Reward Gold Mine - Resource Upgrade paves way for PFS
Released
Released
Announcement PDF
Reward Gold Mine: Mineral Resource Upgrade
paves way for Pre-Feasibility Study at Hill End
ASX ANNOUCEMENT 6TH JULY 2023
HIGHLIGHTS:
• Reward Underground Gold Mine (Reward Gold Mine or Reward) Internal Studies
concluded and strongly support undertaking a Pre – Feasibility study (PFS).
• Vertex have engaged Ground Control Engineering (GCE) to undertake the PFS, with site
visit underway this week.
• PFS expected to be completed in Q3 2023.
• An updated Mineral Resource Estimate (MRE) for the Reward Gold Mine was recently
carried out by independent consultants HGS Australia, in accordance with the guidelines
set in the 2012 JORC Code.
• MRE for Reward now stands at 419,000 tonnes at 16.72g/t Au for 225,200oz Au:
Classification
Cut-off
Tonnes
Au
(g/t)
Ounces
Indicated
4
141,000
15.54
70,500
Inferred
4
278,000
17.28
154,700
Total
4
419,000
16.72
225,200
• The Reward Gold Mine is considered well-placed for a simple start-up.
• Vertex’s gravity processing plant (Vertex Gravity Plant) is located adjacent to the
underground mine access point. (Amalgamated Adit).
• The Amalgamated Adit extends to the resource areas, so only stripping and refurbishment
development is expected to be required.
• Second egress in place with ladderway and motorised Alimak conveyance.
• Some underground fleet and utility services already in place.
• Vertex Gravity Plant refurbishment near completion.
• Mining Licence and existing Development Approval (DA) in place for Plant, Stockpiles, Tails
Storage Facility (TSF) and the Reward Gold Mine.
• Permitted TSF has capacity to accommodate immediate re-commencement of
operations.
• Directors are presently on-site inspecting works associated with the refurbishment
of the processing plant.
• Stockpile processing to commence this month.
Vertex Minerals Limited (ASX:VTX) (“Vertex” or the “Company”) is pleased to advise the
commencement of work on a Pre-Feasibility Study (PFS) for a high-grade gold operation at the
Reward Gold Mine, Hill End NSW.
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
Executive Chairman, Roger Jackson commented: “The commitment to the Pre-Feasibility Study
for a high-grade operation at Hill End is a tremendous endorsement of the project and its
potential to deliver substantial value to shareholders. We remain committed to the goal of
becoming a gold producer which sits within the envelope of highly prospective bonanza grade
gravity recoverable gold. Once mining, we plan to be drilling these very exciting targets we have
down plunge from the famous Hawkins Hill Mine. My fellow Directors have been integrally
involved in the mining review to date, and will form an integral part of the transformation to a
gold producer”
Deposit
Hill End Project Mineral Resource Estimate
Classification
Tonnes
Grade
(kt)
Au (g/t)
Contained
Au (koz)
Reward Gold Mine
Indicated
Inferred
Sub Total
141
278
15.5
17.3
71
155
419
16.7
225
1,109
1,210
2.7
2.1
97
80
2,319
2.4
178
413
1,063
1.4
1.8
19
61
1,476
1.7
80
1,663
2,551
4,214
3.5
3.6
3.6
187
296
483
Hargraves Project
Indicated
Inferred
Sub Total
Red Hill Project
Indicated
Inferred
Sub Total
Project Total
Indicated
Inferred
Grand Total
Table 1: Global Mineral Resource estimate for the Hill End & Hargraves Gold Project
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
Image 1: On-site workers in Amalgamated Adit/640L mine access point for the Reward gold
mine
Image 2: Refurbishment work underway at the processing plant
This announcement has been approved by the Board of Vertex Minerals Limited.
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
Further Information:
Roger Jackson
Executive Chairman
roger@vertexminerals.com.au
Tully Richards
Technical Director
tully@vertexminerals.com.au
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
About Vertex Minerals Limited
Vertex Minerals Limited (ASX: VTX) is an Australian based gold exploration company developing its advanced
Hargraves and Hill End gold projects located in the highly prospective Eastern Lachlan Fold Belt of Central West NSW.
Other Company assets include the Pride of Elvire gold project and Taylors Rock gold/nickel/lithium project both
located in the Eastern Goldfields of WA. The focus of Vertex Minerals is to advance the commercial production of
gold from its NSW projects embracing an ethical and environmentally sustainable approach:
•
•
•
•
•
Gravity Separation: The deportment of gold at the Hill End Project allows high recovery to a concentrate
produced using gravity separation techniques.
