On 23 June 2023 Vertex Minerals Limited (ASX: VTX, Company) released an announcement
entitled “Resource Upgrade, 225,200oz at 16.72g/t Au for the Reward Gold Mine at Hill End”
(Announcement).
The Company is now releasing a replacement version of the Announcement incorporating:
•
•
Additional technical information concerning the resource estimate in the body of the
Announcement to ensure compliance with ASX Listing Rule 5.8.1; and
A correction to the “Project Total” estimated grades in Table 1 on Page 2 of the
Announcement. Upgraded resource figures for the Reward Resource itself are
unchanged.
Authorised for release by Alex Neuling, Company Secretary.
Vertex Minerals Limited
ASX Code: VTX
ABN: 68 650 116 153
Unit 38, 460 Stirling Hwy
Peppermint Grove
WA 6011
Resource Upgrade: 225,200oz at 16.72g/t Au for the
Reward Gold Mine at Hill End
ASX ANNOUCEMENT 22ND JUNE 2023 (REPLACEMENT 26TH JUNE 2023)
HIGHLIGHTS:
•
An updated Mineral Resource Estimate for the Reward Gold Mine at the Hill End Gold Project was
recently carried out by independent consultants HGS Australia, in accordance with the guidelines
set in the 2012 JORC Code.
•
Mineral Resource Estimate (MRE) for the Reward gold deposit at Hill End now stands at 419,000
tonnes at 16.72g/t Au for 225,200oz Au:
Classification
Cut-off
Tonnes
Au (g/t)
Ounces
Indicated
4
141,000
15.54
70,500
Inferred
4
278,000
17.28
154,700
Total
4
419,000
16.72
225,200
•
Total contained gold is similar to the previous estimate, but improved interpretation of the deposit
geology reflects higher grade and more resource in the Indicated category.
•
A conceptual mine plan for the mine is currently being developed which will provide the basis for
a scoping study.
•
The Reward gold mine is well-placed for a simple start-up:
•
•
•
•
The existing gravity processing plant is located adjacent to the underground mine access point
Mine access point extends into the resource, so little development is required.
Second egress in place with ladder way and motorised Alimak conveyance.
Some underground fleet and utility services already in place.
•
Hill End gravity gold processing plant refurbishment near completion.
•
Permitted Mining licence and DA in place for Plant, Stockpiles and the Reward underground mine.
•
Permitted tailings dam has capacity to allow immediate commencement of operations.
•
Directors are presently on site inspecting works associated with the refurbishment of the
processing plant.
Vertex Minerals Limited (ASX:VTX) (“Vertex” or the “Company”) is pleased to advise that it has
completed an updated Mineral Resource Estimate (MRE) for the Reward gold deposit at its 100%-owned
Hill End gold project near Orange in the NSW Lachlan Fold belt. The MRE was carried by independent
consultants HGS Australia in accordance with 2012 JORC Code
The upgraded Mineral Resource for the Reward Gold Mine now totals 419,000 tonnes, with a 278kt
Inferred Resource and a 141kt Indicated Resource, at a weighted average grade of 16.72 g/t Au for
225,200oz (154,700oz Inferred and 70,500oz Indicated). This brings the global Mineral Resource estimate
for the Hill End & Hargraves Gold Project to 485,000 ounces at 3.6 g/t (refer Table 1).
Whilst the total contained gold is similar to the previous estimate, improved interpretation of the deposit
geology reflects the quality of ore that was previously processed at Hill End.
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
Executive Chairman, Roger Jackson commented: “We are very excited by this updated resource as it is
the next step towards moving the Reward high-grade gold mine into production. We now plan to
undertake a scoping study of the Reward project. The Vertex team is actively working towards
commissioning the Gravity gold plant, to firstly treat the nearby stockpiles, and then move onto the
Reward high grade feed. We are also confident of significantly expanding these high-grade ounces at
Reward when we commence mining, with a dedicated underground diamond drilling rig.”
