Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ABN 68 650 116 153
ASX ANNOUNCEMENT
31 July 2023
QUARTERLY ACTIVITIES REPORT
FOR THE PERIOD ENDED 30 JUNE 2023
HIGHLIGHTS FOR QUARTER
§
An updated Mineral Resource Estimate for the Reward Gold Mine at the Hill End Gold
Project was carried out by independent consultants HGS Australia, in accordance with
the guidelines set in the 2012 JORC Code.
§
Mineral Resource Estimate (MRE) for the Reward gold deposit at Hill End now stands
at 419,000 tonnes at 16.72g/t Au for 225,200oz Au:
Classification
Cut-off
Tonnes
Au (g/t)
Ounces
Indicated
4
141,000
15.54
70,500
Inferred
4
278,000
17.28
154,700
Total
4
419,000
16.72
225,200
§
A conceptual mine plan for the mine is currently being developed which will provide
the basis for a scoping study.
§
Inspection of the Hill End Underground Mine (i.e. Amalgamated Adit and associated
640 Level drives, cross-cuts and stopes together with the Reward Shaft/Alimak) with
confirmation that areas earmarked for future access are in good working order after
the mine was put on ‘care and maintenance’ in 2011.
§
Hill End gravity gold processing plant refurbishment advanced near completion, with
fully permitted Mining licence and DA in place for Plant, Stockpiles and the Reward
underground mine.
§
Trench sampling provided confirmation of gold in additional stockpiles at Hawkins Hill.
Sampling of the Process Plant Stockpile, Talis Dam Road Stockpile and Consolidated
Pad revealed that each contained gold.
Vertex Minerals Ltd Quarterly Activities Report – June 2023
RESOURCE UPGRADE – REWARD GOLD MINE
During the quarter, Vertex completed an updated Mineral Resource Estimate (MRE) for the
Reward gold deposit at its 100%-owned Hill End gold project near Orange in the NSW Lachlan
Fold belt (refer ASX Announcement 26 June 2023). The MRE was carried by independent
consultants HGS Australia in accordance with 2012 JORC Code
The upgraded Mineral Resource for the Reward Gold Mine now totals 419,000 tonnes, with
a 278kt Inferred Resource and a 141kt Indicated Resource, at a weighted average grade of
16.72 g/t Au for 225,200oz(154,700oz Inferred and 70,500oz Indicated). This brings the global
Mineral Resource estimate for the Hill End & Hargraves Gold Project to 485,000 ounces at 3.6
g/t (refer Table 1). Whilst the total contained gold is similar to the previous estimate,
improved interpretation of the deposit geology reflects the quality of ore that was previously
processed at Hill End:
Deposit
Hill End Project Mineral Resource Estimate
Classification
Tonnes
Grade
(kt)
Au (g/t)
Contained
Au (koz)
Reward Gold Mine
Indicated
Inferred
Sub Total
141
278
15.5
17.3
71
155
419
16.7
225
1,109
1,210
2.7
2.1
97
80
2,319
2.4
178
413
1,063
1.4
1.8
19
61
1,476
1.7
80
1,663
2,551
3.5
3.6
187
296
4,214
3.6
483
Hargraves Project
Indicated
Inferred
Sub Total
Red Hill Project
Indicated
Inferred
Sub Total
Project Total
Indicated
Inferred
Grand Total
Table 1
The Reward gold mine is well-placed for a simple start-up, with the existing gravity processing
plant being located adjacent to the underground mine access point. The mine access point
extends into the resource, so little development is likely to be required. The Hill End gravity
gold processing plant refurbishment is also near completion, with full permits including a
tailings dam permit which has the capacity to allow immediate commencement of operations.
Page 2 of 14
Vertex Minerals Ltd Quarterly Activities Report – June 2023
HAWKINS HILL
HIGHLIGHTS
§
Vertex has been actively assessing all potential ore sources for processing feed stock.
As announced by the Company on 27 April 2023, trench sampling of the Process Plant
Stockpile, Tails Dam Road Stockpile & Consolidated Pad revealed each contains gold
§
The Process Plant Stockpile & Tails Dam Road Stockpile are located within 70m-90m of
the Company’s Gold Gravity Plant while the Consolidated Pad is located < 1km further
up the valley
§
Domains of waste versus mineralisation are evident resulting in higher grade zones;
§
Process Plant Stockpile averages 1.26g/t Au across 24 samples with a max gold value of
5.50g/t Au
o
Tails Dam Road Stockpile averages 2.10g/t Au across 15 samples with a max gold
value of 12.20g/t Au; and
o
Consolidated Pad averages 0.89g/t Au across 20 samples with a max gold value of
6.74g/t Au
§
Grade estimation of stockpiles can be difficult due to their random nature and can only
truly be determined by processing a bulk sample. Vertex plans to run a bulk sample
through the Hill End Gravity Plant, where previous recoveries exceeded 95%.