Direct Smelting: The use of direct smelting of a gold concentrate that eliminates the need to use cyanide
as a solvent.
Contrast in Density: These separation techniques take advantage of the contrast in density of gold (ρ=19.3)
relative to quartz (ρ=2.65).
Renewable Energy Potential: The unique landscape and infrastructure makes Hill End ideal for the
establishment of renewable sources of power. The Crudine Ridge Windfarm is only 30km from the project
site and Vertex plans to examine a pumped hydro-electricity scheme as an integral part of any proposed
development. The topography and existing mine workings including shafts and adits make the
establishment of a pumped hydro scheme achievable at modest expense.
Benign Tailings: The tailings will essentially be quartz with little to no sulphide minerals.
Hargraves Gold Project (NSW)
• Hargraves Gold project is located approximately 2 5 km south of the town of Mudgee.
• The goldfield is 4 x 10 km with numerous mineralised structures with little modern exploration.
• An updated mineral resource in accordance with JORC 2012 Code was completed by SRK Consulting
(Australasia) Pty Ltd (SRK) – total of 2.3Mt at 2.38g/t Au for 177koz Au.
Hill End Gold Project (NSW)
• Consists of 10 mining leases and three Exploration Licences located in the core of the Hill End Trough on
the eastern Lachlan Fold Belt.
• 14km of continuous gold lode with gold recovery rate to gravity at +90%.
• Work undertaken in 2015 by Hill End Gold Limited (HEG) culminated in a JORC 2012 resource estimate of
80,000 oz Au @ 1.7 g/t to 150m depth.
Pride of Elvire Gold Project (WA)
•
•
Tenements surround the Mt. Elvire homestead approximately 210km north of Southern Cross in Western
Australia
The project has seen historical drilling with encouraging gold results achieved.
Taylors Rock Project (WA)
• Located 80km WSW of Norseman in the Southern Goldfields region of Western Australia.
• The project has both Gold and Nickel potential, interesting historical intercepts have recorded encouraging
mineralisation.
MINERAL RESOURCE STATEMENT
The resource estimates are classified in accordance with the Australasian Code for Reporting of Identified Mineral
Resources and Ore Reserves (JORC, 2012). The Reward estimate was completed by Andrew Hawker of HGS Australia.
Mr Hawker has sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition
of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Hawker
consents to the inclusion in the report of the matters based on his information in the form and context in which it
appears. The resource is classified as Inferred. The classification was considered appropriate based on drill hole
spacing, sample intervals, geological interpretation and representativeness of all available assay and density data.
The classification reflects the low confidence in short range grade estimations in the model.
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
Competent Persons Statement
The information in this report that relates to Exploration Results and Exploration Targets is based on information
compiled by Mr. Roger Jackson, a Director and Shareholder of the Company, who is a 25+ year Fellow of the
Australasian Institute of Mining and Metallurgy (FAusIMM), Fellow of the Australian Institute of Geoscientists (FAIG)
and a Member of Australian Institute of Company Directors. Mr. Jackson has sufficient experience which is relevant
to the style of mineralisation and type of deposits under consideration and to the activity which he is undertaking to
qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration
results, Mineral Resources and Ore Reserves”. Mr. Jackson consents to the inclusion of the data contained in relevant
resource reports used for this announcement as well as the matters, form and context in which the relevant data
appears.
Forward Looking Statements and Important Notice
This report contains forecasts, projections and forward-looking information. Although the Company believes that its
expectations, estimates and forecast outcomes are based on reasonable assumptions it can give no assurance that
these will be achieved. Expectations and estimates and projections and information provided by the Company are
not a guarantee of future performance and involve unknown risks and uncertainties, many of which are out of Vertex
Minerals’ control.
Actual results and developments will almost certainly differ materially from those expressed or implied. Vertex
Minerals has not audited or investigated the accuracy or completeness of the information, statements and opinions
contained in this announcement. To the maximum extent permitted by applicable laws, Vertex Minerals makes no
representation and can give no assurance, guarantee or warranty, express or implied, as to, and takes no
responsibility and assumes no liability for the authenticity, validity, accuracy, suitability or completeness of, or any
errors in or omission from, any information, statement or opinion contained in this report and without prejudice, to
the generality of the foregoing, the achievement or accuracy of any forecasts, projections or other forward looking
information contained or referred to in this report.
Investors should make and rely upon their own enquiries before deciding to acquire or deal in the Company’s
securities.
