Reward Mining Leases Renewed for Maximum Term
Released
Released
Announcement PDF
Reward Mining Lease renewals granted the full term of 21
years
ASX ANNOUNCEMENT 4TH JUNE 2024
HIGHLIGHTS:
•
Maximum renewal term granted for 6 key Mining Leases:
ü
ü
ü
ü
ü
ü
•
GL 5846 (20-year renewal);
ML 49 (21-year renewal);
ML 50 (21-year renewal);
ML 315 (21-year renewal);
ML 316 (21-year renewal); and
ML 317 (21-year renewal).
The Reward Gold Mine is well-placed for a simple start-up:
ü Gekko plant purchased to upgrade and expand the existing Hill End Gravity plant
ü The existing gravity processing plant is located adjacent to the high grade Reward Gold
Mine portal.
ü Existing mine development extends into the resource, so only stripping and
refurbishment of the access is required.
ü Second means of egress is already established.
ü Some underground fleet and utility services are already in place.
ü Permitted Mining licence and DA in place for plant, stockpiles, and the Reward
underground mine. Only a change of scale required by EPA.
•
Work is well advanced on the Hill End plant component of the refurbishment with the Morningstar
plant to be removed in the coming weeks.
VERTEX MINERALS LIMITED (ASX:VTX) (“Vertex” or the “Company”) is pleased to announce that it has
been granted renewal for the full renewal term, as permissible under the Mining Act 1992 (NSW) and
Native Title Act 1993 (Cth), by the Department of Regional NSW for the below listed Mining Leases:
•
•
•
•
•
•
GL 5846 (20-year renewal);
ML 49 (21-year renewal);
ML 50 (21-year renewal);
ML 315 (21-year renewal);
ML 316 (21-year renewal); and
ML 317 (21-year renewal).
Vertex Minerals Executive Chairman, Roger Jackson said,
“The grant of the maximum permissible renewal terms for these Mining Leases provide the strongest
security of tenure under the Mining Act 1992 (NSW) for the Reward Gold Mine and the broader Hill End
Gold Projects. This security of tenure is critical in providing Vertex Minerals Limited with the confidence to
justify the resources required for the commencement of operations at the Reward Gold Mine. It also ensures
the Company’s resources are focused on the responsible and sustainable development of the underlying
mineral resources at Hill End, as opposed to the administrative expenditures required in preparing renewal
applications.”
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
Figure 1 Plan of Vertex Hill End Tenements
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
EL 5868
Hill End
Registered Holder/
Grant/ Application Date Expiry Date
Applicant
Vertex Minerals Limited
18/06/2001
18/06/2024
Current
16 Units
EL 6996
Hargraves
Vertex Minerals Limited
21/12/2007
21/12/2025
Current
6 Units
Chambers Creek Vertex Minerals Limited
Tenement
EL 8289
Project
Status
Area
20/08/2014
20/08/2029
Current
1 Unit
EL 9247
Randwick
Vertex Minerals Limited
5/08/2021
5/08/2027
Current
2 Units
EL 9413
Sawpit Gully
Vertex Minerals Limited
31/05/2022
31/05/2028
Current
1 Unit
EL 9434
Hill End South
Vertex Minerals Limited
13/07/2022
13/07/2028
Current
30 Units
EL 9485
Big Nugget Hill
Vertex Minerals Limited
6/11/2022
6/11/2028
Current
1 Unit
EL 9564
Manoneys Cnr
Vertex Minerals Limited
3/05/2023
3/05/2029
Current
2 Units
GL 5846
Vertex Minerals Limited
15/02/1968
7/12/2044
Current
2.044 ha
Vertex Minerals Limited
30/07/1975
7/12/2045
Current
1.618 ha
Vertex Minerals Limited
30/07/1975
7/12/2045
Current
3.02 ha
ML 315
Switchback
Consolidated
West
West Nuggetty
Gully
South Star
Vertex Minerals Limited
8/12/1976
8/12/2045
Current
6.671 ha
ML 316
South Star
Vertex Minerals Limited
8/12/1976
7/12/2045
Current
8.846 ha
ML 317
Vertex Minerals Limited
8/12/1976
7/12/2045
Current
7 ha
Vertex Minerals Limited
20/01/1981
19/01/2033
Current
22 ha
ML 914
South Star
Consolidated Amalgamated
South Star
Vertex Minerals Limited
20/01/1981
19/01/2033
Current
21.69 ha
ML 49
ML 50
ML 913
ML 915
Goldconda
Vertex Minerals Limited
4/02/1981
3/02/2033
Current
13.27 ha
ML 1116
Fosters
Vertex Minerals Limited
28/03/1984
16/10/2034
Current
15.71 ha
ML 1541
Patriarch - TSF
Vertex Minerals Limited
17/10/2003
16/10/2034
Current
279.2 ha
EPL 12008
Hill End
Vertex Minerals Limited
16/04/2004
-
Issued
-
Figure 2 Status of Hill End Tenements
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
This announcement has been approved by the Board of Vertex Minerals Limited.
Further Information:
Roger Jackson, Executive Chairman
roger@vertexminerals.com.au
Tully Richards, Technical Director
tully@vertexminerals.com.au
Follow Vertex Minerals on LinkedIn
ABOUT VERTEX MINERALS LIMITED
Vertex Minerals Limited (ASX: VTX) is an Australian-based gold mining and exploration company
developing its advanced Hill End gold projects located in the highly prospective Eastern Lachlan Fold
Belt of Central West NSW. Other Company assets include the Pride of Elvire gold project and Taylor
Rock gold/nickel/lithium project both located in the Eastern Goldfields of WA. The focus of Vertex
Minerals is to advance the commercial production of gold from its NSW projects embracing an ethical
and environmentally sustainable approach:
•
•
•
•
•
Gravity Separation: The deportment of gold at the Hill End Project allows high recovery to a
concentrate produced using gravity separation techniques.