§
Refurbishment of the Plant continues with the testing and rewinding of electrical
motors on crushing and processing equipment. The Company anticipates that within
the next month this refurbishment work will have been completed such that the plant
will be ready for wet commissioning
§
Vertex has prioritised the assessment of open pittable and Underground gold
mineralisation on the Company’s Mining Leases, to provide follow-on feed for the plant.
Page 3 of 14
Vertex Minerals Ltd Quarterly Activities Report – June 2023
RED HILL
HIGHLIGHTS
§
Resource, Pit & Mining Schedule optimisation underway & reflect recent drilling & high
gold price
§
Mining Licence Application (“MLA”) studies well underway & include:
•
Stakeholder engagement
▪
Landowner (the Crown)
▪
Bathurst Regional Council § Community, including
▪
Future employees
•
Total Water Management (incl. >10yrs bore monitoring)
•
Dust monitoring/benchmarking
§
Additional studies earmarked for completion
§
Red Hill ore is amenable to gravity processing & it is expected that ore could be trucked
and treated through the Hill End Gravity Gold Plant (refer ASX Announcement 30
November 2015).
§
The Hill End Gravity Gold Plant is near readiness for commissioning with historic stockpile
feed
§
Additional resource targets exist along strike, to the north of the existing Red Hill resource
and at depth (see figure 1.).
§
Importantly, the new interpretation of mineralisation has defined a significant target for
future drilling, as the interpreted feeder zone structure and its stacked stockworks have
not been tested.
Following works carried out during the quarter, the Vertex directors are now satisfied that
Red Hill Gold Project is viable as a stand-alone project.
Page 4 of 14
Vertex Minerals Ltd Quarterly Activities Report – June 2023
The project plan includes a first phase of two shallow open pits. The ore will be hauled from
Red Hill to the Hawkins Hill gravity processing plant and infrastructure located at Hill End.
Previous metallurgical test work on oxide, transition and primary material from Red Hill has
confirmed that a high recovery of gold is achievable with simple gravity processing at a coarse
grind and without the use of cyanide. This is similar processing performance to the Hill End
and Hargraves deposits, which only require gravity processing to achieve ~90% recovery of
gold. (Hill End Gold Announcement 30th November 2015). Consequently the processing
plant, power requirements and infrastructure are expected to have significantly lower capital
cost and environmental impact when compared with other orebody types. The Company’s
existing gravity processing plant located at Hill End is amenable to expansion to cater for the
Red Hill feed.
Successive past drilling campaigns continued to discover new en echelon vein sets at depth
and wide mineralised quartz ‘bedded’ stockwork zones have been intersected in the White’s,
Red Hill and Marshall McMahon areas. There is potential to extend the resource in several
locations immediately adjacent to the resource at depth and along strike. Additional shallow
resource extensions are expected in the Red Hill area, such as at the Western Line of
mineralisation.
Page 5 of 14
Vertex Minerals Ltd Quarterly Activities Report – June 2023
Figure 1. Red Hill future targets, note the ‘visible gold’ intersections reported on 21 September
2022 occur outside the initial resource area.
Page 6 of 14
Vertex Minerals Ltd Quarterly Activities Report – June 2023
SUBSEQUENT EVENTS
•
Conclusion of internal studies on the Reward Underground Gold Mine (Reward Gold
Mine or Reward), which strongly support the undertaking of a Pre – Feasibility study
(PFS)
•
Vertex have engaged Ground Control Engineering (GCE) to undertake the PFS. GCE
conducted a site visit in July 2023 and the PFS is expected to be completed in Q3
2023.
•
Completion of a fully-underwritten rights issue of shares and free-attaching options,
first announced on 19 May 2023 (Rights Issue). The Rights Issue closed on 10 July
2023. The Company subsequently issued a total of 10,463,961 fully paid ordinary
shares (Shares) and 5,232,057 options exercisable at $0.25 each, with an expiry date
of 17 July 2026. The Company is now working together with the underwriter to
finalise allocations in respect of the remaining underwritten shortfall securities, which
may be placed at the discretion of the Board within 3 months of the close of the
Rights Issue but are expected to be issued in the coming weeks.