Deposit
Hill End Project Mineral Resource Estimate
Classification
Tonnes
Grade
(kt)
Au (g/t)
Contained
Au (koz)
Reward Gold Mine
Indicated
Inferred
Sub Total
141
278
15.5
17.3
71
155
419
16.7
225
1,109
1,210
2.7
2.1
97
80
2,319
2.4
178
413
1,063
1.4
1.8
19
61
1,476
1.7
80
1,663
2,551
4,214
3.5
3.6
3.6
187
296
483
Hargraves Project
Indicated
Inferred
Sub Total
Red Hill Project
Indicated
Inferred
Sub Total
Project Total
Indicated
Inferred
Grand Total
Table 1: Global Mineral Resource estimate for the Hill End & Hargraves Gold Project
Image 1: On-site workers in Amalgamated Adit/640L mine access point for the Reward gold mine with
clean floors, good quality ground works and service pipes, all in very good condition
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
GEOLOGY
The Hill End Project is located within the Palaeozoic Lachlan Fold Belt and is hosted within the mid- Silurian
to mid-Devonian Hill End Trough, a north-south trending elongated pull-apart basin containing
sedimentary and volcanic rocks.
The Hill End Anticline plunges to the north at approximately 10° in the Hill End area. The strata have a
maximum dip on the limbs of the fold of about 60°. Local reversals of dip occur where small drag folds
are developed on the limbs of the main structure. A well-developed axial plane cleavage strikes 170° and
dips 80° on the eastern limb of the anticline. A weak sub-vertical foliation, which trends at approximately
115° and pre-dating the axial plane cleavage is observed locally. A crenulation cleavage post-dating the
axial plane cleavage is also developed. A number of sub-vertical small-scale faults, which show reversE or
oblique slip movement were encountered during mining on the eastern limb. These faults strike at
approximately right angles to the fold axis and have lateral displacements up to 0.8m. They were referred
to as “cross-courses” by the early miners.
Image 2: Local Geology
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
SAMPLING TECHNIQUES
Generally all quartz veining was sampled by diamond saw except where veining was isolated and narrow.
Routinely a few centimetres of wall rock around the vein(s) were included in the sample to ensure that
the vein footwall and hanging wall were left intact. Core was cut down the structural long axis and the
same relative portion of half core was always sampled. Some intervals of strong fracture fill and
disseminated sulphides were also sampled. Sample intervals, true vein thickness, angle of vein to core
axis and vein composition were recorded. Minimum sample length is approximately 5cms, and maximum
sample length was restricted to approximately 30cms so that the sample will fit in one 1kg pulveriser.
Wall rock between samples without quartz veining was typically not assayed. Sampling of wall rock
adjacent some of the highest-grade intervals drilled to date was carried out to test for peripheral
mineralization. Minimal values were returned giving confidence to the premise that the gold is restricted
to quartz veining.
DRILLING METHODS
Drilling has been undertaken over a strike length of about 1.3km with most holes concentrated in area of
about 500m along strike. Holes have been collared on the surface and from underground drill cuddies.
A total of 289 holes have been drilled into the Reward deposit for a totalling 27,636m of drilling, of which
75% was completed using diamond drilling (DDH), 11% reverse circulation (RC) and 14% RC collar with
DDH tail. Drill hole intercept spacing averages around 10m to 40m along strike and around 10m to 20m
in the dip direction. Underground drill fans have resulted in intercepts as close as 2m apart in the dip
direction. Surface diamond drill holes were either NQ3 or HQ3 in size whereas underground drill holes
were LTK48. RC drill holes were generally 130mm diameter.
RESOURCE CLASSIFICATION
The Resource has been classified as Indicated and Inferred with the key parameters considered during the
resource classification being:
•
Geological knowledge and interpretation.
•
Deposit style.
•
Confidence in the sampling and assay data.
•
The spacing of the exploration drill holes.
•
Interpolation search pass.
•
Prospects for eventual economic extraction.
•
Continuity of mineralisation based on underground sampling and drilling information.
