been reduced or removed from the estimate. Conversely, the lodes that remain are better constrained are showing
better reconciliation to milled grades.
Underground face sampling and further re-interpretation
The Competent Person has identified that a number of the more recent underground face samples do not fall within the
currently interpreted lode wireframes. A full re-interpretation of the lode geometry incorporating this face sampling data is
required has been completed internally but needs further independent assessment.
Investors should note that this further re-interpretation may result in changes to the Mineral Resource Estimate, in either
direction. The Company will report the outcome of that work to the market in accordance with its continuous disclosure
obligations.
Implications for the mine plan
The updated estimate does not result in any material change to the Company's current mine plan or to the underground
development and production schedule previously reported. The lodes presently being developed and stoped — including the
Mica Lense currently being mined from Decline 3 by mechanised longhole open stoping
The Company has not declared an Ore Reserve for the Reward Gold Mine. Statements in this announcement concerning the mine plan,
development schedule and future production are forward looking and are not based on an Ore Reserve estimate. Refer to the Forward-
Looking Statements notice at the end of this announcement.
Where this points the drill: three priority target areas
A principal objective of this work was to establish where Vertex should target future underground drilling at Reward. The
improved structural model has defined three priority areas:
1. Depth extensions below the existing Resource
The Reward lodes remain open at depth. The recognition of the controlling structures provides, for the first time, a predictive
framework for where those lodes should project below the currently modelled limits of the Resource. Historic mining across
the Hill End field rarely extended below the water table at approximately 60 feet (less than 20 metres), and only a limited
portion of the strike has been drilled to any significant depth.
4
2. Hawkins Hill remnants in the upper levels
The historic Hawkins Hill mine sits directly above the Reward workings and is among the highest-grade gold mines recorded
in Australia. The upper levels of the Vertex workings provide access to remnant material in and around those historic stopes
— blocks left behind by nineteenth-century mining methods that were unable to recover them selectively. The structural
work completed for this estimate improves the Company's ability to locate those remnants from underground drill platforms.
Historic production figures for the Hawkins Hill mine are historical records and are not reported as a Mineral Resource or Exploration Target
under the JORC Code. They are not necessarily indicative of the results that may be achieved at Reward.
3. Down strike to the south at Fosters
Fosters lies approximately 400 metres south of the Reward Gold Mine, sitting down strike to the south of and below the
Reward workings on the same structural corridor. It falls within ground already covered by Vertex Mining Licences and existing
Development Consent.
Fosters is accessed via the existing Fosters adit and development drive. The adit is only a few hundred metres down strike
from the Hill End gravity gold plant, meaning any material subsequently mined at Fosters would have a very short haul to
existing processing infrastructure. No new approvals are required to test Fosters from underground.
Fosters Exploration Target
The Exploration Target previously reported by the Company for Fosters (ASX announcement 29 August 2023) is unchanged
by this Mineral Resource Estimate and remains current. It was estimated by HGS Australia and is reported in accordance with
clause 17 of the JORC Code (2012).
Range Tonnes Au (g/t) Contained Au (oz)
Lower range 524,000 12.5 211,000
Upper range 524,000 19.0 321,000
Table 3: Fosters Exploration Target, as reported on 29 August 2023 and unchanged. The Exploration Target relates to the Amalgamated Lode only
and assumes a single lode to a maximum width of one metre; the estimate applies a bulk density of 2.7 t/m³ derived from the Reward resource
estimate, with 30% of the lode assigned a grade range of 30–40 g/t Au and the remaining 70% a grade range of 5–10 g/t Au. Multiple parallel lodes
are identifiable in the surface topography but are not included in the estimate.
The potential quantity and grade of the Exploration Target is conceptual in nature. There has been insufficient exploration to
define a Mineral Resource at Fosters, and it is uncertain whether further exploration will result in the determination of a Mineral
Resource. The Exploration Target is not being reported as part of any Mineral Resource or Ore Reserve estimate.
Underground drilling programme
Vertex plans to commence underground diamond drilling at Reward in the first quarter of 2027.
The approval for 24-hour underground operations granted by Bathurst Regional Council on 20 August 2026 (ASX
announcement 20 August 2026) is central to this. Available working hours at the mine increase from approximately 9 hours
per day to up to 22 hours per day. That additional development capacity allows the Company to cut dedicated drill cuddies
and platforms underground without displacing ore development from the production schedule — something that has not
been practical under the previous restricted operating hours.
Drilling from underground platforms is materially more effective than surface drilling at Reward: holes are shorter, better
oriented to the steeply dipping lodes, and can be positioned to test the depth extensions, the Hawkins Hill remnants and the
Fosters corridor from close range.