CORPORATE & FINANCIAL
As at 30 June, 2023, the Company held A$596k in cash (which does not include any rights issue
proceeds).
Vertex’s expenditure during the Quarter was as follows:
Item
A$ (‘000s)
Cash Balance at beginning of Quarter
$1,115
Administration and Corporate Costs (including capital(146)
raising expenses)
Exploration and Evaluation
(235)
Investments in Property Plant and Equipment
(138)
Cash Balance at End of Quarter
$1,115
During the quarter, the Company made payments of approximately $140,000 to related parties in
relation to Directors’ fees and consulting fees for both technical and management services.
Page 7 of 14
Vertex Minerals Ltd Quarterly Activities Report – June 2023
Appendix 1 – Additional ASX Information
Listing Rule 5.3.4 Use of funds
VTX was admitted to trading on the ASX on 12 January 2022. The 30 June 2023 quarter is
included in a period covered by a Use of Funds statement in a prospectus lodged with ASX
under Listing Rule 1.a, condition 3. A comparison of the Company’s expenditure against the
estimated Use of Funds statement is set out below as required under Listing Rule 5.3.4.
Expenditure item
Exploration at the
projects
Cash reimbursement
to project vendors
Expenses of the offer
Administration costs
Department of
Regional NSW –
bonds transfer
Working capital
Note
1
2
1
3
Use of
Funds
(2 years)
$
Actual to 30 June
2023
(excluding GST)
$
Variance
$
2,420,000
2,313,022
(106,978)
617,759
650,000
1,060,000
617,759
795,065
1,194,555
145,065
134,555
185,000
887,241
5,820,000
185,000
113,863
5,219,264
(773,378)
(600,736)
Note:
1. The Use of Funds statement covers a 2 year period whereas current actual
expenditure covers the period since incorporation. Expenditure items are budgeted
to be incurred over the full 2 year period with expenditure on exploration at the
projects only occurring post listing.
2. Legal fees, shareholder engagement and administration fees were higher than
anticipated in the offer.
3. VTX has concentrated exploration activities to date at the projects included in the
prospectus.
Page 8 of 14
Vertex Minerals Ltd Quarterly Activities Report – June 2023
TENEMENT INFORMATION (LISTING RULE 5.3.3)
Tenements acquired or disposed during the Quarter
N/A
Mining tenements held at the end of the Quarter
Tenement
Project
Status
Area
LOCATION
EL 5868
EL 6996
EL 8289
EL 9247
EL 9413
GL 5846
Hill End
Hargraves
Hill End
Hill End
Hill End
Hill End
Renewal Pending
Renewal Pending
Current
Current
Current
Current
16 Units
6 Units
1 Unit
2 Units
1 Unit
2.044 ha
NSW
NSW
NSW
NSW
NSW
NSW
ML 49
ML 50
ML 315
ML 316
ML 317
ML 913
ML 914
ML 915
ML 1116
ML 1541
ELA 6466
EPL 12008
E77/2651
E 63/2058
ELA 6466
EPL 12008
Hill End
Hill End
Hill End
Hill End
Hill End
Hill End
Hill End
Hill End
Hill End
Hill End
Hill End South
Hill End
Pride of Elvire
Taylors Rock
Hill End South
Hill End
Current
Current
Current
Current
Current
Renewal Pending
Renewal Pending
Renewal Pending
Current
Current
Application Pending
Issued
Current
Current
Application Pending
Issued
1.618 ha
3.02 ha
6.671 ha
8.846 ha
7 ha
22 ha
21.69 ha
13.27 ha
15.71 ha
279.2 ha
30 Units
51km2
57km2
30 Units
-
NSW
NSW
NSW
NSW
NSW
NSW
NSW
NSW
NSW
NSW
NSW
WA
WA
-
Interests may be held directly by the Company, a subsidiary, or contractually.