The exploration data used for the Reward estimate is robust and appropriate for resource estimation
purposes, with the current data spacing sufficient to generate robust mineralisation interpretations. The
geology of the project area has been studied in detail over numerous years, providing confidence in the
interpretation of mineralisation style. Historical mining records give further confidence in the existence
of economic mineralisation.
Prospects for eventual economic extraction are high as the deposit is partly developed, the gold is easily
beneficiated using simple methods and there is an existing processing plant on site.
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
SAMPLE ANALYSIS
Prior to January 2007 all core samples were analysed by the screen fire assay technique at the ALS Chemex
Laboratory in Orange, NSW. Each core sample was submitted to the laboratory, weighed, dried, and then
pulverised in its entirety in an LM2 to a P85 of -75 microns. The entire sample was weighed and wet
screened using -75 micron disposable nylon screen. The +75 micron fraction was dried in aluminium trays,
weighed and fire assayed to extinction. The -75 micron fraction was collected using flocculant, the liquor
then decanted and the fines sample dried in an oven. This was homogenised in the LM2, weighed and
fire assayed in duplicate using a 50 g charge. The assays for the -75 micron fraction were averaged and a
weighted average is calculated with the +75 micron fraction.
From January 2007, drill core samples entered the production stream at SGS Labs-Townsville and were
assayed for gold by accelerated cyanide leach using “Leachwell” reagent with fire assay finish. Sample
protocol involved drill core samples of approximately 1kg weighed, dried, crushed and pulverised in an
LM2 (removable-bowl pulveriser) to 85% passing -75 micron followed by a quartz flush. Both quartz flush
and the sample were inserted in a Leachwell bottle filled with water and a predetermined number of
Leachwell tablets. The containers were rolled for 24 hours whereupon the liquor was homogenous and a
subsample is extracted for fire assay. For assays greater than 10g/t, bottle tails were washed filtered and
fire assayed. For assays greater than 50g/t, bottle tails were washed filtered and screen fire assayed. This
additional protocol ensured coarse gold that may not have been dissolved in the accelerated cyanide leach
process was captured.
Reverse Circulation drilling produced 1 metre samples which initially were all submitted for fire assay with
any intervals returning elevated gold being re-assayed by screen fire assay. Post- December 2005, RC
samples containing quartz were assayed by screen fire assay. After January 2007 RC samples were
assayed by Leachwell methods.
ESTIMATION METHODOLOGY
Geological interpretations were conducted in cross-section based on the identification of existing
underground drives and stopes plus zones continuous high-grade mineralisation in parallel lodes. The
minimum lode width was 1m as requested by Vertex in creating a diluted mining resource. Sections were
mostly on 10m north south spacings in the main model area and lode end extensions were set out 5m.
Assay results were composited to 0.25 metre intervals.
Grade interpolation used Ordinary Kriging (OK) as the preferred algorithm. Kriging prevents outlier
smoothing within the search parameters using mathematical inputs derived from the variography. A
second interpolation using inverse distance squared (ID2) was conducted as a quality control to compare
a simple algorithm to a complex algorithm.
A subcell block model was created using Surpac software with a parent cell size of 10m x 1m x 4m (North,
East & Elevation) with a subcell size of 2.5m x 0.25m x 1m.
RESOURCE CUTOFF GRADE USED
The Mineral Resource has been reported using a lower cut-off grade of 4 g/t Au. This grade reflects the
underground mining method and relatively low cost processing method and is consistent with previous
estimates.
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
METALLURGY
The mineralogy of the Hill End gold mineralisation is relatively simple with most gold being of high fineness
and hosted within quartz veins with low sulphide content.
Preliminary metallurgical testing by Metcon Laboratories Brookvale NSW, indicated that the gold is coarse
and free milling. Testing has determined that 98% of the contained gold is liberated and recoverable at a
P80 grind size of 670 microns.
The gravity separation plant on site achieved a 95% recovery rate. During 2009 a total of 12,591 tonnes
of ore at a grade of 15.9g/t was processed producing 5,871 ounces of gold.
Image 3: Refurbishment work underway at the processing plant
This announcement has been approved by the Board of Vertex Minerals Limited.