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
JORC Code, 2012 Edition – Table 1 report template
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
Sampling
techniques
Drilling
techniques
JORC Code explanation
Commentary
• Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools appropriate
to the minerals under investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
• Aspects of the determination of mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1
m samples from which 3 kg was pulverised to produce a 30 g charge
for fire assay’). In other cases more explanation may be required,
such as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (eg
submarine nodules) may warrant disclosure of detailed information.
• Diamond drilling – Variable sample length depending on vein
thickness. Quartz veining was half-cored by diamond saw except
where veining was isolated and narrow. Core cut down long axis with
same relative portion of sampled for each interval. Routinely a few
centimetres of wall rock around the vein(s) were included in the
sample to ensure that the vein footwall and hanging wall were left
intact. Sampling of wall rock carried out adjacent to high grade
intervals to test for peripheral mineralization with minimal values
returned.
• Reverse Circulation Drilling – Samples collected over 1m intervals via
a cyclone and split to 3kg samples for submission to the laboratory.
The only RC holes that intercepted the mineralised domains
interpreted in this estimate have diamond core tails through the
mineralised intervals.
• Face Sampling - Face samples were approximately 8kgs of
representative vein material taken by a geologist from the face. Only
quartz vein material was sampled, with two or more samples
collected if two or more veins are present. The distance between
faces is approximately 1.75m and generally every second face was
sampled giving approximately 3.5m sample spacing or rarely a 5.4m
sample spacing
• Diamond Drilling – Surface diamond drill holes were either NQ3 or
HQ3 in size whereas underground drill holes were LTK48. Core was
oriented using the Ballmark method.
• Drill type (eg core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple
or standard tube, depth of diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by what method, etc).
•
Reverse Circulation Drilling – RC holes were generally 130mm
diameter face sampling bits with diamond core tails through
mineralized zones.
Criteria
Drill sample
recovery
Logging
JORC Code explanation
Commentary
• Method of recording and assessing core and chip sample recoveries
and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
• Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.
• Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
• Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
• The total length and percentage of the relevant intersections logged.
• Diamond Drilling - Core recovery (total core recovery) averaged
>99% and the average RQD was 75%.
• Reverse Circulation Drilling – Bag containing the 1m sample intervals
were weighed prior to sub-sampling. No RC intervals intercepted
mineralisation therefore recovery not an issue.
• There is no apparent relationship between sample recovery and
grade.
• Core was laid out in an angle iron with a base of hole line marked for
core orientation. All artificial core breaks were marked by red
chinagraph crosses. The core also had metre marks, tray and hole
numbers marked in chinagraph pencil prior to digital photography.
Geotechnical logging was completed with recovery, rock quality
designation (RQD), fracture frequency and orientation quality digitally
recorded in Excel spreadsheets. Core was logged for geological and
geotechnical parameters, with data collected digitally and transferred
directly to the database. Holes were logged in detail for alteration,
lithology, structure, vein style and mineralisation by geologists with
data being plotted and interpreted on section during drilling. High
quality digital photographs are available for all recent core.
• Reverse Circulation Drilling – RC holes logged for lithology, colour,
structure, alteration, mineralisation, weathering & oxidation, and vein
quartz characteristics. As field staff sampled each hole the following
information was recorded: Hole Name, Sample Name, Interval,
Sample date, sampler name(s), Sample Mass, and sample moisture.
This data was subsequently digitally recorded in Excel spreadsheets.
Subsampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether quarter, half or all core
taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
• For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
• Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
• Measures taken to ensure that the sampling is representative of the in
• Diamond Drilling - Core was cut down the structural long axis and the
same relative portion of half core was always sampled. Sample
intervals, true vein thickness, angle of vein to core axis and vein
composition were recorded.
For screen fire assays each core sample was submitted to the
laboratory, weighed, dried, and then pulverised in its entirety in an
LM2 to a P85 of -75 microns. For Leachwell digestion methods
sample protocol involved drill core samples of approximately 1kg
weighed, dried, crushed and pulverised in an LM2 (removable-bowl
Criteria
Quality of
assay data
and
laboratory
tests
JORC Code explanation
Commentary
situ material collected, including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of the material
being sampled.
pulveriser) to 85% passing -75 micron.
• Reverse Circulation Drilling - RC drilling: dust samples were collected
in a side-mounted cyclone and dumped into large plastic bags
annotated with the Hole Number and the interval depth. The bags
were stacked in order at each site. A wet sample was frequently
encountered at the water table. In all cases the water was able to be
controlled and only a few samples were damp in the entire program.
This is probably due to free draining old workings below the area of
RC drilling. After weighing on a floor scale, each sample was
carefully passed through a cradle riffle splitter by 2 field assistants
sufficient to produce a ~3kg sample for dispatch to the laboratory.