Farm-in or Farm-out Agreements entered into during the Quarter
N/A
Beneficial Percentage Interests Held in Farm-in or Farm-out agreements at the end of the Quarter
N/A
Page 9 of 14
Vertex Minerals Ltd Quarterly Activities Report – June 2023
Page 10 of 14
Vertex Minerals Ltd Quarterly Activities Report – June 2023
ABOUT VERTEX
Hill End NSW:
• 14km of Continuous gold lode
• Gold recovers to gravity at +90%
• Most of the line of lode only mined to the water table
• The Hill End Gold project consists of 10 mining leases & 4 Exploration licenses located in the
core of the Hill End Trough on the eastern Lachlan Fold Belt.
• The area was first recognised as a gold centre in 1851 with a number of mining operations
established over the following 50 years
• Modern exploration has not been completed and a program of multi-element and alteration
mapping has been planned to better map out the zones of high-grade mineralisation.
• Recent completion of a full geological review of the Hill End Gold Project and an updated
geological model - expected to underpin a new exploration campaign
• Largest Gold Specimen ever to be found globally found at Hill End
• Gravity Plant on site
• Fully permitted Gravity processing licence
Hargraves NSW:
• Hargraves Gold project is located approximately 25km south of the town of Mudgee.
• The goldfield is 4 x 10 km with numerous mineralised structures with little modern
exploration.
• An updated mineral resource in accordance with JORC 2012 Code was completed by SRK
Consulting (Australasia) Pty Ltd (SRK).
• The Board will prioritise the development of this project by updating PFS, permitting and
further drilling to increase resources.
Taylor Rock WA:
•
•
The Taylor Rock Project is located 80km WSW of Norseman in the Southern Goldfields region
of Western Australia
The project has both Gold and Nickel potential, interesting historical intercepts include:
•
•
•
12NLJC0005: 2m @ 0.795% Ni from 202m
12NLJC004: 2m @ 0.636% Ni from 250m
10NLJC0132: 37m @ 0.477% Ni from 205m
§ Including 1m @ 1.02% Ni from 212m
• 1m @ 0.835%Ni from 206m
• 1m @ 0.822% Ni from 209m
Page 11 of 14
Vertex Minerals Ltd Quarterly Activities Report – June 2023
•
•
• 1m @ 0.766% Ni from 205m
LJPR0084: 3m @ 0.649%Ni from 15m
LJPA0145:
§ 1m @45.4g/t Au from 44m
§ 3m @ 9.84g/t Au from 42m
Pride of Elvire WA:
• The tenements surround the Mt. Elvire homestead approximately 210km north of Southern
Cross in Western Australia.
• Encouraging historical gold results include:
Significant Historical Intercepts from Drilling for Gold:
•
•
ME 30: 10m @ 23.2g/t Au from 17m
ME 22: 2.45m @ 9.29g/t Au from 0m
• ME 31: 1m @ 144g/t Au from 15m
• ME 21: 2.14m @ 1.77g/t Au from 0m
Significant Historical Rock chip results:
•
•
•
•
•
•
•
•
6754220mN, 757460mE: 215.3g/t Au
6754220mN, 757460mE: 179.7g/t Au
6759560mN, 757500mE: 43g/t Au
6759700mN, 757300mE: 30g/t Au
6756500mN, 757120mE: 24.4g/t Au
6759560mN, 757500mE: 14.5g/t Au
6756500mN, 757120mE: 5.42g/t Au
6756500mN, 757120mE: 3.33g/t Au
To learn more, please visit: www.vertexminerals.com
Stay up to date with the latest news by connecting with VTX on LinkedIn and Twitter.
Competent Persons Statement
The information in this report that relates to the Reward Mineral Resource estimate is based on information
compiled by Mr. Troy Lowien, who is a full-time employee of Groundwork Plus. Mr. Lowien is a member of the
Australasian Institute of Mining and Metallurgy (FAusIMM), and has sufficient experience which is relevant to
the style of mineralisation and type of deposits under consideration and to the activity which he is undertaking
to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of
Exploration results, Mineral Resources and Ore Reserves”. Mr. Lowien consents to the inclusion of the data
contained in relevant resource reports used for this announcement as well as the matters, form and context in
which the relevant data appears.
The information in this report that relates to Exploration Results, Exploration Targets and the Hargraves and Red
Hill Resource Estimates is based on information compiled by Mr. Roger Jackson. Mr. Jackson is a Director and
Shareholder of the Company, who is a Fellow of the Australasian Institute of Mining and Metallurgy (FAusIMM),
Fellow of the Australasian Institute of Geoscientists and a Member of Australian Institute of Company Directors.