Further Information:
Roger Jackson
Executive Chairman
roger@vertexminerals.com.au
Tully Richards
Technical Director
tully@vertexminerals.com.au
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
About Vertex Minerals Limited
Vertex Minerals Limited (ASX: VTX) is an Australian based gold exploration company developing its advanced
Hargraves and Hill End gold projects located in the highly prospective Eastern Lachlan Fold Belt of Central West NSW.
Other Company assets include the Pride of Elvire gold project and Taylors Rock gold/nickel/lithium project both
located in the Eastern Goldfields of WA. The focus of Vertex Minerals is to advance the commercial production of
gold from its NSW projects embracing an ethical and environmentally sustainable approach:
•
•
•
•
•
Gravity Separation: The deportment of gold at the Hill End Project allows high recovery to a concentrate
produced using gravity separation techniques.
Direct Smelting: The use of direct smelting of a gold concentrate that eliminates the need to use cyanide
as a solvent.
Contrast in Density: These separation techniques take advantage of the contrast in density of gold (ρ=19.3)
relative to quartz (ρ=2.65).
Renewable Energy Potential: The unique landscape and infrastructure makes Hill End ideal for the
establishment of renewable sources of power. The Crudine Ridge Windfarm is only 30km from the project
site and Vertex plans to examine a pumped hydro-electricity scheme as an integral part of any proposed
development. The topography and existing mine workings including shafts and adits make the
establishment of a pumped hydro scheme achievable at modest expense.
Benign Tailings: The tailings will essentially be quartz with little to no sulphide minerals.
Hargraves Gold Project (NSW)
• Hargraves Gold project is located approximately 2 5 km south of the town of Mudgee.
• The goldfield is 4 x 10 km with numerous mineralised structures with little modern exploration.
• An updated mineral resource in accordance with JORC 2012 Code was completed by SRK Consulting
(Australasia) Pty Ltd (SRK) – total of 2.3Mt at 2.38g/t Au for 177koz Au.
Hill End Gold Project (NSW)
• Consists of 10 mining leases and three Exploration Licences located in the core of the Hill End Trough on
the eastern Lachlan Fold Belt.
• 14km of continuous gold lode with gold recovery rate to gravity at +90%.
• Work undertaken in 2015 by Hill End Gold Limited (HEG) culminated in a JORC 2012 resource estimate of
80,000 oz Au @ 1.7 g/t to 150m depth.
Pride of Elvire Gold Project (WA)
•
•
Tenements surround the Mt. Elvire homestead approximately 210km north of Southern Cross in Western
Australia
The project has seen historical drilling with encouraging gold results achieved.
Taylors Rock Project (WA)
• Located 80km WSW of Norseman in the Southern Goldfields region of Western Australia.
• The project has both Gold and Nickel potential, interesting historical intercepts have recorded encouraging
mineralisation.
MINERAL RESOURCE STATEMENT
The resource estimates are classified in accordance with the Australasian Code for Reporting of Identified Mineral
Resources and Ore Reserves (JORC, 2012). The Reward estimate was completed by Andrew Hawker of HGS Australia.
Mr Hawker has sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition
of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Hawker
consents to the inclusion in the report of the matters based on his information in the form and context in which it
appears. The resource is classified as Inferred. The classification was considered appropriate based on drill hole
spacing, sample intervals, geological interpretation and representativeness of all available assay and density data.
The classification reflects the low confidence in short range grade estimations in the model.
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
Competent Persons Statement
The information in this report that relates to Exploration Results and Exploration Targets is based on information
compiled by Mr. Roger Jackson, a Director and Shareholder of the Company, who is a 25+ year Fellow of the
Australasian Institute of Mining and Metallurgy (FAusIMM), Fellow of the Australian Institute of Geoscientists (FAIG)
and a Member of Australian Institute of Company Directors. Mr. Jackson has sufficient experience which is relevant
to the style of mineralisation and type of deposits under consideration and to the activity which he is undertaking
to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of
Exploration results, Mineral Resources and Ore Reserves”. Mr. Jackson consents to the inclusion of the data
contained in relevant resource reports used for this announcement as well as the matters, form and context in which
the relevant data appears.