Drilling at Fosters
Vertex plans to drill Fosters as part of this programme. Fosters sits down strike to the south of and below the Reward Gold
Mine and will be accessed via the existing Fosters adit, a few hundred metres down strike from the Hill End gravity gold plant.
Because the adit and development drive are already in place and the ground is covered by existing Mining Licences and
Development Consent, the target can be drilled without new approvals or new surface disturbance.
The objective of drilling at Fosters is to test the Exploration Target described above with the aim of converting some or all
of it to a Mineral Resource. There is no certainty that drilling will result in the determination of a Mineral Resource at
Fosters.
5
Hill End & Hargraves Project Mineral Resource Estimate
Deposit Classification Tonnes (kt) Au (g/t) Contained Au (koz)
Reward Gold Mine Indicated 80 21.2 55
Inferred 194 14.8 92
Sub Total 274 16.7 147
Hargraves Project Indicated 1,109 2.7 97
Inferred 1,210 2.1 80
Sub Total 2,319 2.4 178
Red Hill Project Indicated 413 1.4 19
Inferred 1,063 1.8 61
Sub Total 1,476 1.7 80
Project Total Indicated 1,602 3.3 171
Inferred 2,467 2.9 233
Grand Total 4,069 3.1 404
Table 4: Global Mineral Resource Estimate for the Hill End & Hargraves Gold Project incorporating the updated Reward estimate. Hargraves and Red
Hill figures are unchanged from those reported on 21 June 2023. Figures are rounded and may not sum exactly.
This announcement has been approved for release to the ASX by the Board of Vertex Minerals Limited.
FURTHER INFORMATION
Telephone +61 2 7229 4849 or by email at info@vertexminerals.com.au
Bruce McInnes, Executive Chairman
Roger Jackson, Executive Director
Jim Simpson Executive Director
Tully Richards, Director
MINERAL RESOURCE STATEMENT AND COMPETENT PERSON’S STATEMENTS
Mineral Resources
The Mineral Resource estimates in this announcement are classified in accordance with the Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves (JORC Code, 2012). The information in this announcement that
relates to the Mineral Resource Estimate for the Reward Gold Mine is based on, and fairly represents, information and
supporting documentation compiled by Mr Andrew Hawker of HGS Australia. Mr Hawker is a Member of the Australasian
Institute of Mining and Metallurgy and a Member of the Australian Institute of Geoscientists. Mr Hawker has sufficient
experience that is relevant to the style of mineralisation and type of deposit under consideration, and to the activity being
undertaken, to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves. Mr Hawker consents to the inclusion in this announcement of the
matters based on his information in the form and context in which it appears.
The Mineral Resource has been classified as Indicated and Inferred. The classification was considered appropriate based on
drill hole spacing, sample intervals, geological interpretation, underground mapping, development exposure, mine
reconciliation data, and the representativeness of all available assay and density data. The Indicated classification reflects
increased confidence in geological and grade continuity in those areas exposed by underground development and supported
by mine reconciliation. The Inferred classification reflects lower confidence in short-range grade estimation in the model.
Competent Person's Statement
Information that relates to the Exploration Target for the Fosters deposits is based upon information reviewed by Mr Andrew
Hawker, a Competent Person who is a member of The Australasian Institute of Mining and Metallurgy. Mr Hawker is an
6
independent consultant to Vertex Limited. Mr Hawker has sufficient experience that is relevant to the style of mineralisation
and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in
the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr
Hawker consents to the inclusion in the report of the matters based on his information in the form and context in which it
appears.
Mining and production information
The information in this announcement that relates to mining and production results and to the mine plan is based on
information compiled by Mr Roger Jackson, a Director and Shareholder of the Company, who is a 25+ year Fellow of the
Australasian Institute of Mining and Metallurgy (FAusIMM), Fellow of the Australian Institute of Geoscientists (FAIG) and a
Member of Australian Institute of Company Directors. Mr Jackson is an Executive Director and a full-time employee of Vertex
Minerals Limited (“Company”), and a shareholder of the Company. Mr. Jackson has sufficient experience which is relevant to
the style of mineralisation and type of deposits under consideration and to the activity which he is undertaking to qualify as
a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration results, Mineral
Resources and Ore Reserves”. Mr. Jackson consents to the inclusion of the data contained in relevant resource reports used
for this announcement as well as the matters, form and context in which the relevant data appear.
Previously reported information
This announcement refers to information extracted from previous market announcements, including the Mineral Resource
Estimate reported on 21 June 2023 and the Fosters Exploration Target reported on 5 July 2023 and 29 August 2023, together
with the announcements of 20 August 2026 and 25 August 2026. Those announcements are available at
www.vertexminerals.com.au and on the ASX platform under code VTX. The Company confirms that it is not aware of any new
information or data that materially affects the information included in those original market announcements, and that all
material assumptions and technical parameters underpinning the Exploration Target in those announcements continue to
apply and have not materially changed. The Mineral Resource Estimate reported on 21 June 2023 is superseded by the
estimate reported in this announcement.