• Sample sizes are appropriate for the grain size of the material being
sampled.
• No systematic collection of field duplicate or second half sampling
was recorded.
• Prior to January 2007 all HEGL core samples were analysed by the
screen fire assay technique at the ALS Chemex Laboratory in
Orange, NSW. Each core sample was submitted to the laboratory,
weighed, dried, and then pulverised in its entirety in an LM2 to a P85
of -75 microns. The entire sample was weighed and wet screened
using -75 micron disposable nylon screen. The +75 micron fraction
was dried in aluminium trays, weighed and fire assayed to extinction.
The -75 micron fraction was collected using flocculant, the liquor then
decanted and the fines sample dried in an oven. This was
homogenised in the LM2, weighed and fire assayed in duplicate using
a 50 g charge. The assays for the -75 micron fraction were averaged
and a weighted average is calculated with the +75 micron fraction.
• In January 2007, drill core samples entered the production stream at
SGS Labs-Townsville and were assayed for gold by accelerated
cyanide leach using “Leachwell” reagent with fire assay finish.
Sample protocol involved drill core samples of approximately 1kg
weighed, dried, crushed and pulverised in an LM2 (removable-bowl
pulveriser) to 85% passing -75 micron followed by a quartz flush.
Both quartz flush and the sample were inserted in a Leachwell bottle
filled with water and a predetermined number of Leachwell tablets.
The containers were rolled for 24 hours whereupon the liquor was
• The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is considered
partial or total.
• For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.
• Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels
of accuracy (ie lack of bias) and precision have been established.
Criteria
JORC Code explanation
Commentary
•
•
•
•
•
homogenous and a subsample is extracted for fire assay. For
assays greater than 10g/t, bottle tails were washed filtered and fire
assayed. For assays greater than 50g/t, bottle tails were washed
filtered and screen fire assayed. This additional protocol ensured
coarse gold that may not have been dissolved in the accelerated
cyanide leach process was captured.
For HEGL, Reverse Circulation drilling produced 1 metre samples
which initially were all submitted for fire assay with any intervals
returning elevated gold being re-assayed by screen fire assay. PostDecember 2005, RC samples containing quartz were assayed by
screen fire assay. After January 2007 RC samples were assayed by
Leachwell methods.
Assay techniques are considered total and appropriate for the
mineralisation style.
There is no documentation of the systematic collection of field
duplicates or use of Certified Reference Material during the various
drilling and sampling programs to monitor the precision and accuracy
of the assay results. Instead, previous companies relied on the
quality control procedures of the laboratory undertaking the sample
assays to verify accuracy and precision.
Each sample assayed by screen fire assay method had a duplicate
50g firing from the -75 micron fraction.
The ALS Chemex QC protocol required that each batch of 50
samples analysed included a reagent blank, 3 replicate
determinations and 2 standard materials [Certified Reference
Material]. Samples exhibiting anomalous values (high or low) were
routinely analysed using either the original pulp or a second split. All
routine replicate analyses were reported to the client.
During the analytical sample preparation stage, crushing and grinding
equipment was flushed with barren quartz material between each
sample. The quartz flush sample was stored, which could later be
analysed to test for contamination or “loss of grade”.
Review of results of the lab’s internal QAQC results, indicate an
acceptable level of accuracy and precision has been established for
the drilling results.
Previous reporting on internal laboratory accuracy and precision has
Criteria
Verification
JORC Code explanation
Commentary
• The verification of significant intersections by either independent or
not raised any significant issues.
• The lack of QC at the sample collection stage is not considered to be
a significant problem with the data from the deposit, as reconciliation
of mined grades to model grades during trial production were within
acceptable tolerances for an area of Paxtons vein mined and
processed in 2008. Comparison of the estimated Mineral Resource
and mill production to the end of June 2009 revealed a gold content
reconciliation of 104%. .
• The drilling database was validated for overlapping sample intervals,
alternative company personnel.
compatibility of hole depths between database tables as well as collar
of sampling
• The use of twinned holes.
elevations compared to surface surveys and visual checks of drill hole
and
• Documentation of primary data, data entry procedures, data
traces in Surpac. No issues were found.
assaying
verification, data storage (physical and electronic) protocols.
• Discuss any adjustment to assay data.
Location of
data points
• Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations
used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
•
There are a number of drill holes that have intercepted mineralisation
within relatively close proximity to each other and these drill holes
have been investigated. Holes located less than 10m apart were
assessed and found to have satisfactory levels of similarity and
acceptable to be used in Resource estimation.
• The majority of surface drill holes were surveyed using differential
GPS and underground holes surveyed by underground total station
methods.