Forward Looking Statements and Important Notice
This report contains forecasts, projections and forward-looking information. Although the Company believes that its
expectations, estimates and forecast outcomes are based on reasonable assumptions it can give no assurance that
these will be achieved. Expectations and estimates and projections and information provided by the Company are
not a guarantee of future performance and involve unknown risks and uncertainties, many of which are out of Vertex
Minerals’ control.
Actual results and developments will almost certainly differ materially from those expressed or implied. Vertex
Minerals has not audited or investigated the accuracy or completeness of the information, statements and opinions
contained in this announcement. To the maximum extent permitted by applicable laws, Vertex Minerals makes no
representation and can give no assurance, guarantee or warranty, express or implied, as to, and takes no
responsibility and assumes no liability for the authenticity, validity, accuracy, suitability or completeness of, or any
errors in or omission from, any information, statement or opinion contained in this report and without prejudice, to
the generality of the foregoing, the achievement or accuracy of any forecasts, projections or other forward looking
information contained or referred to in this report.
Investors should make and rely upon their own enquiries before deciding to acquire or deal in the Company’s
securities.
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
JORC Code, 2012 Edition – Table 1 report template
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
Sampling
techniques
Drilling
techniques
JORC Code explanation
Commentary
• Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools appropriate
to the minerals under investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
• Aspects of the determination of mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1
m samples from which 3 kg was pulverised to produce a 30 g charge
for fire assay’). In other cases more explanation may be required,
such as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (eg
submarine nodules) may warrant disclosure of detailed information.
• Diamond drilling – Variable sample length depending on vein
thickness. Quartz veining was half-cored by diamond saw except
where veining was isolated and narrow. Core cut down long axis with
same relative portion of sampled for each interval. Routinely a few
centimetres of wall rock around the vein(s) were included in the
sample to ensure that the vein footwall and hanging wall were left
intact. Sampling of wall rock carried out adjacent to high grade
intervals to test for peripheral mineralization with minimal values
returned.
• Reverse Circulation Drilling – Samples collected over 1m intervals via
a cyclone and split to 3kg samples for submission to the laboratory.
The only RC holes that intercepted the mineralised domains
interpreted in this estimate have diamond core tails through the
mineralised intervals.
• Face Sampling - Face samples were approximately 8kgs of
representative vein material taken by a geologist from the face. Only
quartz vein material was sampled, with two or more samples
collected if two or more veins are present. The distance between
faces is approximately 1.75m and generally every second face was
sampled giving approximately 3.5m sample spacing or rarely a 5.4m
sample spacing
• Diamond Drilling – Surface diamond drill holes were either NQ3 or
HQ3 in size whereas underground drill holes were LTK48. Core was
oriented using the Ballmark method.
• Drill type (eg core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple
or standard tube, depth of diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by what method, etc).
•
Reverse Circulation Drilling – RC holes were generally 130mm
diameter face sampling bits with diamond core tails through
mineralized zones.
Criteria
Drill sample
recovery
Logging
JORC Code explanation
Commentary
• Method of recording and assessing core and chip sample recoveries
and results assessed.
• Measures taken to maximise sample recovery and ensure
representative nature of the samples.
• Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.
• Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
• Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
• The total length and percentage of the relevant intersections logged.
• Diamond Drilling - Core recovery (total core recovery) averaged
>99% and the average RQD was 75%.
• Reverse Circulation Drilling – Bag containing the 1m sample intervals
were weighed prior to sub-sampling. No RC intervals intercepted
mineralisation therefore recovery not an issue.
• There is no apparent relationship between sample recovery and
grade.
• Core was laid out in an angle iron with a base of hole line marked for
core orientation. All artificial core breaks were marked by red
chinagraph crosses. The core also had metre marks, tray and hole
numbers marked in chinagraph pencil prior to digital photography.