Mr. Jackson has sufficient experience which is relevant to the style of mineralisation and type of deposits under
consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012
Page 12 of 14
Vertex Minerals Ltd Quarterly Activities Report – June 2023
Edition of the “Australasian Code for Reporting of Exploration results, Mineral Resources and Ore Reserves”. Mr.
Jackson consents to the inclusion of the data contained in relevant resource reports used for this announcement
as well as the matters, form and context in which the relevant data appears.
JORC Compliance Statements
This website contains references to Mineral Resource estimates, which have been extracted from previous ASX
announcements as set out above made by Peak Resources Ltd (ASX:PUA), the parent company of VTX prior to
the Company’s separate listing in 2022. For full details of Exploration Results in this release that have been
previously announced, refer to those announcements.
The Company confirms that it is not aware of any new information or data that materially affects the information
included in the said announcements, and in the case of estimates of Mineral Resources, that all material
assumptions and technical parameters underpinning the estimates in the relevant market announcements
continue to apply and have not materially changed. The Company confirms that the form and context in which
the Competent Persons’ findings are presented have not materially modified from the original market
announcements.
Forward Looking Statements and Important Notice
This report contains forecasts, projections and forward-looking information. Although the Company believes that
its expectations, estimates and forecast outcomes are based on reasonable assumptions it can give no assurance
that these will be achieved. Expectations and estimates and projections and information provided by the
Company are not a guarantee of future performance and involve unknown risks and uncertainties, many of which
are out of Vertex Minerals’ control.
Actual results and developments will almost certainly differ materially from those expressed or implied. Vertex
Minerals has not audited or investigated the accuracy or completeness of the information, statements and
opinions contained in this announcement. To the maximum extent permitted by applicable laws, Vertex Minerals
makes no representation and can give no assurance, guarantee or warranty, express or implied, as to, and takes
no responsibility and assumes no liability for the authenticity, validity, accuracy, suitability or completeness of,
or any errors in or omission from, any information, statement or opinion contained in this report and without
prejudice, to the generality of the foregoing, the achievement or accuracy of any forecasts, projections or other
forward looking information contained or referred to in this report.
Investors should make and rely upon their own enquiries before deciding to acquire or deal in the Company’s
securities.
Authorised for release by the Board of Vertex Minerals Ltd:
On behalf of the Directors
Roger Jackson
Executive Chairman
31 July 2023
Vertex Minerals Ltd ABN 68 650 116 153
Unit 38, 460 Stirling Highway
Peppermint Grove
WA 6011
PO Box 8770
Orange
NSW 2800
Phone +61 (0) 8 6383 7828
Email: info@vertexminerals.com.au
Page 13 of 14
Vertex Minerals Ltd Quarterly Activities Report – June 2023
Page 14 of 14
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Vertex Minerals Ltd
ABN
Quarter ended (“current quarter”)
68 650 116 153
30 June 2023
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date (12
months)
$A’000
-
-
(4)
(105)
(b) development
-
-
(c) production
-
-
(d) staff costs
-
-
(113)
(422)
(a) exploration & evaluation
(e) administration and corporate costs
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
-
-
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(117)
(527)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
(138)
(138)
(d) exploration & evaluation
(231)
(2,151)
(e) investments
-
-
(f)
-
-
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date (12
months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(369)
(2,289)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
-
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
(33)
(6)
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
(33)
(36)
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
1,115
3,448
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(117)
(527)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(369)
(2,289)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
(33)
(36)
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
Current quarter
$A’000
Year to date (12
months)
$A’000
4.5
Effect of movement in exchange rates on
cash held
-
-
4.6
Cash and cash equivalents at end of
period
596
596
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
596
1,115
5.2
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
596
1,115
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
58
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
82
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
6.1 Payment of director fees in accordance with disclosed consulting agreements
6.2 Payment to directors of additional consulting fees associated with exploration and
evaluation activities on terms consistent with the disclosed consulting agreements.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
(117)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(231)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(348)
8.4
Cash and cash equivalents at quarter end (item 4.6)
596
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
596
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
1.7
$A’000
-
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: Yes
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer:
Yes. The Company has announced a fully underwritten rights issue to raise $1.67million.
The rights issue closed on 10 July 2023.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer:
Yes.
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
.31 July 2023..................................................................................
Authorised by: ...Alex Neuling................................................................................
(Name of body or officer authorising release – see note 4)
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4.
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”.
5.
If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CE
Share your feedback
Discover