FORWARD LOOKING STATEMENTS AND IMPORTANT NOTICE
This announcement contains forecasts, projections and forward-looking information, including in relation to the Company’s
mine plan, development schedule, production plans, planned drilling programmes and exploration potential. Although the
Company believes that its expectations, estimates and forecast outcomes are based on reasonable assumptions, it can give
no assurance that these will be achieved. Expectations, estimates, projections and information provided by the Company are
not a guarantee of future performance and involve unknown risks and uncertainties, many of which are out of Vertex
Minerals’ control. Statements in this announcement regarding future production, development rates and operating outcomes
are not production targets and are not based on an Ore Reserve estimate.
Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. The Inferred Mineral Resource
reported in this announcement has a lower level of confidence than an Indicated Mineral Resource and must not be converted
to an Ore Reserve. There is no certainty that further exploration work will result in the determination of Indicated Mineral
Resources, or that the production and economic assumptions applied will be realised.
Actual results and developments will almost certainly differ materially from those expressed or implied. Vertex Minerals has
not audited or investigated the accuracy or completeness of the information, statements and opinions contained in this
announcement. To the maximum extent permitted by applicable laws, Vertex Minerals makes no representation and can give
no assurance, guarantee or warranty, express or implied, as to, and takes no responsibility and assumes no liability for, the
authenticity, validity, accuracy, suitability or completeness of, or any errors in or omission from, any information, statement
or opinion contained in this announcement, including as to the achievement or accuracy of any forecasts, projections or other
forward-looking information. Investors should make and rely upon their own enquiries before deciding to acquire or deal in
the Company’s securities.
7
JORC CODE, 2012 EDITION — TABLE 1
Reward Gold Mine Mineral Resource Estimate, August 2026
Section 1: Sampling Techniques and Data
Criteria JORC Code explanation Commentary
Sampling techniques Nature and quality of sampling; measures taken
to ensure sample representivity; aspects material
to the Public Report, including coarse gold
sampling problems.
• Diamond drilling — variable sample length
depending on vein thickness. Quartz veining was
half-cored by diamond saw except where veining
was isolated and narrow. Core cut down the long
axis with the same relative portion sampled for each
interval. A few centimetres of wall rock around the
vein(s) were routinely included to ensure the
footwall and hanging wall were left intact. Reverse
circulation drilling — samples collected over 1m
intervals via a cyclone and split to 3kg. Face
sampling — approximately 8kg of representative
vein material taken by a geologist from the face;
only quartz vein material sampled, with two or more
samples collected where two or more veins are
present. Face spacing approximately 1.75m,
generally every second face sampled, giving
approximately 3.5m sample spacing. Gold at Hill End
is coarse and nuggety; this is a recognised sampling
challenge and is addressed through screen fire assay
and Leachwell methods and through top-cutting
(see Section 3).
Drilling techniques Drill type and details including core diameter,
orientation method.
• Diamond drilling — surface holes NQ3 or HQ3;
underground holes LTK48. Core oriented using the
Ballmark method. Reverse circulation — generally
130mm face sampling bits with diamond core tails
through mineralised zones.
Drill sample recovery Method of recording and assessing recoveries;
relationship between recovery and grade.
• Diamond drilling — total core recovery averaged
>99%, average RQD 75%. RC — bags weighed prior
to sub-sampling; no RC intervals intercepted
mineralisation. No apparent relationship between
sample recovery and grade.
Logging Whether samples have been logged to a level of
detail supporting Mineral Resource estimation;
qualitative or quantitative; core photography.
• Core laid out with base-of-hole line marked for
orientation; artificial breaks marked. Geotechnical
logging captured recovery, RQD, fracture frequency
and orientation quality. Holes logged in detail for
alteration, lithology, structure, vein style and
mineralisation, recorded digitally and transferred to
the database. High-quality digital photographs
available for all recent core Since June 2023, VTX
has relogged historical drillholes in Vulcan ISIS using
core and underground photography, new
underground mapping, original logs and LiDAR
scans, correcting vein names, intervals and mis-
positioned collars. Underground vein intercepts
have been surveyed by VTX for verification.
• VTX underground face/channel sampling (from
early 2025) is logged within predefined structural
domains, recording position relative to reverse-
fault/vein intersections.
• Logging is both qualitative and quantitative and is
considered appropriate to support Mineral
Resource estimation.
Sub-sampling techniques
and sample preparation
Whether core cut or sawn, quarter/half/all core;
sample preparation; QC procedures;
representivity.