Geotechnical logging was completed with recovery, rock quality
designation (RQD), fracture frequency and orientation quality digitally
recorded in Excel spreadsheets. Core was logged for geological and
geotechnical parameters, with data collected digitally and transferred
directly to the database. Holes were logged in detail for alteration,
lithology, structure, vein style and mineralisation by geologists with
data being plotted and interpreted on section during drilling. High
quality digital photographs are available for all recent core.
• Reverse Circulation Drilling – RC holes logged for lithology, colour,
structure, alteration, mineralisation, weathering & oxidation, and vein
quartz characteristics. As field staff sampled each hole the following
information was recorded: Hole Name, Sample Name, Interval,
Sample date, sampler name(s), Sample Mass, and sample moisture.
This data was subsequently digitally recorded in Excel spreadsheets.
Subsampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether quarter, half or all core
taken.
• If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
• For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
• Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
• Measures taken to ensure that the sampling is representative of the in
• Diamond Drilling - Core was cut down the structural long axis and the
same relative portion of half core was always sampled. Sample
intervals, true vein thickness, angle of vein to core axis and vein
composition were recorded.
For screen fire assays each core sample was submitted to the
laboratory, weighed, dried, and then pulverised in its entirety in an
LM2 to a P85 of -75 microns. For Leachwell digestion methods
sample protocol involved drill core samples of approximately 1kg
weighed, dried, crushed and pulverised in an LM2 (removable-bowl
Criteria
Quality of
assay data
and
laboratory
tests
JORC Code explanation
Commentary
situ material collected, including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of the material
being sampled.
pulveriser) to 85% passing -75 micron.
• Reverse Circulation Drilling - RC drilling: dust samples were collected
in a side-mounted cyclone and dumped into large plastic bags
annotated with the Hole Number and the interval depth. The bags
were stacked in order at each site. A wet sample was frequently
encountered at the water table. In all cases the water was able to be
controlled and only a few samples were damp in the entire program.
This is probably due to free draining old workings below the area of
RC drilling. After weighing on a floor scale, each sample was
carefully passed through a cradle riffle splitter by 2 field assistants
sufficient to produce a ~3kg sample for dispatch to the laboratory.
• Sample sizes are appropriate for the grain size of the material being
sampled.
• No systematic collection of field duplicate or second half sampling
was recorded.
• Prior to January 2007 all HEGL core samples were analysed by the
screen fire assay technique at the ALS Chemex Laboratory in
Orange, NSW. Each core sample was submitted to the laboratory,
weighed, dried, and then pulverised in its entirety in an LM2 to a P85
of -75 microns. The entire sample was weighed and wet screened
using -75 micron disposable nylon screen. The +75 micron fraction
was dried in aluminium trays, weighed and fire assayed to extinction.
The -75 micron fraction was collected using flocculant, the liquor then
decanted and the fines sample dried in an oven. This was
homogenised in the LM2, weighed and fire assayed in duplicate using
a 50 g charge. The assays for the -75 micron fraction were averaged
and a weighted average is calculated with the +75 micron fraction.
• In January 2007, drill core samples entered the production stream at
SGS Labs-Townsville and were assayed for gold by accelerated
cyanide leach using “Leachwell” reagent with fire assay finish.
Sample protocol involved drill core samples of approximately 1kg
weighed, dried, crushed and pulverised in an LM2 (removable-bowl
pulveriser) to 85% passing -75 micron followed by a quartz flush.
Both quartz flush and the sample were inserted in a Leachwell bottle
filled with water and a predetermined number of Leachwell tablets.
The containers were rolled for 24 hours whereupon the liquor was
• The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is considered
partial or total.
• For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.
• Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels
of accuracy (ie lack of bias) and precision have been established.
Criteria
JORC Code explanation
Commentary
•
•
•
•
•
homogenous and a subsample is extracted for fire assay. For
assays greater than 10g/t, bottle tails were washed filtered and fire
assayed. For assays greater than 50g/t, bottle tails were washed
filtered and screen fire assayed. This additional protocol ensured
coarse gold that may not have been dissolved in the accelerated
cyanide leach process was captured.
For HEGL, Reverse Circulation drilling produced 1 metre samples
which initially were all submitted for