• Underground sample locations were located using a tape from the
nearest underground survey station which were generally less than
20m apart.
• Holes paths were surveyed using a downhole gyro or an Eastman
single shot down-hole camera at 30 metres (or at the end of reverse
circulation pre-collars) and then every 50 metres to the end of holes.
• The level of accuracy for drill hole locations is considered appropriate
for Resource estimation purposes.
• This Resource estimate was undertaken using Zone 55 of the MGA94
grid coordinate system.
• A reasonably detailed surface topographic survey was supplied. This
Resource estimate is not impacted by surface topography as the
uppermost extents of the mineralised domains occur between 60m
and 100m below the surface.
Criteria
Data spacing
and
distribution
Orientation
of data in
JORC Code explanation
Commentary
• Data spacing for reporting of Exploration Results.
•
• Whether the data spacing and distribution is sufficient to establish the
and around 10m to 20m in the dip direction. Underground drill fans
degree of geological and grade continuity appropriate for the Mineral
have resulted in intercepts as close as 2m apart in the dip direction.
Resource and Ore Reserve estimation procedure(s) and
classifications applied.
• Whether sample compositing has been applied.
•
• Whether the orientation of sampling achieves unbiased sampling of
•
•
Down hole sampling intervals vary from 10cm to 5.25m with an
average of 0.5m.
The data spacing and distribution is sufficient to establish grade
continuity appropriate for the Mineral Resource estimation
procedures and classifications applied.
No sample compositing was carried out prior to analysis.
Holes were drilled in an orientation to ensure sampling was
possible structures and the extent to which this is known, considering
undertaken, as close as possible, orthogonal to the strike and dip of
the deposit type.
the mineralised vein packages. This orientation achieves the least
relation to
• If the relationship between the drilling orientation and the orientation
geological
of key mineralised structures is considered to have introduced a
structure
Drill hole intercept spacing averages around 10m to 40m along strike
sampling bias, this should be assessed and reported if material.
• The measures taken to ensure sample security.
biased sample interval.
•
All samples were collected and sub-sampled on site by company
Sample
staff. Samples were submitted to the external laboratory using
security
standard paperwork and delivered by company staff.
Review of QAQC data by Snowden (2006) showed moderate to high
• The results of any audits or reviews of sampling techniques and data.
•
Audits or
variability in laboratory duplicate data, mainly in the lower grades
reviews
•
(<0.1g/t), but would not have a major impact on the global grade of
the resource.
HEG personnel undertook audits of the ALS laboratory in Orange
and the SGS laboratories in West Wyalong and Townsville with no
issues discovered that may have a negative impact on sample
preparation or analysis.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
Mineral
tenement and
land tenure
status
Exploration
done by other
parties
Geology
Drill hole
Information
JORC Code explanation
Commentary
• Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.
• The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
• The project is located within granted Exploration Licence EL5868
Mining leases ML1541, ML1116, ML315, ML316, ML317, ML49,
ML50, ML913, ML914, ML915 and GL5846 with the earliest expiry
date of 19 January 2033. The leases are held by Vertex Minerals Pty
Ltd.
• First Tiffany Resources Corporation is registered as having a 15%
free carried interest in EL5868.
• The site is covered by EPL 12008, scheduled activity is mining for
minerals.
• Modern exploration of the Hill End goldfield has been carried out by
various companies since the early 1980’s using surface and
underground mapping and sampling, geophysical investigations,
diamond and reverse circulation drilling. Previous exploration
appears to have been performed to industry standards.
• Mineralisation at the Reward deposit occurs within a series of
bedding parallel quartz veins occurring along the limbs of the Hill End
Anticline which is located in the mid-Silurian to mid-Devonian Hill End
Trough containing sedimentary and volcanic rocks. The deposit is
best described as a brittle, thrust-dominated, competency-controlled
orogenic gold low sulphide system developed post ductile
deformation.
• There are approximately 3,800 separate drill holes and face sample
locations used in the estimate and tabulation of the information would
be cumbersome. A summary of all relevant drill hole and face sample
information in this report is considered not to be material to the
understanding of the report.
• Acknowledgment and appraisal of exploration by other parties.
• Deposit type, geological setting and style of mineralisation.
• A summary of all information material to the understanding of the
exploration results including a tabulation of the following information
for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
• If the exclusion of this information is justified on the basis that the
Criteria
Data
aggregation
methods
JORC Code explanation
•
•
•
Relationship
between
mineralisation
widths and
intercept
lengths
Diagrams
Balanced
reporting
Other
substantive
exploration
data
Further work
•
•
•
•
•
•
information is not Material and this
Share your feedback
Discover