Direct Smelting: The use of direct smelting of a gold concentrate eliminates the need to use
cyanide as a solvent.
Contrast in Density: These separation techniques take advantage of the contrast in density of
gold (ρ=19.3) relative to quartz (ρ=2.65).
Benign Tailings: The tailings will essentially be quartz with little to no sulphide minerals.
Recycled Water: The water can be fully recycled and is clean due to having no metals in the ore.
HARGRAVES GOLD PROJECT (NSW)
•
•
•
Hargraves Gold project is located approximately 25 km south of the town of Mudgee.
The goldfield is 4 x 10 km with numerous mineralised structures with little modern exploration.
An updated mineral resource in accordance with JORC 2012 Code was completed by SRK
Consulting (Australasia) Pty Ltd (SRK) – a total of 2.3Mt at 2.38g/t Au for 177koz Au.
HILL END GOLD PROJECT (NSW)
•
Consists of 10 mining leases and three Exploration Licenses located in the core of the Hill End
Trough on the eastern Lachlan Fold Belt.
•
Gravity Gold Plant
•
•
PFS completed for the Reward Gold Mine
24 km of continuous gold lode with gold recovery rate to gravity at +90%.
PRIDE OF ELVIRE GOLD PROJECT (WA)
•
Tenements surround the Mt. Elvire homestead approximately 21 0km north of Southern
Cross in Western Australia
•
The project has seen historical drilling with encouraging gold results achieved.
TAYLOR ROCK PROJECT (WA)
•
•
Located 80 km WSW of Norseman in the Southern Goldfields region of Western Australia.
The project has both Gold and Nickel potential, interesting historical intercepts have
recorded encouraging mineralisation.
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
HILL END GLOBAL RESOURCE
Deposit
Reward Gold Mine1
Hill End Project Mineral Resource
Estimate
Classification
Tonnes
Grade
(kt)
Au (g/t)
Contained
Au (koz)
Indicated
Inferred
141
278
419
15.5
17.3
16.7
71
155
225
Indicated
Inferred
1,109
1,210
2,319
2.7
2.1
2.4
97
80
178
Indicated
Inferred
413
1,063
1,476
1.4
1.8
1.7
19
61
80
Indicated
Inferred
1,663
2,551
4,214
3.5
3.6
3.6
187
296
483
Sub Total
Hargraves Project2
Sub Total
Red Hill Project
Sub Total
Project Total
Grand Total
COMPETENT PERSONS STATEMENT
The information in this report that relates to Exploration Results and Exploration Targets is based on
information compiled by Mr. Roger Jackson, a Director and Shareholder of the Company, who is a
25+ year Fellow of the Australasian Institute of Mining and Metallurgy (FAusIMM), Fellow of the
Australian Institute of Geoscientists (FAIG) and a Member of Australian Institute of Company
Directors. Mr. Jackson has sufficient experience which is relevant to the style of mineralisation and
type of deposits under consideration and to the activity which he is undertaking to qualify as a
Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of
Exploration results, Mineral Resources and Ore Reserves”. Mr. Jackson consents to the inclusion of
the data contained in relevant resource reports used for this announcement as well as the matters,
form and context in which the relevant data appear.
FORWARD LOOKING STATEMENTS AND IMPORTANT NOTICE
This report contains forecasts, projections and forward-looking information. Although the Company
believes that its expectations, estimates and forecast outcomes are based on reasonable
assumptions it can give no assurance that these will be achieved. Expectations and estimates and
projections and information provided by the Company are not a guarantee of future performance and
involve unknown risks and uncertainties, many of which are out of Vertex Minerals’ control.
Actual results and developments will almost certainly differ materially from those expressed or
implied. Vertex Minerals has not audited or investigated the accuracy or completeness of the
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
information, statements and opinions contained in this announcement. To the maximum extent
permitted by applicable laws, Vertex Minerals makes no representation and can give no assurance,
guarantee or warranty, express or implied, as to, and takes no responsibility and assumes no liability
for the authenticity, validity, accuracy, suitability or completeness of, or any errors in or omission
from, any information, statement or opinion contained in this report and without prejudice, to the
generality of the foregoing, the achievement or accuracy of any forecasts, projections or other
forward looking information contained or referred to in this report. Investors should make and rely
upon their own enquiries before deciding to acquire or deal in the Company’s securities.
JORC COMPLIANCE STATEMENTS
Where statements in this announcement refer to exploration results which previously been reported,
the Company confirms that it is not aware of any new information or data that materially affects the
information included in the original announcements, and in the case of estimates of Mineral
Resources, that all material assumptions and technical parameters underpinning the estimates in the
relevant market announcements continue to apply and have not materially changed. The Company
confirms that the form and context in which the Competent Persons’ findings are presented have not
materially modified from the original market announcements.
1 For further details of the current resource at Reward, refer ASX Announcement dated 26 June 2023
2 For further details of the resource at Hargraves and Red Hill, refer to the IGR in the Company’s listing
prospectus dated 21 October 2021 and released on ASX on 12 January 2022.
3 For further details of the Fosters Exploration Target, refer ASX Announcement dated 29 August 2023
Sources of information and maps include:
•
Geological Survey of NSW Department of Mines survey report GS 1975/279, “Appraisal of geological work involved
in mapping in the South Star area, Hill End” by Bowman, Holmes and Baker in October 1975.
•
Geological Survey of NSW Department of Mines survey report GS 1977/045, “The South Star line of reefs, Hill End,
NSW” by Weber and Baker in March 1977. Good, detailed information on the South Star line of lode.
W. www.Vertexminerals.com
E. info@vertexminerals.com.au
Share your feedback
Discover