• Core cut down the structural long axis with the same
relative portion of half core always sampled. Sample
intervals, true vein thickness, angle of vein to core
axis and vein composition recorded. For screen fire
assay, each sample was weighed, dried and
pulverised in its entirety in an LM2 to P85 −75
micron. For Leachwell digestion, approximately 1kg
samples were weighed, dried, crushed and
pulverised to 85% passing −75 micron. Sample sizes
are appropriate for the grain size of the material
8
Criteria JORC Code explanation Commentary
sampled. No systematic collection of field duplicate
or second-half sampling was recorded.
Quality of assay data and
laboratory tests
Nature, quality and appropriateness of assaying
and laboratory procedures; QAQC procedures,
standards, blanks, duplicates; levels of accuracy
and precision.
• Historical: pre-January 2007, screen fire assay at
ALS Chemex Orange; from January 2007, SGS
accelerated cyanide leach (Leachwell, method
LWL69M) with fire-assay finish; bottle tails >10 g/t
were fire assayed and >50 g/t screen fire assayed to
capture coarse gold. Methods are considered total
and appropriate.
• Historical accuracy and precision are considered
established: 1,117 laboratory duplicate pairs
returned a correlation coefficient of 99%; HARD
analysis shows 76% of pairs within ±15% for
samples >0.1 g/t (target 70%); quartz-flush checks
contributed a negligible ~0.002 g/t; CRM control
charts were within laboratory tolerance.
• Since 2025, nearly all VTX samples have been
submitted to SGS Orange for Photon Assay, which is
well suited to coarse, nuggety gold. For the first
several months of the programme, one in ten
samples was also submitted to ALS Orange for
comparative fire assay (CFA).
• The photon-vs-CFA comparison (Section 6.3)
confirms acceptable accuracy and precision is
established for the photon-assay dataset and
method going forward.
• VTX is still developing the QAQC program for
current sample submissions to SGS. Random
duplicates are re-submitted to test lab instrument
drift and repeatability.
Verification of sampling
and assaying
Verification of significant intersections; use of
twinned holes; documentation of data entry and
verification; adjustments to assay data.
• The database was validated for overlapping
intervals, hole-depth compatibility and collar
elevations against surface survey, with visual trace
checks; no issues were identified.
• Closely spaced/twinned diamond-hole pairs were
compared to confirm short-range grade continuity
(e.g. CZUG06 vs CZUG06R at 1.8 m separation;
HHUG103 vs HHUG101 at 5.7 m); holes <10 m apart
were assessed and found satisfactorily similar for
estimation. No new drilling has been completed
since June 2023, so no additional twinned holes
were available for the 2026 dataset.
• VTX data are entered to Excel and uploaded to the
SQL database via automated import with internal
validations (restricted codes, automated
overlap/duplicate checks, unique sample IDs);
relogging corrections were re-imported through the
same process.
• No adjustment has been made to assay data other
than the top-cut described in Section 3.
Location of data points Accuracy and quality of surveys used to locate drill
holes, trenches and other locations used in the
estimate; specification of the grid system; quality
and adequacy of topographic control.
• Surface drill collars were located by differential GPS
and underground collars by total station;
underground samples were taped from survey
stations generally <20 m apart. Hole paths were
surveyed by downhole gyro or Eastman single-shot
camera at 30 m and then every 50 m.
• VTX has captured detailed underground LiDAR
scans and surveyor pick-ups to verify development,
face-sample and collar positions.
• Historical data are on MGA94 Zone 55. For the
2026 model, coordinates were converted from
GDA94 to GDA2020 (Zone 55) using GDAL, with the
original coordinates retained in the database at a
lower ranking.
• Survey accuracy and topographic control are
considered appropriate for Mineral Resource
estimation.
9
Criteria JORC Code explanation Commentary
Data spacing and
distribution
Data spacing for reporting of Exploration Results;
whether spacing and distribution is sufficient to
establish geological and grade continuity
appropriate for the Mineral Resource
classification applied; whether sample
compositing has been applied.
• Drillhole intercept spacing averages ~10–40 m
along strike and ~10–20 m down dip, with
underground fans giving intercepts as close as ~2 m
down dip; downhole sample intervals range 0.10–
5.25 m (average ~0.5 m).
• Underground face sampling was collected at ~1.75
m face spacing, generally every second face (~3.5
m, rarely 5.4 m).
• Compositing: raw intervals were flagged from
interpreted wireframe solids and composited by
domain using the straight down-hole method; the
composite database is attached as Appendix F.
• Data spacing within the priority blocks (Blocks 1
and 2) is considered sufficient to establish
geological and grade continuity appropriate for the
Indicated and Inferred classifications applied.
Orientation of data in
relation to geological
structur
Share your feedback
Discover